| EP3052015 - DETACHABLE ELECTROCARDIOGRAPHY DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.01.2023 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 04.02.2022 | ||
| Former | Grant of patent is intended Status updated on 07.10.2021 | ||
| Former | Examination is in progress Status updated on 02.07.2021 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states LifeWatch Technologies Ltd. 2 Pekeris Street 76100 Rehovot / IL | [2016/32] | Inventor(s) | 01 /
GEVA, Yacov 68 North Row Street London 44418 / GB | 02 /
GEVA, Nir 6 Yoash Street 7405085 Nes Ziona / IL | 03 /
LOVTON, Yossi 2A Yoash Street 7405081 Nes Ziona / IL | 04 /
TAL, Benny 38 Hanasi Steet 7837420 Ashkelon / IL | [2016/32] | Representative(s) | Philips Intellectual Property & Standards High Tech Campus 52 5656 AG Eindhoven / NL | [2022/10] |
| Former [2016/32] | Graf von Stosch, Andreas, et al Graf von Stosch Patentanwaltsgesellschaft mbH Prinzregentenstraße 22 80538 München / DE | Application number, filing date | 14848984.2 | 29.09.2014 | [2016/32] | WO2014IL50853 | Priority number, date | US201314040750 | 30.09.2013 Original published format: US201314040750 | [2016/32] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015044946 | Date: | 02.04.2015 | Language: | EN | [2015/13] | Type: | A1 Application with search report | No.: | EP3052015 | Date: | 10.08.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 02.04.2015 takes the place of the publication of the European patent application. | [2016/32] | Type: | B1 Patent specification | No.: | EP3052015 | Date: | 09.03.2022 | Language: | EN | [2022/10] | Search report(s) | International search report - published on: | IL | 02.04.2015 | (Supplementary) European search report - dispatched on: | EP | 19.04.2017 | Classification | IPC: | A61B5/282, A61B5/30 | [2021/39] | CPC: |
A61B5/282 (EP,US);
A61B5/0006 (US);
A61B5/303 (EP);
A61B5/308 (US);
A61B5/33 (US);
A61B5/6823 (US);
A61B2560/0443 (EP,US);
A61B2560/0468 (EP,US);
A61B2562/164 (US);
|
| Former IPC [2017/20] | A61B5/0408, A61B5/0428, A61B5/04, A61B5/00, A61B5/0416 | ||
| Former IPC [2016/32] | A61B5/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/32] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ABNEHMBARE ELEKTROKARDIOGRAFIEVORRICHTUNG | [2016/32] | English: | DETACHABLE ELECTROCARDIOGRAPHY DEVICE | [2016/32] | French: | DISPOSITIF D'ÉLECTROCARDIOGRAPHIE SÉPARABLE | [2016/32] | Entry into regional phase | 24.02.2016 | National basic fee paid | 24.02.2016 | Search fee paid | 24.02.2016 | Designation fee(s) paid | 24.02.2016 | Examination fee paid | Examination procedure | 24.02.2016 | Examination requested [2016/32] | 13.11.2017 | Amendment by applicant (claims and/or description) | 01.07.2021 | Despatch of a communication from the examining division (Time limit: M02) | 20.07.2021 | Reply to a communication from the examining division | 08.10.2021 | Communication of intention to grant the patent | 29.01.2022 | Receipt of the translation of the claim(s) | 31.01.2022 | Fee for grant paid | 31.01.2022 | Fee for publishing/printing paid | Opposition(s) | 12.12.2022 | No opposition filed within time limit [2023/07] | Fees paid | Renewal fee | 17.08.2016 | Renewal fee patent year 03 | 19.09.2017 | Renewal fee patent year 04 | 27.09.2018 | Renewal fee patent year 05 | 27.09.2019 | Renewal fee patent year 06 | 28.09.2020 | Renewal fee patent year 07 | 27.09.2021 | Renewal fee patent year 08 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.09.2014 | AL | 09.03.2022 | AT | 09.03.2022 | CY | 09.03.2022 | CZ | 09.03.2022 | DK | 09.03.2022 | EE | 09.03.2022 | ES | 09.03.2022 | FI | 09.03.2022 | HR | 09.03.2022 | IT | 09.03.2022 | LT | 09.03.2022 | LV | 09.03.2022 | MC | 09.03.2022 | MK | 09.03.2022 | MT | 09.03.2022 | NL | 09.03.2022 | PL | 09.03.2022 | RO | 09.03.2022 | RS | 09.03.2022 | SE | 09.03.2022 | SI | 09.03.2022 | SK | 09.03.2022 | SM | 09.03.2022 | TR | 09.03.2022 | BG | 09.06.2022 | NO | 09.06.2022 | GR | 10.06.2022 | IS | 09.07.2022 | PT | 11.07.2022 | GB | 29.09.2022 | IE | 29.09.2022 | LU | 29.09.2022 | BE | 30.09.2022 | CH | 30.09.2022 | FR | 30.09.2022 | LI | 30.09.2022 | [2024/41] |
| Former [2024/29] | HU | 29.09.2014 | |
| AL | 09.03.2022 | ||
| AT | 09.03.2022 | ||
| CY | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| IT | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| MK | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| TR | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| GB | 29.09.2022 | ||
| IE | 29.09.2022 | ||
| LU | 29.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| FR | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| Former [2024/27] | HU | 29.09.2014 | |
| AL | 09.03.2022 | ||
| AT | 09.03.2022 | ||
| CY | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| IT | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| MK | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| GB | 29.09.2022 | ||
| IE | 29.09.2022 | ||
| LU | 29.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| FR | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| Former [2024/21] | HU | 29.09.2014 | |
| AL | 09.03.2022 | ||
| AT | 09.03.2022 | ||
| CY | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| IT | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| GB | 29.09.2022 | ||
| IE | 29.09.2022 | ||
| LU | 29.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| FR | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| Former [2024/18] | HU | 29.09.2014 | |
| AL | 09.03.2022 | ||
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| IT | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| GB | 29.09.2022 | ||
| IE | 29.09.2022 | ||
| LU | 29.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| FR | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| Former [2023/47] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| IT | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| GB | 29.09.2022 | ||
| IE | 29.09.2022 | ||
| LU | 29.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| FR | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| Former [2023/42] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| IT | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| IE | 29.09.2022 | ||
| LU | 29.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| FR | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| Former [2023/35] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| IT | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| IE | 29.09.2022 | ||
| LU | 29.09.2022 | ||
| CH | 30.09.2022 | ||
| FR | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| Former [2023/33] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| IE | 29.09.2022 | ||
| LU | 29.09.2022 | ||
| Former [2023/30] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| LU | 29.09.2022 | ||
| Former [2023/22] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2023/10] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2023/07] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2023/01] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2022/51] | AT | 09.03.2022 | |
| CZ | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2022/50] | AT | 09.03.2022 | |
| CZ | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| PT | 11.07.2022 | ||
| Former [2022/49] | AT | 09.03.2022 | |
| CZ | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| PT | 11.07.2022 | ||
| Former [2022/48] | AT | 09.03.2022 | |
| CZ | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| PT | 11.07.2022 | ||
| Former [2022/47] | AT | 09.03.2022 | |
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| PT | 11.07.2022 | ||
| Former [2022/44] | FI | 09.03.2022 | |
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| Former [2022/39] | FI | 09.03.2022 | |
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| Former [2022/36] | HR | 09.03.2022 | |
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| Former [2022/35] | HR | 09.03.2022 | |
| LT | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| Former [2022/33] | LT | 09.03.2022 | |
| NO | 09.06.2022 | Documents cited: | Search | [XAI] US2004077954 (OAKLEY NIGEL R et al.) [X] 1,4,5,7 * paragraphs [0008] , [0 13] , [0 19] , [0 32] - [0033] - [0 44] * * figure 2 *[A] 8-13,15 [I] 2,3,6,14 | [A] US2002161308 (MATSUMURA FUMIYUKI et al.) [A] 1-15 * the whole document * | [A] US2007015973 (NANIKASHVILI REUVEN et al.) [A] 1-15 * the whole document * | [A] US2012022387 (BALDA DANIEL et al.) [A] 1-15 * the whole document * | [A] US2008312524 (SOLOSKO THOMAS et al.) [A] 1-15 * the whole document * | [A] US6605046 (DEL MAR BRUCE E et al.) [A] 1-15 * the whole document * | International search | [A] US2012197144 (CHRIST JOHANNES et al.) [A] | [A] US6117077 (DEL MAR BRUCE EUGENE et al.) [A] | [A] US2005143669 (MATSUMURA FUMIYUKI et al.) [A] | [A] US2004176674 (NAZERI ALIREZA et al.) [A] | by applicant | US2004077954 | US2002161308 | US2007015973 | SEEBERGER M.D. ET AL.: "The Inverse Nehb J lead increases the sensitivity of Holter Electrocardiographic monitoring for detecting myocardial ischemia", AM.J.CARDIOL, vol. 80, 1997, pages 1 - 5 | OSTERHUES, H.-H. ET AL.: "Improved detection of transient myocardial ischemia by a new lead combination: value of bipolar lead Nehb D for Holter- monitoring", AM. HEART J., vol. 127, 1994, pages 559 - 566, XP022949111, DOI: 10.1016/0002-8703(94)90663-7 DOI: http://dx.doi.org/10.1016/0002-8703(94)90663-7 |