blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3019689

EP3019689 - SYSTEM AND METHOD FOR OPERATING A PUMP IN A DOWNHOLE TOOL [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  28.08.2020
Database last updated on 26.06.2024
FormerThe patent has been granted
Status updated on  20.09.2019
FormerGrant of patent is intended
Status updated on  15.05.2019
FormerExamination is in progress
Status updated on  31.03.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For:FR 
Services Pétroliers Schlumberger
42, rue Saint Dominique
75007 Paris / FR
For:GB  NL 
Schlumberger Holdings Limited
P.O. Box 71
Craigmuir Chambers
Road Town, Tortola 1110 / VG
For:AL  AT  BE  BG  CH  CY  CZ  DE  DK  EE  ES  FI  GR  HR  HU  IE  IS  IT  LI  LT  LU  LV  MC  MK  MT  NO  PL  PT  RO  RS  SE  SI  SK  SM  TR 
Schlumberger Technology B.V.
Parkstraat 83-89
2514 The Hague / NL
[2016/20]
Inventor(s)01 / HSU, Kai
4835 Durham Lane
Sugar Land, TX 77479 / US
02 / INDO, Kentaro
4310 Browning Court
Sugar Land, TX 77479 / US
03 / POP, Julian
9550 Ella Lee Lane 2101
Houston, TX 77063 / US
 [2016/20]
Representative(s)Schlumberger Intellectual Property Department
Parkstraat 83
2514 JG Den Haag / NL
[2019/43]
Former [2016/20]Schlumberger Cambridge Research Limited
Intellectual Property Law
High Cross
Madingley Road
Cambridge CB3 0EL / GB
Application number, filing date14822169.001.07.2014
[2016/20]
WO2014US45013
Priority number, dateUS20131393759409.07.2013         Original published format: US201313937594
[2016/20]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015006093
Date:15.01.2015
Language:EN
[2015/02]
Type: A1 Application with search report 
No.:EP3019689
Date:18.05.2016
Language:EN
The application published by WIPO in one of the EPO official languages on 15.01.2015 takes the place of the publication of the European patent application.
[2016/20]
Type: B1 Patent specification 
No.:EP3019689
Date:23.10.2019
Language:EN
[2019/43]
Search report(s)International search report - published on:KR15.01.2015
(Supplementary) European search report - dispatched on:EP21.03.2017
ClassificationIPC:E21B21/00, E21B43/12, E21B37/00
[2016/20]
CPC:
E21B47/06 (EP,US); E21B49/082 (EP,US); E21B49/0875 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/20]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:SYSTEM UND VERFAHREN ZUM BETREIBEN EINER PUMPE IN EINEM BOHRLOCHWERKZEUG[2016/20]
English:SYSTEM AND METHOD FOR OPERATING A PUMP IN A DOWNHOLE TOOL[2016/20]
French:SYSTÈME ET PROCÉDÉ DE COMMANDE D'UNE POMPE DANS UN OUTIL DE FOND[2016/20]
Entry into regional phase05.01.2016National basic fee paid 
05.01.2016Search fee paid 
05.01.2016Designation fee(s) paid 
05.01.2016Examination fee paid 
Examination procedure05.01.2016Examination requested  [2016/20]
12.08.2016Amendment by applicant (claims and/or description)
04.04.2017Despatch of a communication from the examining division (Time limit: M06)
06.10.2017Reply to a communication from the examining division
26.01.2018Despatch of a communication from the examining division (Time limit: M03)
01.05.2018Reply to a communication from the examining division
25.06.2018Despatch of a communication from the examining division (Time limit: M06)
13.12.2018Reply to a communication from the examining division
16.05.2019Communication of intention to grant the patent
05.09.2019Fee for grant paid
05.09.2019Fee for publishing/printing paid
12.09.2019Receipt of the translation of the claim(s)
Opposition(s)24.07.2020No opposition filed within time limit [2020/40]
Fees paidRenewal fee
11.07.2016Renewal fee patent year 03
28.07.2017Renewal fee patent year 04
30.07.2018Renewal fee patent year 05
15.07.2019Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU01.07.2014
AL23.10.2019
AT23.10.2019
CY23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
MK23.10.2019
MT23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
TR23.10.2019
BG23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
IE01.07.2020
LU01.07.2020
[2022/32]
Former [2022/27]HU01.07.2014
AL23.10.2019
AT23.10.2019
CY23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
MT23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
TR23.10.2019
BG23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
IE01.07.2020
LU01.07.2020
Former [2021/20]AL23.10.2019
AT23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
IE01.07.2020
LU01.07.2020
Former [2021/15]AL23.10.2019
AT23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2020/51]AL23.10.2019
AT23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2020/38]AL23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2020/37]AL23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2020/36]AL23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
BG23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2020/35]AL23.10.2019
CZ23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
BG23.01.2020
GR24.01.2020
IS24.02.2020
PT24.02.2020
Former [2020/34]AL23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RS23.10.2019
SE23.10.2019
BG23.01.2020
GR24.01.2020
IS24.02.2020
PT24.02.2020
Former [2020/32]AL23.10.2019
FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RS23.10.2019
SE23.10.2019
BG23.01.2020
GR24.01.2020
IS24.02.2020
PT24.02.2020
Former [2020/25]FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RS23.10.2019
SE23.10.2019
BG23.01.2020
GR24.01.2020
IS24.02.2020
PT24.02.2020
Former [2020/24]FI23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
SE23.10.2019
BG23.01.2020
GR24.01.2020
IS24.02.2020
PT24.02.2020
Former [2020/23]FI23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
SE23.10.2019
BG23.01.2020
GR24.01.2020
PT24.02.2020
Former [2020/22]FI23.10.2019
LT23.10.2019
NL23.10.2019
SE23.10.2019
BG23.01.2020
PT24.02.2020
Former [2020/20]NL23.10.2019
Documents cited:Search[A]WO02093126  (BAKER HUGHES INC [US]) [A] 1-15 * pages 3, 4, 7 - page 17; figures 8, 9A, 9B *;
 [A]US2004260497  (DIFOGGIO ROCCO [US], et al) [A] 1-15 * paragraphs [0011] , [0 44] , [0 45] , [0 53] , [0 60] , [0 61] , [0 62] , [0 63] - paragraphs [0065] , [0 66] , [0 68] , [0 70]; figures 7, 11, 12, 13A, 13B, 13C, 13D *;
 [A]US2011042070  (HSU KAI [US], et al) [A] 1-15* paragraphs [0017] , [0 20] , [0 21] , [0 30] , [0 42] , [0 49] , [0 51] , [0 52] - paragraphs [0056] , [0 57] , [0 58] , [0 60] , [0 61] , [0 73] , [0 76] , [0 78]; figures 1, 2A, 3A, 3B, 4A, 4B, 4C, 5B; claim 1 *;
 [A]WO2011049571  (HALLIBURTON ENERGY SERV INC [US], et al) [A] 1-15 * pages 1, 2, 5 - pages 10, 12; figures 3, 5, 6 *;
 [AP]WO2013184190  (SCHLUMBERGER CA LTD [CA], et al) [AP] 1-15 * paragraphs [0019] , [0 20] , [0 22] , [0 23] , [0 24] , [0 25] , [0 27] , [0 30] , [0 31]; figures 1A, 1B, *
International search[A]US2008040086  (BETANCOURT SORAYA S [US], et al);
 [A]US2008083273  (SROKA STEFAN [DE], et al);
 [A]US2011218736  (PELLETIER MICHAEL T [US]);
 [A]US2012018152  (ZUILEKOM ANTHONY H VAN [US], et al);
 [A]US2012222852  (PELLETIER MICHAEL T [US])
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.