EP3080310 - COMBINED SYSTEM FOR PRODUCING STEEL AND METHOD FOR OPERATING THE COMBINED SYSTEM [Right-click to bookmark this link] | Status | Opposition rejected Status updated on 08.03.2024 Database last updated on 29.03.2025 | |
Former | The patent has been granted Status updated on 26.10.2018 | ||
Former | Grant of patent is intended Status updated on 18.07.2018 | Most recent event Tooltip | 08.03.2024 | Opposition rejected | published on 10.04.2024 [2024/15] | Applicant(s) | For all designated states thyssenkrupp AG ThyssenKrupp Allee 1 45143 Essen / DE | [2017/24] |
Former [2016/42] | For all designated states ThyssenKrupp AG ThyssenKrupp Allee 1 45143 Essen / DE | Inventor(s) | 01 /
ACHATZ, Reinhold Zur Waldesquelle 53 45259 Essen / DE | 02 /
WAGNER, Jens Hohemarkstrasse 37 60439 Frankfurt a.M. / DE | 03 /
OLES, Markus Seilerweg 18 45527 Hattingen / DE | 04 /
SCHMÖLE, Peter Kullrichstrasse 26 44141 Dortmund / DE | 05 /
KLEINSCHMIDT, Ralph Neulens Höhe 2C 45472 Mülheim a.d.R. / DE | 06 /
MEISSNER, Christoph Moltkstr. 14 44135 Dortmund / DE | 07 /
BREDEMEYER, Niels Altenbredde 55 45731 Waltrop / DE | 08 /
VÖLKL, Johannes Promenade 9 65779 Kelkheim / DE | [N/P] |
Former [2018/48] | 01 /
ACHATZ, Reinhold Zur Waldesquelle 53 45259 Essen / DE | ||
02 /
WAGNER, Jens Hohemarkstrasse 37 60439 Frankfurt a.M. / DE | |||
03 /
OLES, Markus Im Mühlenwinkel 2 45525 Hattingen / DE | |||
04 /
SCHMÖLE, Peter Kullrichstrasse 26 44141 Dortmund / DE | |||
05 /
KLEINSCHMIDT, Ralph Neulens Höhe 2C 45472 Mülheim a.d.R. / DE | |||
06 /
MEISSNER, Christoph Moltkstr. 14 44135 Dortmund / DE | |||
07 /
BREDEMEYER, Niels Altenbredde 55 45731 Waltrop / DE | |||
08 /
VÖLKL, Johannes Promenade 9 65779 Kelkheim / DE | |||
Former [2016/42] | 01 /
ACHATZ, Reinhold Zur Waldesquelle 53 45259 Essen / DE | ||
02 /
WAGNER, Jens Hohemarkstrasse 37 60439 Frankfurt a.M. / DE | |||
03 /
OLES, Markus Im Mühlenwinkel 2 45525 Hattingen / DE | |||
04 /
SCHMÖLE, Peter Kullrichstrasse 26 44141 Dortmund / DE | |||
05 /
KLEINSCHMIDT, Ralph Neulens Höhe 2C 45472 Mülheim a.d.R. / DE | |||
06 /
MEISSNER, Christoph Moltkstr. 14 44135 Dortmund / DE | |||
07 /
BREDEMEYER, Niels Altenbredde 55 45731 Waltrop / DE | |||
08 /
VÖLKL, Johannes Feldbank 86 44265 Dortmund / DE | Representative(s) | Andrejewski - Honke Patent- und Rechtsanwälte Partnerschaft mbB An der Reichsbank 8 45127 Essen / DE | [N/P] |
Former [2018/48] | thyssenkrupp Intellectual Property GmbH ThyssenKrupp Allee 1 45143 Essen / DE | ||
Former [2016/42] | ThyssenKrupp Intellectual Property GmbH ThyssenKrupp Allee 1 45143 Essen / DE | Application number, filing date | 14821499.2 | 11.12.2014 | [2016/42] | WO2014EP03318 | Priority number, date | DE201310113950 | 12.12.2013 Original published format: DE102013113950 | [2016/42] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2015086152 | Date: | 18.06.2015 | Language: | DE | [2015/24] | Type: | A1 Application with search report | No.: | EP3080310 | Date: | 19.10.2016 | Language: | DE | The application published by WIPO in one of the EPO official languages on 18.06.2015 takes the place of the publication of the European patent application. | [2016/42] | Type: | B1 Patent specification | No.: | EP3080310 | Date: | 28.11.2018 | Language: | DE | [2018/48] | Search report(s) | International search report - published on: | EP | 18.06.2015 | Classification | IPC: | C21B5/06, C21B7/00, C21B5/00, C21C5/28, F27D17/00 | [2018/27] | CPC: |
C21B5/06 (EP,KR,US);
F27D17/00 (RU);
C21C5/285 (KR,US);
C21B7/002 (EP,KR,US);
C21C5/38 (KR);
C21C5/40 (US);
C25B1/04 (EP,KR,US);
F01K7/16 (KR);
F27B1/025 (KR);
F27B1/26 (KR);
F27D17/10 (EP,US);
F27D17/20 (EP);
F27D17/30 (EP,US);
C21B2005/005 (US);
C21B2100/60 (EP,US);
C21B2100/62 (EP,US);
C21B2300/02 (US);
F27M2001/02 (US);
H01M2220/10 (US);
Y02E50/10 (EP,US);
Y02E60/10 (EP);
Y02E60/36 (EP,KR,US);
Y02P10/122 (EP);
Y02P10/143 (EP,US);
|
Former IPC [2016/42] | C21B5/06, C21B7/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/42] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ANLAGENVERBUND ZUR STAHLERZEUGUNG UND VERFAHREN ZUM BETREIBEN DES ANLAGENVERBUNDES | [2016/42] | English: | COMBINED SYSTEM FOR PRODUCING STEEL AND METHOD FOR OPERATING THE COMBINED SYSTEM | [2016/42] | French: | RÉSEAU D'INSTALLATIONS POUR LA PRODUCTION D'ACIER ET PROCÉDÉ POUR FAIRE FONCTIONNER CE RÉSEAU D'INSTALLATIONS | [2016/42] | Entry into regional phase | 08.06.2016 | National basic fee paid | 08.06.2016 | Designation fee(s) paid | 08.06.2016 | Examination fee paid | Examination procedure | 08.06.2016 | Examination requested [2016/42] | 18.01.2017 | Amendment by applicant (claims and/or description) | 06.07.2018 | Observations by third parties | 19.07.2018 | Communication of intention to grant the patent | 02.10.2018 | Fee for grant paid | 02.10.2018 | Fee for publishing/printing paid | 02.10.2018 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
21.08.2019
27.08.2019
ADMISSIBLE ArcelorMittal 24-26, Boulevard d'Avranches 1160 Luxembourg / LU Opponent's representative Lavoix 2, place d'Estienne d'Orves 75441 Paris Cedex 09 / FR | [2021/11] |
Former [2019/39] | |||
Opponent(s) | 01
21.08.2019
ADMISSIBLE ArcelorMittal 24-26, Boulevard d'Avranches 1160 Luxembourg / LU | 11.09.2019 | Invitation to proprietor to file observations on the notice of opposition | 16.12.2019 | Reply of patent proprietor to notice(s) of opposition | 31.03.2021 | Date of oral proceedings | 25.10.2021 | Despatch of minutes of oral proceedings | 25.10.2021 | Date of despatch of rejection of opposition | 27.11.2023 | Legal effect of rejection of opposition [2024/15] | Appeal following opposition | 06.12.2021 | Appeal received No. T2176/21 | 06.12.2021 | Payment of appeal fee | 16.02.2022 | Statement of grounds filed | 27.11.2023 | Result of appeal procedure: appeal of the opponent was rejected | 12.02.2024 | Despatch of the decision of the Board of Appeal | 27.11.2023 | Date of oral proceedings | Fees paid | Renewal fee | 23.12.2016 | Renewal fee patent year 03 | 21.12.2017 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.12.2014 | AL | 28.11.2018 | CY | 28.11.2018 | CZ | 28.11.2018 | DK | 28.11.2018 | EE | 28.11.2018 | FI | 28.11.2018 | HR | 28.11.2018 | LT | 28.11.2018 | LV | 28.11.2018 | MC | 28.11.2018 | MK | 28.11.2018 | MT | 28.11.2018 | RO | 28.11.2018 | RS | 28.11.2018 | SI | 28.11.2018 | SK | 28.11.2018 | SM | 28.11.2018 | TR | 28.11.2018 | IE | 11.12.2018 | LU | 11.12.2018 | CH | 31.12.2018 | LI | 31.12.2018 | BG | 28.02.2019 | NO | 28.02.2019 | GR | 01.03.2019 | IS | 28.03.2019 | PT | 28.03.2019 | [2020/31] |
Former [2020/17] | AL | 28.11.2018 | |
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
MT | 28.11.2018 | ||
RO | 28.11.2018 | ||
RS | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
TR | 28.11.2018 | ||
IE | 11.12.2018 | ||
LU | 11.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2020/08] | AL | 28.11.2018 | |
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
MT | 28.11.2018 | ||
RO | 28.11.2018 | ||
RS | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
IE | 11.12.2018 | ||
LU | 11.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2020/04] | AL | 28.11.2018 | |
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
RO | 28.11.2018 | ||
RS | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
IE | 11.12.2018 | ||
LU | 11.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/50] | AL | 28.11.2018 | |
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
RO | 28.11.2018 | ||
RS | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
IE | 11.12.2018 | ||
LU | 11.12.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/48] | AL | 28.11.2018 | |
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
RO | 28.11.2018 | ||
RS | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
IE | 11.12.2018 | ||
LU | 11.12.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/40] | AL | 28.11.2018 | |
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
RO | 28.11.2018 | ||
RS | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
LU | 11.12.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/39] | AL | 28.11.2018 | |
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
RO | 28.11.2018 | ||
RS | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
LU | 11.12.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/37] | AL | 28.11.2018 | |
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
RO | 28.11.2018 | ||
RS | 28.11.2018 | ||
SM | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/35] | AL | 28.11.2018 | |
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
RS | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/34] | AL | 28.11.2018 | |
DK | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
RS | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/26] | AL | 28.11.2018 | |
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
RS | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/25] | FI | 28.11.2018 | |
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
RS | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
Former [2019/24] | FI | 28.11.2018 | |
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
Former [2019/23] | FI | 28.11.2018 | |
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
IS | 28.03.2019 | ||
Former [2019/22] | FI | 28.11.2018 | |
LT | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
IS | 28.03.2019 | ||
Former [2019/21] | FI | 28.11.2018 | |
LT | 28.11.2018 | ||
NO | 28.02.2019 | ||
IS | 28.03.2019 | ||
Former [2019/20] | LT | 28.11.2018 | |
NO | 28.02.2019 | Cited in | International search | [Y]WO2011018124 (SILICON FIRE AG [CH], et al); | [Y]DE102011077819 (SIEMENS AG [DE]); | [Y]EP2657215 (SICHUAN DAXING ENERGY CO LTD [CN]); | Opposition | US5454853 |