| EP3070125 - POLYCARBONATE RESIN MOLDING MATERIAL [Right-click to bookmark this link] | Status | Patent revoked Status updated on 29.06.2024 Database last updated on 10.03.2026 | |
| Former | The patent has been granted Status updated on 01.06.2018 | ||
| Former | Grant of patent is intended Status updated on 20.02.2018 | Most recent event Tooltip | 05.07.2024 | Revocation of patent | published on 07.08.2024 [2024/32] | Applicant(s) | For all designated states Idemitsu Kosan Co., Ltd. 1-1, Marunouchi 3-chome Chiyoda-ku Tokyo 100-8321 / JP | [2016/38] | Inventor(s) | 01 /
TAKIMOTO, Masami 1-1 Anesakikaigan Ichihara-shi Chiba 299-0193 / JP | 02 /
TORII, Takahiro 1-1 Anesakikaigan Ichihara-shi Chiba 299-0193 / JP | 03 /
NAKAE, Mitsugu 1-1 Anesakikaigan Ichihara-shi Chiba 299-0193 / JP | [2016/38] | Representative(s) | Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | [2016/38] | Application number, filing date | 14859994.7 | 10.11.2014 | [2016/38] | WO2014JP79765 | Priority number, date | JP20130233430 | 11.11.2013 Original published format: JP 2013233430 | [2016/38] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015068845 | Date: | 14.05.2015 | Language: | JA | [2015/19] | Type: | A1 Application with search report | No.: | EP3070125 | Date: | 21.09.2016 | Language: | EN | [2016/38] | Type: | B1 Patent specification | No.: | EP3070125 | Date: | 04.07.2018 | Language: | EN | [2018/27] | Search report(s) | International search report - published on: | JP | 14.05.2015 | (Supplementary) European search report - dispatched on: | EP | 30.05.2017 | Classification | IPC: | C08L69/00, C08K5/42, C08K5/55, C08L71/02 | [2016/38] | CPC: |
C08K3/38 (EP,US);
C08L69/00 (EP,KR,US);
C08G64/06 (US);
C08K5/42 (EP,KR,US);
C08K5/55 (KR,US);
C08L71/02 (EP,KR,US);
G02B6/0001 (KR);
G02B6/0065 (US);
B29C45/0001 (US);
| C-Set: |
C08K3/38, C08L69/00 (EP,US);
C08K5/42, C08L69/00 (US,EP);
C08L69/00, C08K3/38, C08L71/02 (US,EP);
C08L69/00, C08K5/42, C08L71/02 (US,EP) | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/38] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | POLYCARBONATHARZ-FORMMASSE | [2016/38] | English: | POLYCARBONATE RESIN MOLDING MATERIAL | [2016/38] | French: | MATIÈRE À MOULER À BASE DE RÉSINE POLYCARBONATE | [2016/38] | Entry into regional phase | 02.05.2016 | Translation filed | 02.05.2016 | National basic fee paid | 02.05.2016 | Search fee paid | 02.05.2016 | Designation fee(s) paid | 02.05.2016 | Examination fee paid | Examination procedure | 02.05.2016 | Examination requested [2016/38] | 22.12.2017 | Amendment by applicant (claims and/or description) | 21.02.2018 | Communication of intention to grant the patent | 23.05.2018 | Fee for grant paid | 23.05.2018 | Fee for publishing/printing paid | 23.05.2018 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
29.03.2019
05.04.2019
ADMISSIBLE SABIC Global Technologies B.V. Plasticslaan 1 4612 PX Bergen op Zoom / NL Opponent's representative Sabic Intellectual Property Group Sabic Intellectual Property Department P.O. Box 3008 6160 GA Geleen / NL | [2022/43] |
| Former [2019/19] | |||
| Opponent(s) | 01
29.03.2019
ADMISSIBLE SABIC Global Technologies B.V. Plasticslaan 1 4612 PX Bergen op Zoom / NL Opponent's representative Terpsma, Jelle Philip SABIC Intellectual Property Group P.O. Box 3008 6160 GA Geleen / NL | 23.04.2019 | Invitation to proprietor to file observations on the notice of opposition | 02.09.2019 | Reply of patent proprietor to notice(s) of opposition | 29.07.2020 | Cancellation of oral proceeding that was planned for 22.09.2020 | 22.09.2020 | Date of oral proceedings | 16.03.2021 | Date of oral proceedings | 03.08.2021 | Despatch of interlocutory decision in opposition | 03.08.2021 | Despatch of minutes of oral proceedings | 27.03.2024 | Legal effect of revocation of patent [2024/32] | 27.06.2024 | Despatch of communication that the patent will be revoked | Appeal following opposition | 01.10.2021 | Appeal received No. T1766/21 | 01.10.2021 | Payment of appeal fee | 02.12.2021 | Statement of grounds filed | 27.03.2024 | Result of appeal procedure: revocation of the patent | 27.06.2024 | Despatch of the decision of the Board of Appeal | 27.03.2024 | Date of oral proceedings | Fees paid | Renewal fee | 23.11.2016 | Renewal fee patent year 03 | 24.11.2017 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.11.2014 | AL | 04.07.2018 | AT | 04.07.2018 | CY | 04.07.2018 | CZ | 04.07.2018 | DK | 04.07.2018 | EE | 04.07.2018 | ES | 04.07.2018 | FI | 04.07.2018 | HR | 04.07.2018 | IT | 04.07.2018 | LT | 04.07.2018 | LV | 04.07.2018 | MC | 04.07.2018 | MK | 04.07.2018 | NL | 04.07.2018 | PL | 04.07.2018 | PT | 04.07.2018 | RO | 04.07.2018 | RS | 04.07.2018 | SE | 04.07.2018 | SI | 04.07.2018 | SK | 04.07.2018 | SM | 04.07.2018 | TR | 04.07.2018 | BG | 04.10.2018 | NO | 04.10.2018 | GR | 05.10.2018 | IS | 04.11.2018 | GB | 10.11.2018 | IE | 10.11.2018 | LU | 10.11.2018 | MT | 10.11.2018 | BE | 30.11.2018 | CH | 30.11.2018 | FR | 30.11.2018 | LI | 30.11.2018 | [2020/31] |
| Former [2020/28] | AL | 04.07.2018 | |
| AT | 04.07.2018 | ||
| CZ | 04.07.2018 | ||
| DK | 04.07.2018 | ||
| EE | 04.07.2018 | ||
| ES | 04.07.2018 | ||
| FI | 04.07.2018 | ||
| HR | 04.07.2018 | ||
| IT | 04.07.2018 | ||
| LT | 04.07.2018 | ||
| LV | 04.07.2018 | ||
| MC | 04.07.2018 | ||
| NL | 04.07.2018 | ||
| PL | 04.07.2018 | ||
| PT | 04.07.2018 | ||
| RO | 04.07.2018 | ||
| RS | 04.07.2018 | ||
| SE | 04.07.2018 | ||
| SI | 04.07.2018 | ||
| SK | 04.07.2018 | ||
| SM | 04.07.2018 | ||
| TR | 04.07.2018 | ||
| BG | 04.10.2018 | ||
| NO | 04.10.2018 | ||
| GR | 05.10.2018 | ||
| IS | 04.11.2018 | ||
| GB | 10.11.2018 | ||
| IE | 10.11.2018 | ||
| LU | 10.11.2018 | ||
| MT | 10.11.2018 | ||
| BE | 30.11.2018 | ||
| CH | 30.11.2018 | ||
| FR | 30.11.2018 | ||
| LI | 30.11.2018 | ||
| Former [2020/16] | AL | 04.07.2018 | |
| AT | 04.07.2018 | ||
| CZ | 04.07.2018 | ||
| DK | 04.07.2018 | ||
| EE | 04.07.2018 | ||
| ES | 04.07.2018 | ||
| FI | 04.07.2018 | ||
| HR | 04.07.2018 | ||
| IT | 04.07.2018 | ||
| LT | 04.07.2018 | ||
| LV | 04.07.2018 | ||
| MC | 04.07.2018 | ||
| NL | 04.07.2018 | ||
| PL | 04.07.2018 | ||
| RO | 04.07.2018 | ||
| RS | 04.07.2018 | ||
| SE | 04.07.2018 | ||
| SI | 04.07.2018 | ||
| SK | 04.07.2018 | ||
| SM | 04.07.2018 | ||
| TR | 04.07.2018 | ||
| BG | 04.10.2018 | ||
| NO | 04.10.2018 | ||
| GR | 05.10.2018 | ||
| IS | 04.11.2018 | ||
| GB | 10.11.2018 | ||
| IE | 10.11.2018 | ||
| LU | 10.11.2018 | ||
| MT | 10.11.2018 | ||
| BE | 30.11.2018 | ||
| CH | 30.11.2018 | ||
| FR | 30.11.2018 | ||
| LI | 30.11.2018 | ||
| Former [2020/08] | AL | 04.07.2018 | |
| AT | 04.07.2018 | ||
| CZ | 04.07.2018 | ||
| DK | 04.07.2018 | ||
| EE | 04.07.2018 | ||
| ES | 04.07.2018 | ||
| FI | 04.07.2018 | ||
| HR | 04.07.2018 | ||
| IT | 04.07.2018 | ||
| LT | 04.07.2018 | ||
| LV | 04.07.2018 | ||
| MC | 04.07.2018 | ||
| NL | 04.07.2018 | ||
| PL | 04.07.2018 | ||
| RO | 04.07.2018 | ||
| RS | 04.07.2018 | ||
| SE | 04.07.2018 | ||
| SI | 04.07.2018 | ||
| SK | 04.07.2018 | ||
| SM | 04.07.2018 | ||
| BG | 04.10.2018 | ||
| NO | 04.10.2018 | ||
| GR | 05.10.2018 | ||
| IS | 04.11.2018 | ||
| GB | 10.11.2018 | ||
| IE | 10.11.2018 | ||
| LU | 10.11.2018 | ||
| MT | 10.11.2018 | ||
| BE | 30.11.2018 | ||
| CH | 30.11.2018 | ||
| FR | 30.11.2018 | ||
| LI | 30.11.2018 | ||
| Former [2020/03] | AL | 04.07.2018 | |
| AT | 04.07.2018 | ||
| CZ | 04.07.2018 | ||
| DK | 04.07.2018 | ||
| EE | 04.07.2018 | ||
| ES | 04.07.2018 | ||
| FI | 04.07.2018 | ||
| HR | 04.07.2018 | ||
| IT | 04.07.2018 | ||
| LT | 04.07.2018 | ||
| LV | 04.07.2018 | ||
| MC | 04.07.2018 | ||
| NL | 04.07.2018 | ||
| PL | 04.07.2018 | ||
| RO | 04.07.2018 | ||
| RS | 04.07.2018 | ||
| SE | 04.07.2018 | ||
| SI | 04.07.2018 | ||
| SK | 04.07.2018 | ||
| SM | 04.07.2018 | ||
| BG | 04.10.2018 | ||
| NO | 04.10.2018 | ||
| GR | 05.10.2018 | ||
| IS | 04.11.2018 | ||
| GB | 10.11.2018 | ||
| IE | 10.11.2018 | ||
| LU | 10.11.2018 | ||
| BE | 30.11.2018 | ||
| CH | 30.11.2018 | ||
| FR | 30.11.2018 | ||
| LI | 30.11.2018 | ||
| Former [2019/51] | AL | 04.07.2018 | |
| AT | 04.07.2018 | ||
| CZ | 04.07.2018 | ||
| DK | 04.07.2018 | ||
| EE | 04.07.2018 | ||
| ES | 04.07.2018 | ||
| FI | 04.07.2018 | ||
| HR | 04.07.2018 | ||
| IT | 04.07.2018 | ||
| LT | 04.07.2018 | ||
| LV | 04.07.2018 | ||
| MC | 04.07.2018 | ||
| NL | 04.07.2018 | ||
| PL | 04.07.2018 | ||
| RO | 04.07.2018 | ||
| RS | 04.07.2018 | ||
| SE | 04.07.2018 | ||
| SI | 04.07.2018 | ||
| SK | 04.07.2018 | ||
| SM | 04.07.2018 | ||
| BG | 04.10.2018 | ||
| NO | 04.10.2018 | ||
| GR | 05.10.2018 | ||
| IS | 04.11.2018 | ||
| IE | 10.11.2018 | ||
| LU | 10.11.2018 | ||
| BE | 30.11.2018 | ||
| CH | 30.11.2018 | ||
| FR | 30.11.2018 | ||
| LI | 30.11.2018 | ||
| Former [2019/49] | AL | 04.07.2018 | |
| AT | 04.07.2018 | ||
| CZ | 04.07.2018 | ||
| DK | 04.07.2018 | ||
| EE | 04.07.2018 | ||
| ES | 04.07.2018 | ||
| FI | 04.07.2018 | ||
| HR | 04.07.2018 | ||
| IT | 04.07.2018 | ||
| LT | 04.07.2018 | ||
| LV | 04.07.2018 | ||
| MC | 04.07.2018 | ||
| NL | 04.07.2018 | ||
| PL | 04.07.2018 | ||
| RO | 04.07.2018 | ||
| RS | 04.07.2018 | ||
| SE | 04.07.2018 | ||
| SI | 04.07.2018 | ||
| SK | 04.07.2018 | ||
| SM | 04.07.2018 | ||
| BG | 04.10.2018 | ||
| NO | 04.10.2018 | ||
| GR | 05.10.2018 | ||
| IS | 04.11.2018 | ||
| IE | 10.11.2018 | ||
| LU | 10.11.2018 | ||
| CH | 30.11.2018 | ||
| FR | 30.11.2018 | ||
| LI | 30.11.2018 | ||
| Former [2019/48] | AL | 04.07.2018 | |
| AT | 04.07.2018 | ||
| CZ | 04.07.2018 | ||
| DK | 04.07.2018 | ||
| EE | 04.07.2018 | ||
| ES | 04.07.2018 | ||
| FI | 04.07.2018 | ||
| HR | 04.07.2018 | ||
| IT | 04.07.2018 | ||
| LT | 04.07.2018 | ||
| LV | 04.07.2018 | ||
| MC | 04.07.2018 | ||
| NL | 04.07.2018 | ||
| PL | 04.07.2018 | ||
| RO | 04.07.2018 | ||
| RS | 04.07.2018 | ||
| SE | 04.07.2018 | ||
| SI | 04.07.2018 | ||
| SK | 04.07.2018 | ||
| SM | 04.07.2018 | ||
| BG | 04.10.2018 | ||
| NO | 04.10.2018 | ||
| GR | 05.10.2018 | ||
| IS | 04.11.2018 | ||
| IE | 10.11.2018 | ||
| LU | 10.11.2018 | ||
| CH | 30.11.2018 | ||
| LI | 30.11.2018 | ||
| Former [2019/40] | AL | 04.07.2018 | |
| AT | 04.07.2018 | ||
| CZ | 04.07.2018 | ||
| DK | 04.07.2018 | ||
| EE | 04.07.2018 | ||
| ES | 04.07.2018 | ||
| FI | 04.07.2018 | ||
| HR | 04.07.2018 | ||
| IT | 04.07.2018 | ||
| LT | 04.07.2018 | ||
| LV | 04.07.2018 | ||
| MC | 04.07.2018 | ||
| NL | 04.07.2018 | ||
| PL | 04.07.2018 | ||
| RO | 04.07.2018 | ||
| RS | 04.07.2018 | ||
| SE | 04.07.2018 | ||
| SI | 04.07.2018 | ||
| SK | 04.07.2018 | ||
| SM | 04.07.2018 | ||
| BG | 04.10.2018 | ||
| NO | 04.10.2018 | ||
| GR | 05.10.2018 | ||
| IS | 04.11.2018 | ||
| LU | 10.11.2018 | ||
| CH | 30.11.2018 | ||
| LI | 30.11.2018 | ||
| Former [2019/37] | AL | 04.07.2018 | |
| AT | 04.07.2018 | ||
| CZ | 04.07.2018 | ||
| DK | 04.07.2018 | ||
| EE | 04.07.2018 | ||
| ES | 04.07.2018 | ||
| FI | 04.07.2018 | ||
| HR | 04.07.2018 | ||
| IT | 04.07.2018 | ||
| LT | 04.07.2018 | ||
| LV | 04.07.2018 | ||
| MC | 04.07.2018 | ||
| NL | 04.07.2018 | ||
| PL | 04.07.2018 | ||
| RO | 04.07.2018 | ||
| RS | 04.07.2018 | ||
| SE | 04.07.2018 | ||
| SI | 04.07.2018 | ||
| SK | 04.07.2018 | ||
| SM | 04.07.2018 | ||
| BG | 04.10.2018 | ||
| NO | 04.10.2018 | ||
| GR | 05.10.2018 | ||
| IS | 04.11.2018 | ||
| LU | 10.11.2018 | ||
| Former [2019/34] | AL | 04.07.2018 | |
| AT | 04.07.2018 | ||
| CZ | 04.07.2018 | ||
| DK | 04.07.2018 | ||
| EE | 04.07.2018 | ||
| ES | 04.07.2018 | ||
| FI | 04.07.2018 | ||
| HR | 04.07.2018 | ||
| IT | 04.07.2018 | ||
| LT | 04.07.2018 | ||
| LV | 04.07.2018 | ||
| MC | 04.07.2018 | ||
| NL | 04.07.2018 | ||
| PL | 04.07.2018 | ||
| RO | 04.07.2018 | ||
| RS | 04.07.2018 | ||
| SE | 04.07.2018 | ||
| SK | 04.07.2018 | ||
| SM | 04.07.2018 | ||
| BG | 04.10.2018 | ||
| NO | 04.10.2018 | ||
| GR | 05.10.2018 | ||
| IS | 04.11.2018 | ||
| LU | 10.11.2018 | ||
| Former [2019/33] | AL | 04.07.2018 | |
| AT | 04.07.2018 | ||
| CZ | 04.07.2018 | ||
| DK | 04.07.2018 | ||
| EE | 04.07.2018 | ||
| ES | 04.07.2018 | ||
| FI | 04.07.2018 | ||
| HR | 04.07.2018 | ||
| IT | 04.07.2018 | ||
| LT | 04.07.2018 | ||
| LV | 04.07.2018 | ||
| MC | 04.07.2018 | ||
| NL | 04.07.2018 | ||
| PL | 04.07.2018 | ||
| RO | 04.07.2018 | ||
| RS | 04.07.2018 | ||
| SE | 04.07.2018 | ||
| SK | 04.07.2018 | ||
| SM | 04.07.2018 | ||
| BG | 04.10.2018 | ||
| NO | 04.10.2018 | ||
| GR | 05.10.2018 | ||
| IS | 04.11.2018 | ||
| Former [2019/26] | AL | 04.07.2018 | |
| AT | 04.07.2018 | ||
| CZ | 04.07.2018 | ||
| DK | 04.07.2018 | ||
| EE | 04.07.2018 | ||
| ES | 04.07.2018 | ||
| FI | 04.07.2018 | ||
| HR | 04.07.2018 | ||
| IT | 04.07.2018 | ||
| LT | 04.07.2018 | ||
| LV | 04.07.2018 | ||
| NL | 04.07.2018 | ||
| PL | 04.07.2018 | ||
| RO | 04.07.2018 | ||
| RS | 04.07.2018 | ||
| SE | 04.07.2018 | ||
| SK | 04.07.2018 | ||
| SM | 04.07.2018 | ||
| BG | 04.10.2018 | ||
| NO | 04.10.2018 | ||
| GR | 05.10.2018 | ||
| IS | 04.11.2018 | ||
| Former [2019/24] | AL | 04.07.2018 | |
| AT | 04.07.2018 | ||
| CZ | 04.07.2018 | ||
| EE | 04.07.2018 | ||
| ES | 04.07.2018 | ||
| FI | 04.07.2018 | ||
| HR | 04.07.2018 | ||
| IT | 04.07.2018 | ||
| LT | 04.07.2018 | ||
| LV | 04.07.2018 | ||
| NL | 04.07.2018 | ||
| PL | 04.07.2018 | ||
| RO | 04.07.2018 | ||
| RS | 04.07.2018 | ||
| SE | 04.07.2018 | ||
| SK | 04.07.2018 | ||
| BG | 04.10.2018 | ||
| NO | 04.10.2018 | ||
| GR | 05.10.2018 | ||
| IS | 04.11.2018 | ||
| Former [2019/22] | AL | 04.07.2018 | |
| AT | 04.07.2018 | ||
| CZ | 04.07.2018 | ||
| ES | 04.07.2018 | ||
| FI | 04.07.2018 | ||
| HR | 04.07.2018 | ||
| IT | 04.07.2018 | ||
| LT | 04.07.2018 | ||
| LV | 04.07.2018 | ||
| NL | 04.07.2018 | ||
| PL | 04.07.2018 | ||
| RO | 04.07.2018 | ||
| RS | 04.07.2018 | ||
| SE | 04.07.2018 | ||
| BG | 04.10.2018 | ||
| NO | 04.10.2018 | ||
| GR | 05.10.2018 | ||
| IS | 04.11.2018 | ||
| Former [2019/21] | AL | 04.07.2018 | |
| AT | 04.07.2018 | ||
| CZ | 04.07.2018 | ||
| ES | 04.07.2018 | ||
| FI | 04.07.2018 | ||
| HR | 04.07.2018 | ||
| IT | 04.07.2018 | ||
| LT | 04.07.2018 | ||
| LV | 04.07.2018 | ||
| NL | 04.07.2018 | ||
| PL | 04.07.2018 | ||
| RS | 04.07.2018 | ||
| SE | 04.07.2018 | ||
| BG | 04.10.2018 | ||
| NO | 04.10.2018 | ||
| GR | 05.10.2018 | ||
| IS | 04.11.2018 | ||
| Former [2019/12] | AL | 04.07.2018 | |
| AT | 04.07.2018 | ||
| CZ | 04.07.2018 | ||
| ES | 04.07.2018 | ||
| FI | 04.07.2018 | ||
| HR | 04.07.2018 | ||
| LT | 04.07.2018 | ||
| LV | 04.07.2018 | ||
| NL | 04.07.2018 | ||
| PL | 04.07.2018 | ||
| RS | 04.07.2018 | ||
| SE | 04.07.2018 | ||
| BG | 04.10.2018 | ||
| NO | 04.10.2018 | ||
| GR | 05.10.2018 | ||
| IS | 04.11.2018 | ||
| Former [2019/11] | AT | 04.07.2018 | |
| CZ | 04.07.2018 | ||
| FI | 04.07.2018 | ||
| HR | 04.07.2018 | ||
| LT | 04.07.2018 | ||
| NL | 04.07.2018 | ||
| PL | 04.07.2018 | ||
| RS | 04.07.2018 | ||
| SE | 04.07.2018 | ||
| BG | 04.10.2018 | ||
| NO | 04.10.2018 | ||
| GR | 05.10.2018 | ||
| IS | 04.11.2018 | ||
| Former [2019/10] | AT | 04.07.2018 | |
| CZ | 04.07.2018 | ||
| FI | 04.07.2018 | ||
| LT | 04.07.2018 | ||
| NL | 04.07.2018 | ||
| PL | 04.07.2018 | ||
| RS | 04.07.2018 | ||
| SE | 04.07.2018 | ||
| BG | 04.10.2018 | ||
| NO | 04.10.2018 | ||
| GR | 05.10.2018 | ||
| IS | 04.11.2018 | ||
| Former [2019/08] | FI | 04.07.2018 | |
| LT | 04.07.2018 | ||
| NL | 04.07.2018 | ||
| NO | 04.10.2018 | ||
| IS | 04.11.2018 | ||
| Former [2019/07] | LT | 04.07.2018 | |
| NL | 04.07.2018 | ||
| Former [2019/04] | NL | 04.07.2018 | Documents cited: | Search | [XA] JPH0827263 * (corr. to EP 0535464) Art. 54(2) EPC * | [XA] DATABASE WPI Week 199614, Derwent World Patents Index; AN 1996-136397, XP002770311 * (corr. to EP 0535464) Art. 54(2) EPC * | International search | [A] WO2013088796 (IDEMITSU KOSAN CO et al.) [A] | [A] JP2013139097 (IDEMITSU KOSAN CO et al.) [A] | [A] JP2007204737 (MITSUBISHI ENG PLASTICS CORP et al.) [A] | [A] JP2008163070 (SUMITOMO DOW LTD et al.) [A] | [A] JP2006169451 (MITSUBISHI ENG PLASTICS CORP et al.) [A] | [A] JP2004051700 (MITSUBISHI ENG PLASTICS CORP et al.) [A] | [AP] JP2013231899 (MITSUBISHI ENG PLASTICS CORP et al.) [AP] | by applicant | JP2002060609 | JPH0469364 | WO2011083635 | WO2013088796 | JP2004018406 | Opposition | US5274009 | JPH0827263 | EP0640646 | US2005288407 | US6935864 | WO0069947 | EP0753540 | US2006262563 | JP2012177096 | US2009162628 | US7071284 | CLOUGH; ET AL: "Mechanics of Thermal and Photodegradations of Bisphenol A Polycarbonate", POLYMER DURABILITY ADVANCES IN CHEMISTRY, 5 May 1996 (1996-05-05), pages 60 - 76, XP055551658 |