blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3026920

EP3026920 - TRANSMISSION METHOD AND RECEPTION METHOD, AND TRANSMISSION DEVICE AND RECEPTION DEVICE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  04.09.2020
Database last updated on 03.10.2024
FormerThe patent has been granted
Status updated on  27.09.2019
FormerGrant of patent is intended
Status updated on  12.05.2019
FormerExamination is in progress
Status updated on  30.03.2018
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Sun Patent Trust
450 Lexington Avenue, 38th Floor
New York, NY 10017 / US
[2019/44]
Former [2016/33]For all designated states
Sun Patent Trust
450 Lexington Avenue, 38th Floor
New York NY 10017 / US
Former [2016/22]For all designated states
Panasonic Intellectual Property Corporation of America
20000 Mariner Avenue, Suite 200
Torrance, CA 90503 / US
Inventor(s)01 / TOMA, Tadamasa
c/o Panasonic Intellectual Prop. Mngt. Co., Ltd.
IP Mngt Dept.
7F OBP Panasonic Tower
1-61, Shiromi 2-chome, Chuo-ku Osaka-shi, Osaka 540-6207 / JP
02 / IGUCHI, Noritaka
c/o Panasonic Intellectual Prop. Mngt. Co., Ltd.
IP Mngt Dept.
7F OBP Panasonic Tower
1-61, Shiromi 2-chome, Chuo-ku Osaka-shi, Osaka 540-6207 / JP
03 / NISHI, Takahiro
c/o Panasonic Intellectual Prop. Mngt. Co., Ltd.
IP Mngt Dept.
7F OBP Panasonic Tower
1-61, Shiromi 2-chome, Chuo-ku Osaka-shi, Osaka 540-6207 / JP
04 / KATOU, Hisaya
c/o Panasonic Intellectual Prop. Mngt. Co., Ltd.
IP Mngt Dept.
7F OBP Panasonic Tower
1-61, Shiromi 2-chome, Chuo-ku Osaka-shi, Osaka 540-6207 / JP
 [2016/22]
Representative(s)Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstraße 4
80802 München / DE
[2016/22]
Application number, filing date14830237.522.07.2014
[2016/22]
WO2014JP03844
Priority number, dateUS201361858155P25.07.2013         Original published format: US 201361858155 P
US201361862115P05.08.2013         Original published format: US 201361862115 P
US201361863041P07.08.2013         Original published format: US 201361863041 P
US201361880283P20.09.2013         Original published format: US 201361880283 P
US201361883251P27.09.2013         Original published format: US 201361883251 P
US201361890981P15.10.2013         Original published format: US 201361890981 P
US201361892539P18.10.2013         Original published format: US 201361892539 P
JP2014014534415.07.2014         Original published format: JP 2014145344
[2016/22]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015011915
Date:29.01.2015
Language:JA
[2015/04]
Type: A1 Application with search report 
No.:EP3026920
Date:01.06.2016
Language:EN
[2016/22]
Type: B1 Patent specification 
No.:EP3026920
Date:30.10.2019
Language:EN
[2019/44]
Search report(s)International search report - published on:JP29.01.2015
(Supplementary) European search report - dispatched on:EP02.06.2016
ClassificationIPC:H04N21/242, H04H60/13, H04N21/435, H04N21/462, H04N21/43, H04H20/18, H04N21/2343, H04N21/2665, H04N21/44, H04N21/488, H04N21/8543
[2016/27]
CPC:
H04N21/4622 (EP,US); H04H60/13 (EP,US); H04N21/4302 (EP,US);
H04N21/43072 (EP,US); H04N21/44004 (EP,US); H04N21/44012 (EP,US);
H04N21/4888 (EP,US); H04N21/8543 (EP,US); H04H20/18 (EP,US);
H04H2201/40 (EP,US) (-)
Former IPC [2016/22]H04N21/242, H04H60/13, H04N21/435, H04N21/462
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/22]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:SENDEVERFAHREN UND EMPFANGSVERFAHREN SOWIE SENDEVORRICHTUNG UND EMPFANGSVORRICHTUNG[2016/22]
English:TRANSMISSION METHOD AND RECEPTION METHOD, AND TRANSMISSION DEVICE AND RECEPTION DEVICE[2016/22]
French:PROCÉDÉ DE TRANSMISSION ET PROCÉDÉ DE RÉCEPTION, ET DISPOSITIF DE TRANSMISSION ET DISPOSITIF DE RÉCEPTION[2016/22]
Entry into regional phase18.12.2015Translation filed 
18.12.2015National basic fee paid 
18.12.2015Search fee paid 
18.12.2015Designation fee(s) paid 
18.12.2015Examination fee paid 
Examination procedure18.12.2015Examination requested  [2016/22]
09.12.2016Amendment by applicant (claims and/or description)
28.03.2018Despatch of a communication from the examining division (Time limit: M04)
06.08.2018Reply to a communication from the examining division
11.04.2019Date of oral proceedings
06.05.2019Minutes of oral proceedings despatched
13.05.2019Communication of intention to grant the patent
19.09.2019Fee for grant paid
19.09.2019Fee for publishing/printing paid
19.09.2019Receipt of the translation of the claim(s)
Divisional application(s)EP19205604.2  / EP3641318
Opposition(s)31.07.2020No opposition filed within time limit [2020/41]
Fees paidRenewal fee
22.07.2016Renewal fee patent year 03
24.07.2017Renewal fee patent year 04
27.07.2018Renewal fee patent year 05
25.07.2019Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU22.07.2014
AL30.10.2019
AT30.10.2019
CY30.10.2019
CZ30.10.2019
DK30.10.2019
EE30.10.2019
ES30.10.2019
FI30.10.2019
HR30.10.2019
IT30.10.2019
LT30.10.2019
LV30.10.2019
MC30.10.2019
MK30.10.2019
MT30.10.2019
NL30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SE30.10.2019
SI30.10.2019
SK30.10.2019
SM30.10.2019
TR30.10.2019
BG30.01.2020
NO30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
GB22.07.2020
IE22.07.2020
LU22.07.2020
[2022/32]
Former [2022/27]HU22.07.2014
AL30.10.2019
AT30.10.2019
CY30.10.2019
CZ30.10.2019
DK30.10.2019
EE30.10.2019
ES30.10.2019
FI30.10.2019
HR30.10.2019
IT30.10.2019
LT30.10.2019
LV30.10.2019
MC30.10.2019
MT30.10.2019
NL30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SE30.10.2019
SI30.10.2019
SK30.10.2019
SM30.10.2019
TR30.10.2019
BG30.01.2020
NO30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
GB22.07.2020
IE22.07.2020
LU22.07.2020
Former [2021/37]AL30.10.2019
AT30.10.2019
CZ30.10.2019
DK30.10.2019
EE30.10.2019
ES30.10.2019
FI30.10.2019
HR30.10.2019
IT30.10.2019
LT30.10.2019
LV30.10.2019
MC30.10.2019
NL30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SE30.10.2019
SI30.10.2019
SK30.10.2019
SM30.10.2019
BG30.01.2020
NO30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
GB22.07.2020
IE22.07.2020
LU22.07.2020
Former [2021/22]AL30.10.2019
AT30.10.2019
CZ30.10.2019
DK30.10.2019
EE30.10.2019
ES30.10.2019
FI30.10.2019
HR30.10.2019
IT30.10.2019
LT30.10.2019
LV30.10.2019
MC30.10.2019
NL30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SE30.10.2019
SI30.10.2019
SK30.10.2019
SM30.10.2019
BG30.01.2020
NO30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
GB22.07.2020
LU22.07.2020
Former [2021/20]AL30.10.2019
AT30.10.2019
CZ30.10.2019
DK30.10.2019
EE30.10.2019
ES30.10.2019
FI30.10.2019
HR30.10.2019
IT30.10.2019
LT30.10.2019
LV30.10.2019
MC30.10.2019
NL30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SE30.10.2019
SI30.10.2019
SK30.10.2019
SM30.10.2019
BG30.01.2020
NO30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
LU22.07.2020
Former [2021/15]AL30.10.2019
AT30.10.2019
CZ30.10.2019
DK30.10.2019
EE30.10.2019
ES30.10.2019
FI30.10.2019
HR30.10.2019
IT30.10.2019
LT30.10.2019
LV30.10.2019
MC30.10.2019
NL30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SE30.10.2019
SI30.10.2019
SK30.10.2019
SM30.10.2019
BG30.01.2020
NO30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/51]AL30.10.2019
AT30.10.2019
CZ30.10.2019
DK30.10.2019
EE30.10.2019
ES30.10.2019
FI30.10.2019
HR30.10.2019
IT30.10.2019
LT30.10.2019
LV30.10.2019
NL30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SE30.10.2019
SI30.10.2019
SK30.10.2019
SM30.10.2019
BG30.01.2020
NO30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/38]AL30.10.2019
CZ30.10.2019
DK30.10.2019
EE30.10.2019
ES30.10.2019
FI30.10.2019
HR30.10.2019
IT30.10.2019
LT30.10.2019
LV30.10.2019
NL30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SE30.10.2019
SK30.10.2019
SM30.10.2019
BG30.01.2020
NO30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/37]AL30.10.2019
CZ30.10.2019
DK30.10.2019
EE30.10.2019
ES30.10.2019
FI30.10.2019
HR30.10.2019
LT30.10.2019
LV30.10.2019
NL30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SE30.10.2019
SK30.10.2019
SM30.10.2019
BG30.01.2020
NO30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/36]AL30.10.2019
CZ30.10.2019
DK30.10.2019
EE30.10.2019
ES30.10.2019
FI30.10.2019
HR30.10.2019
LT30.10.2019
LV30.10.2019
NL30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SE30.10.2019
BG30.01.2020
NO30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/35]AL30.10.2019
CZ30.10.2019
ES30.10.2019
FI30.10.2019
HR30.10.2019
LT30.10.2019
LV30.10.2019
NL30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SE30.10.2019
BG30.01.2020
NO30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/34]AL30.10.2019
ES30.10.2019
FI30.10.2019
HR30.10.2019
LT30.10.2019
LV30.10.2019
NL30.10.2019
PL30.10.2019
RS30.10.2019
SE30.10.2019
BG30.01.2020
NO30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/32]AL30.10.2019
FI30.10.2019
HR30.10.2019
LT30.10.2019
LV30.10.2019
NL30.10.2019
PL30.10.2019
RS30.10.2019
SE30.10.2019
BG30.01.2020
NO30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/25]FI30.10.2019
HR30.10.2019
LT30.10.2019
LV30.10.2019
NL30.10.2019
PL30.10.2019
RS30.10.2019
SE30.10.2019
BG30.01.2020
NO30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/24]FI30.10.2019
LT30.10.2019
LV30.10.2019
NL30.10.2019
PL30.10.2019
SE30.10.2019
BG30.01.2020
NO30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/23]FI30.10.2019
LT30.10.2019
LV30.10.2019
NL30.10.2019
PL30.10.2019
SE30.10.2019
BG30.01.2020
NO30.01.2020
GR31.01.2020
PT02.03.2020
Former [2020/22]FI30.10.2019
LT30.10.2019
SE30.10.2019
BG30.01.2020
NO30.01.2020
PT02.03.2020
Former [2020/21]NO30.01.2020
Documents cited:Search[A]US2007118850  (BERTIN CHRISTIAN [FR]);
 [A]US2007188656  (CHISAKA MASANOBU [JP]);
 [A]WO2008084947  (SK TELECOM CO LTD [KR], et al);
 [A]EP2498494  (THOMSON LICENSING [FR]);
 [X]WO2013055164  (SAMSUNG ELECTRONICS CO LTD [KR], et al);
 [X]WO2013061525  (PANASONIC CORP [JP]);
 [A]EP2611051  (THOMSON LICENSING [FR]);
 [P]US2014090007  (OKUBO MASAFUMI [JP], et al);
 US2014237536  [ ] (JANG YONG-SEOK [KR], et al)
International search[X]WO2012099359  (SAMSUNG ELECTRONICS CO LTD [KR], et al);
 [A]WO2012099399  (SAMSUNG ELECTRONICS CO LTD [KR], et al)
ExaminationWO2008141341
 EP2178300
 KR20130038792
 US2014245371
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.