blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3235077

EP3235077 - QUANTUM CASCADE LASER OPTIMIZED FOR EPITAXIAL SIDE-DOWN MOUNTING [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  06.08.2021
Database last updated on 07.10.2024
FormerThe patent has been granted
Status updated on  28.08.2020
FormerGrant of patent is intended
Status updated on  20.07.2020
FormerRequest for examination was made
Status updated on  15.07.2020
FormerGrant of patent is intended
Status updated on  16.03.2020
FormerRequest for examination was made
Status updated on  22.09.2017
FormerThe international publication has been made
Status updated on  02.06.2017
Most recent event   Tooltip22.07.2022Lapse of the patent in a contracting state
New state(s): BE
published on 24.08.2022  [2022/34]
Applicant(s)For all designated states
Alpes Lasers S.A.
Avenue des Pâquiers 1
2072 St-Blaise / CH
[2017/43]
Inventor(s)01 / MAULINI, Richard
Route des Couviers 20
CH-2074 Marin-Epagnier (La Tène) / CH
02 / BISMUTO, Alfredo
Rue des Fahys 73
CH-2000 neuchatel / CH
03 / GRESCH, Tobias
Promenade J.-J. Rousseau 12
CH-1400 Yverdon-les-Bains / CH
04 / MÜLLER, Antoine
Rue Champréveyres 2
CH-2000 Neuchatel / CH
 [2017/43]
Representative(s)Klocke, Peter
ABACUS Patentanwälte
Zürichstrasse 34
8134 Adliswil / CH
[2017/43]
Application number, filing date14830569.119.12.2014
[2017/43]
WO2014IB02852
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016097780
Date:23.06.2016
Language:EN
[2016/25]
Type: A1 Application with search report 
No.:EP3235077
Date:25.10.2017
Language:EN
The application published by WIPO in one of the EPO official languages on 23.06.2016 takes the place of the publication of the European patent application.
[2017/43]
Type: B1 Patent specification 
No.:EP3235077
Date:30.09.2020
Language:EN
[2020/40]
Search report(s)International search report - published on:EP23.06.2016
ClassificationIPC:H01S5/022, H01S5/024, H01S5/34, H01S5/22, H01S5/227, H01S5/042
[2020/12]
CPC:
H01S5/3402 (EP,CN,KR,US); H01S5/0234 (EP,CN,KR,US); H01S5/0237 (EP,CN,KR,US);
H01S5/02476 (EP,CN,KR,US); H01S5/026 (US); H01S5/04254 (EP,US);
H01S5/227 (US); H01S5/2272 (EP,CN,KR,US); H01S5/34313 (US);
H01S2301/176 (EP) (-)
Former IPC [2017/43]H01S5/022, H01S5/227, H01S5/22, H01S5/34, H01S5/024
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/43]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:QUANTENKASKADENLASER, DER FÜR DIE MONTAGE MIT DER EPITAXIESEITE NACH UNTEN OPTIMIERT IST.[2020/12]
English:QUANTUM CASCADE LASER OPTIMIZED FOR EPITAXIAL SIDE-DOWN MOUNTING[2017/43]
French:LASER À CASCADE QUANTIQUE OPTIMISÉ POUR UN MONTAGE TÊTE-BÊCHE SUR L'EMBASE[2017/43]
Former [2017/43]ZUR EPITAKTISCHEN SIDE-DOWN-MONTAGE OPTIMIERTER QUANTENKASKADENLASER
Entry into regional phase19.07.2017National basic fee paid 
19.07.2017Designation fee(s) paid 
19.07.2017Examination fee paid 
Examination procedure02.06.2017Date on which the examining division has become responsible
19.07.2017Examination requested  [2017/43]
17.03.2020Communication of intention to grant the patent
15.07.2020Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
15.07.2020Fee for grant paid
15.07.2020Fee for publishing/printing paid
15.07.2020Receipt of the translation of the claim(s)
Opposition(s)01.07.2021No opposition filed within time limit [2021/36]
Fees paidRenewal fee
19.07.2017Renewal fee patent year 03
20.11.2017Renewal fee patent year 04
30.09.2018Renewal fee patent year 05
01.10.2019Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.12.2014
AL30.09.2020
AT30.09.2020
CY30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
MK30.09.2020
MT30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
TR30.09.2020
IE19.12.2020
LU19.12.2020
BG30.12.2020
NO30.12.2020
BE31.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
[2022/34]
Former [2022/32]HU19.12.2014
AL30.09.2020
AT30.09.2020
CY30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
MK30.09.2020
MT30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
TR30.09.2020
IE19.12.2020
LU19.12.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2022/27]HU19.12.2014
AL30.09.2020
AT30.09.2020
CY30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
MT30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
TR30.09.2020
IE19.12.2020
LU19.12.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2022/23]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
IE19.12.2020
LU19.12.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2022/10]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
IE19.12.2020
LU19.12.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
PT01.02.2021
Former [2021/50]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
IE19.12.2020
LU19.12.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/48]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SK30.09.2020
SM30.09.2020
IE19.12.2020
LU19.12.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/47]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SK30.09.2020
SM30.09.2020
IE19.12.2020
LU19.12.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/46]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SK30.09.2020
SM30.09.2020
IE19.12.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/40]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/37]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/28]AL30.09.2020
AT30.09.2020
CZ30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/25]AL30.09.2020
AT30.09.2020
CZ30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/23]AT30.09.2020
CZ30.09.2020
EE30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
PT01.02.2021
Former [2021/22]CZ30.09.2020
EE30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
PT01.02.2021
Former [2021/21]FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
RS30.09.2020
SE30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
PT01.02.2021
Former [2021/20]FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
RS30.09.2020
SE30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
Former [2021/10]FI30.09.2020
HR30.09.2020
LV30.09.2020
RS30.09.2020
SE30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
Former [2021/08]FI30.09.2020
SE30.09.2020
BG30.12.2020
NO30.12.2020
Former [2021/07]FI30.09.2020
NO30.12.2020
Cited inInternational search[Y]JPH0567847  (MATSUSHITA ELECTRIC IND CO LTD) [Y] 1-10 * abstract *;
 [Y]US5198686  (YOSHIMURA KIMITAKA [JP]) [Y] 1-10 * column 2, line 62 - column 3, line 31; figure 1 *;
 [Y]JP2004140141  (MITSUBISHI ELECTRIC CORP) [Y] 1-10 * abstract * * figures 1,2 *;
 [Y]US2008075133  (DAY TIMOTHY [US], et al) [Y] 1-10 * paragraph [0015] - paragraph [0016] * * paragraph [0045] - paragraph [0050]; figures 1,3 * * paragraph [0057]; figure 8 *;
 [Y]US2011249694  (NISHIGUCHI HARUMI [JP], et al) [Y] 1-10 * paragraph [0039] - paragraph [0042]; figure 3 *;
 [A]  - GMACHL C ET AL, "Improved CW operation of quantum cascade lasers with epitaxial-side heat-sinking", IEEE PHOTONICS TECHNOLOGY LETTERS, IEEE SERVICE CENTER, PISCATAWAY, NJ, US, (19991101), vol. 11, no. 11, doi:10.1109/68.803048, ISSN 1041-1135, pages 1369 - 1371, XP011431821 [A] 1-10 * page 1369 - column r; figure 3 *

DOI:   http://dx.doi.org/10.1109/68.803048
 [A]  - A. TSEKOUN ET AL, "Improved performance of quantum cascade lasers through a scalable, manufacturable epitaxial-side-down mounting process", PROCEEDINGS OF THE NATIONAL ACADEMY OF SCIENCES, (20060328), vol. 103, no. 13, doi:10.1073/pnas.0600859103, ISSN 0027-8424, pages 4831 - 4835, XP055215738 [A] 1-10 * page 4833, column l *

DOI:   http://dx.doi.org/10.1073/pnas.0600859103
by applicantUS2013243020
    - J. S. YU ET AL., "High-power A-9.5 pm quantum-cascade lasers operating above room temperature in continuous-wave mode", APPLIED PHYSICS LETTERS, (2006), vol. 88, page 091113
 EP20130405109
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.