EP3247542 - METHOD FOR PRODUCING GYPSUM FIBER BOARDS [Right-click to bookmark this link] | |||
Former [2017/48] | GYPSUM FIBER BOARD AND METHOD FOR PRODUCING GYPSUM FIBER BOARDS | ||
[2020/32] | Status | No opposition filed within time limit Status updated on 10.12.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 01.01.2021 | ||
Former | Grant of patent is intended Status updated on 29.07.2020 | ||
Former | Examination is in progress Status updated on 22.07.2019 | ||
Former | Request for examination was made Status updated on 27.10.2017 | ||
Former | The international publication has been made Status updated on 04.05.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Knauf Gips KG Am Bahnhof 7 97346 Iphofen / DE | [2017/48] | Inventor(s) | 01 /
VOIGT, Wolfgang Rodgasse 58 91593 Burgbernheim / DE | 02 /
SCHELLER, Lothar Ägidienstrasse 7 97346 Iphofen / DE | 03 /
BURCZECK, Jürgen Merowingerstrasse 6 97340 Segnitz / DE | 04 /
TSVETANOV, Vladimir Wohnkomplex "Petko Karavelov" Block 3 Eingang B App. 1 3700 Vidin / BG | 05 /
IVANOVA-TSANEVA, Vanya Wohnkomplex "Bononija" Block 21 Et. 5 App. 13 3700 Vidin / BG | [2017/48] | Representative(s) | Gleim, Christian Ragnar Gleim Petri Patent- und Rechtsanwaltspartnerschaft mbB Mergentheimer Straße 36 97082 Würzburg / DE | [N/P] |
Former [2021/05] | Gleim, Christian Ragnar Ludwigstraße 22 97070 Würzburg / DE | ||
Former [2017/48] | Petri, Lars GleimPetri Patent- und Rechtsanwaltskanzlei Pleichertorstraße 30 97070 Würzburg / DE | Application number, filing date | 14828448.2 | 22.12.2014 | [2017/48] | WO2014EP03457 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016101968 | Date: | 30.06.2016 | Language: | EN | [2016/26] | Type: | A1 Application with search report | No.: | EP3247542 | Date: | 29.11.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 30.06.2016 takes the place of the publication of the European patent application. | [2017/48] | Type: | B1 Patent specification | No.: | EP3247542 | Date: | 03.02.2021 | Language: | EN | [2021/05] | Search report(s) | International search report - published on: | EP | 30.06.2016 | Classification | IPC: | B28B1/52, C04B28/14, C04B11/00 | [2017/48] | CPC: |
C04B28/147 (EP,US);
B28B1/52 (US);
B28B1/521 (EP,US);
B28B19/0092 (US);
B28B5/026 (EP,US);
C04B11/002 (EP,US);
C04B18/241 (US);
C04B24/04 (US);
C04B28/146 (EP,US);
C04B40/0039 (US);
C04B2103/10 (US);
C04B2103/20 (US);
| C-Set: |
C04B28/146, C04B11/036, C04B18/241, C04B40/0032, C04B2103/20 (EP,US);
C04B28/147, C04B11/032, C04B18/241, C04B40/0032, C04B2103/20 (US,EP) | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/48] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR HERSTELLUNG VON GIPSFASERPLATTEN | [2020/32] | English: | METHOD FOR PRODUCING GYPSUM FIBER BOARDS | [2020/32] | French: | PROCÉDÉ DE PRODUCTION DE PLAQUES FIBREUSES DE PLÂTRE | [2020/32] |
Former [2017/48] | GIPSFASERPLATTE UND VERFAHREN ZUR HERSTELLUNG VON GIPSFASERPLATTEN | ||
Former [2017/48] | GYPSUM FIBER BOARD AND METHOD FOR PRODUCING GYPSUM FIBER BOARDS | ||
Former [2017/48] | PLAQUE FIBREUSE DE PLÂTRE ET PROCÉDÉ DE PRODUCTION DE PLAQUES FIBREUSES DE PLÂTRE | Entry into regional phase | 28.04.2017 | National basic fee paid | 28.04.2017 | Designation fee(s) paid | 28.04.2017 | Examination fee paid | Examination procedure | 28.04.2017 | Examination requested [2017/48] | 28.04.2017 | Date on which the examining division has become responsible | 05.03.2018 | Amendment by applicant (claims and/or description) | 25.07.2019 | Despatch of a communication from the examining division (Time limit: M06) | 03.02.2020 | Reply to a communication from the examining division | 01.07.2020 | Cancellation of oral proceeding that was planned for 17.11.2020 | 30.07.2020 | Communication of intention to grant the patent | 17.11.2020 | Date of oral proceedings (cancelled) | 08.12.2020 | Fee for grant paid | 08.12.2020 | Fee for publishing/printing paid | 08.12.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 04.11.2021 | No opposition filed within time limit [2022/02] | Fees paid | Renewal fee | 28.04.2017 | Renewal fee patent year 03 | 28.12.2017 | Renewal fee patent year 04 | 21.12.2018 | Renewal fee patent year 05 | 17.12.2019 | Renewal fee patent year 06 | 28.12.2020 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.12.2014 | AL | 03.02.2021 | CY | 03.02.2021 | CZ | 03.02.2021 | DK | 03.02.2021 | EE | 03.02.2021 | ES | 03.02.2021 | FI | 03.02.2021 | HR | 03.02.2021 | IT | 03.02.2021 | LT | 03.02.2021 | LV | 03.02.2021 | MC | 03.02.2021 | MK | 03.02.2021 | MT | 03.02.2021 | NL | 03.02.2021 | PL | 03.02.2021 | RO | 03.02.2021 | RS | 03.02.2021 | SE | 03.02.2021 | SK | 03.02.2021 | SM | 03.02.2021 | TR | 03.02.2021 | BG | 03.05.2021 | NO | 03.05.2021 | GR | 04.05.2021 | IS | 03.06.2021 | PT | 04.06.2021 | [2024/41] |
Former [2024/29] | HU | 22.12.2014 | |
AL | 03.02.2021 | ||
CY | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
MK | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
TR | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2024/22] | HU | 22.12.2014 | |
AL | 03.02.2021 | ||
CY | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
MK | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2023/30] | HU | 22.12.2014 | |
AL | 03.02.2021 | ||
CY | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2023/29] | HU | 22.12.2014 | |
AL | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2022/33] | AL | 03.02.2021 | |
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2022/23] | AL | 03.02.2021 | |
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2022/10] | AL | 03.02.2021 | |
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2022/08] | AL | 03.02.2021 | |
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2022/07] | AL | 03.02.2021 | |
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/50] | CZ | 03.02.2021 | |
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/49] | CZ | 03.02.2021 | |
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/48] | CZ | 03.02.2021 | |
EE | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/46] | FI | 03.02.2021 | |
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/42] | FI | 03.02.2021 | |
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/39] | FI | 03.02.2021 | |
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2021/38] | FI | 03.02.2021 | |
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2021/37] | FI | 03.02.2021 | |
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
RS | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2021/36] | FI | 03.02.2021 | |
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2021/35] | FI | 03.02.2021 | |
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
NO | 03.05.2021 | ||
PT | 04.06.2021 | ||
Former [2021/33] | FI | 03.02.2021 | |
LT | 03.02.2021 | ||
NO | 03.05.2021 | ||
PT | 04.06.2021 | Cited in | International search | [ID]DE2257827 (SIEMPELKAMP GMBH & CO) [ID] 11-15 * page 1, paragraph 1 - page 11, line 1; figures 1,2; claims 1-8 *; | [XI]EP0381847 (FULGURIT BAUSTOFFE GMBH [DE]) [X] 1-4,6,9 * column 1, line 1 - column 5, line 40; claims 1-20 * [I] 5,7,8,10; | [XI]EP0446693 (PRO MINERAL GES [DE], et al) [X] 1-3,6,9,10 * page 2, line 1 - page 5, line 34; figure 1; claims 1-13 * [I] 4,5,7,8; | [XI]DE4222872 (SIEMPELKAMP GMBH & CO [DE]) [X] 1-3,9,10 * column 1, line 34 - column 4, line 58; claims 1-10 * [I] 4-8; | [A]DE19534326 (SIEMPELKAMP GMBH & CO [DE]) [A] 1-15* column 1, line 3 - column 3, line 18; claims 1-7 *; | [XI]DE19912847 (LINDNER AG [DE]) [X] 1-6,9 * page 2, line 3 - page 7, line 27; figures 1,2; claims 1-13 * [I] 7,8,10; | [XI]DE10336569 (SIEMPELKAMP HANDLING SYS GMBH [DE]) [X] 1-3,5,9 * paragraphs [0001] , [0005] , [0009] - [0012]; claims 1-14 * [I] 4-8,10 | by applicant | DE2257827 |