EP3035844 - CIRCUIT FOR ELECTROCORTICOGRAPHY SIGNAL ACQUISITION [Right-click to bookmark this link] | |||
Former [2016/26] | SYSTEMS AND METHODS FOR ELECTROCORTICOGRAPHY SIGNAL ACQUISITION | ||
[2020/09] | Status | No opposition filed within time limit Status updated on 21.05.2021 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 12.06.2020 | ||
Former | Grant of patent is intended Status updated on 11.02.2020 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states The Regents of the University of California 1111 Franklin Street, 12th Floor Oakland, CA 94607 / US | [2016/26] | Inventor(s) | 01 /
MULLER, Rikky 9904 NE 124th Street Unit 1001 Kirkland, Washington 98034 / US | [2016/26] | Representative(s) | Farrington, Graham, et al Ladas & Parry London Limited Temple Chambers 3-7 Temple Avenue London EC4Y 0DA / GB | [2016/26] | Application number, filing date | 14837296.4 | 20.08.2014 | [2016/26] | WO2014US51959 | Priority number, date | US201361867899P | 20.08.2013 Original published format: US 201361867899 P | [2016/26] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015026988 | Date: | 26.02.2015 | Language: | EN | [2015/08] | Type: | A1 Application with search report | No.: | EP3035844 | Date: | 29.06.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 26.02.2015 takes the place of the publication of the European patent application. | [2016/26] | Type: | B1 Patent specification | No.: | EP3035844 | Date: | 15.07.2020 | Language: | EN | [2020/29] | Search report(s) | International search report - published on: | KR | 26.02.2015 | (Supplementary) European search report - dispatched on: | EP | 17.03.2017 | Classification | IPC: | A61B5/0476, A61B5/0478 | [2016/26] | CPC: |
A61B5/7203 (EP,US);
A61B5/0006 (US);
A61B5/30 (US);
A61B5/316 (EP,US);
A61B5/369 (EP,US);
A61B5/7228 (US);
A61N1/3704 (US);
H04L27/06 (US);
A61B5/291 (EP,US);
A61B5/374 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/26] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SCHALTKREIS ZUR ELEKTROKORTIKOGRAFISCHEN SIGNALERFASSUNG | [2020/09] | English: | CIRCUIT FOR ELECTROCORTICOGRAPHY SIGNAL ACQUISITION | [2020/09] | French: | CIRCUIT D'ACQUISITION DE SIGNAUX D'ÉLECTROCORTICOGRAPHIE | [2020/09] |
Former [2016/26] | SYSTEME UND VERFAHREN ZUR ELEKTROKORTIKOGRAFISCHEN SIGNALERFASSUNG | ||
Former [2016/26] | SYSTEMS AND METHODS FOR ELECTROCORTICOGRAPHY SIGNAL ACQUISITION | ||
Former [2016/26] | SYSTÈMES ET PROCÉDÉS D'ACQUISITION DE SIGNAUX D'ÉLECTROCORTICOGRAPHIE | Entry into regional phase | 04.03.2016 | National basic fee paid | 04.03.2016 | Search fee paid | 04.03.2016 | Designation fee(s) paid | 04.03.2016 | Examination fee paid | Examination procedure | 04.03.2016 | Examination requested [2016/26] | 27.09.2017 | Amendment by applicant (claims and/or description) | 12.02.2020 | Communication of intention to grant the patent | 03.06.2020 | Fee for grant paid | 03.06.2020 | Fee for publishing/printing paid | 09.06.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 16.04.2021 | No opposition filed within time limit [2021/25] | Fees paid | Renewal fee | 29.08.2016 | Renewal fee patent year 03 | 28.08.2017 | Renewal fee patent year 04 | 27.08.2018 | Renewal fee patent year 05 | 27.08.2019 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.08.2014 | AL | 15.07.2020 | AT | 15.07.2020 | CY | 15.07.2020 | CZ | 15.07.2020 | DK | 15.07.2020 | EE | 15.07.2020 | ES | 15.07.2020 | FI | 15.07.2020 | HR | 15.07.2020 | IT | 15.07.2020 | LT | 15.07.2020 | LV | 15.07.2020 | MC | 15.07.2020 | MK | 15.07.2020 | MT | 15.07.2020 | NL | 15.07.2020 | PL | 15.07.2020 | RO | 15.07.2020 | RS | 15.07.2020 | SE | 15.07.2020 | SI | 15.07.2020 | SK | 15.07.2020 | SM | 15.07.2020 | TR | 15.07.2020 | IE | 20.08.2020 | LU | 20.08.2020 | BE | 31.08.2020 | CH | 31.08.2020 | LI | 31.08.2020 | BG | 15.10.2020 | NO | 15.10.2020 | GR | 16.10.2020 | IS | 15.11.2020 | PT | 16.11.2020 | [2022/32] |
Former [2022/27] | HU | 20.08.2014 | |
AL | 15.07.2020 | ||
AT | 15.07.2020 | ||
CY | 15.07.2020 | ||
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
ES | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
IT | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
MC | 15.07.2020 | ||
MT | 15.07.2020 | ||
NL | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SI | 15.07.2020 | ||
SK | 15.07.2020 | ||
SM | 15.07.2020 | ||
TR | 15.07.2020 | ||
IE | 20.08.2020 | ||
LU | 20.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/37] | AL | 15.07.2020 | |
AT | 15.07.2020 | ||
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
ES | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
IT | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
MC | 15.07.2020 | ||
NL | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SI | 15.07.2020 | ||
SK | 15.07.2020 | ||
SM | 15.07.2020 | ||
IE | 20.08.2020 | ||
LU | 20.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/36] | AL | 15.07.2020 | |
AT | 15.07.2020 | ||
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
ES | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
IT | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
MC | 15.07.2020 | ||
NL | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SI | 15.07.2020 | ||
SK | 15.07.2020 | ||
SM | 15.07.2020 | ||
LU | 20.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/28] | AL | 15.07.2020 | |
AT | 15.07.2020 | ||
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
ES | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
IT | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
MC | 15.07.2020 | ||
NL | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SK | 15.07.2020 | ||
SM | 15.07.2020 | ||
LU | 20.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/25] | AL | 15.07.2020 | |
AT | 15.07.2020 | ||
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
ES | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
IT | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
MC | 15.07.2020 | ||
NL | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SM | 15.07.2020 | ||
LU | 20.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/23] | AT | 15.07.2020 | |
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
ES | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
IT | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
MC | 15.07.2020 | ||
NL | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SM | 15.07.2020 | ||
LU | 20.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/22] | AT | 15.07.2020 | |
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
ES | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
IT | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
NL | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SM | 15.07.2020 | ||
LU | 20.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/20] | AT | 15.07.2020 | |
DK | 15.07.2020 | ||
ES | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
IT | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
NL | 15.07.2020 | ||
PL | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
LU | 20.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/17] | AT | 15.07.2020 | |
ES | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
NL | 15.07.2020 | ||
PL | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/10] | AT | 15.07.2020 | |
ES | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
PL | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/09] | AT | 15.07.2020 | |
ES | 15.07.2020 | ||
FI | 15.07.2020 | ||
LT | 15.07.2020 | ||
SE | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
PT | 16.11.2020 | ||
Former [2021/08] | ES | 15.07.2020 | |
FI | 15.07.2020 | ||
LT | 15.07.2020 | ||
SE | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
PT | 16.11.2020 | ||
Former [2021/07] | FI | 15.07.2020 | |
LT | 15.07.2020 | ||
NO | 15.10.2020 | Documents cited: | Search | [A]US2009072873 (DENIER URS [CH]) [A] 1-13 * paragraph [0007] - paragraph [0030] ** figures 1-8 *; | [Y]US2009079607 (DENISON TIMOTHY J [US], et al) [Y] 1-13 * the whole document *; | [Y] - MARTENS O ET AL, "High-performance analogue measurement using internal enhanced PWM and ADC of a DSP-chip", 2007 IEEE INTERNATIONAL SYMPOSIUM ON INTELLIGENT SIGNAL PROCESSING IEEE PISCATAWAY, NJ, USA, (2007), ISBN 978-1-4244-0829-0, pages 598 - 602, XP002767915 [Y] 1-13 * the whole document * | International search | [Y]US2008284490 (TENBROEK BERNARD [GB]); | [A]KR20090029854 (MOTOROLA INC [US]); | [X]US2009079607 (DENISON TIMOTHY J [US], et al); | [Y]US2011193731 (DANIELS JORG [BE], et al); | [A]US2012194369 (GALTON IAN [US], et al) |