blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2921092

EP2921092 - DOUGH KNEADING HOOK STRUCTURE AND DOUGH KNEADING MACHINE APPLYING IT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  15.01.2021
Database last updated on 02.09.2024
FormerThe patent has been granted
Status updated on  07.02.2020
FormerGrant of patent is intended
Status updated on  30.10.2019
FormerExamination is in progress
Status updated on  07.04.2017
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): GR
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
SHENZHEN MUREN APPLIANCE CO., LTD.
N°. 17, Zhenxing Road
Liyuhe Industrial Zone
Loucun, Gongming
Guanming New District
Shenzhen, Guangdong 518000 / CN
[2015/39]
Inventor(s)01 / WANG, Wenxiong
NO. 17, Zhenxing Road
Liyuhe Industrial Zone, Loucun
Gongming, Guangming New District
Shenzhen, Guangdong 518000 / CN
 [2015/39]
Representative(s)Becker Kurig & Partner Patentanwälte mbB
Bavariastraße 7
80336 München / DE
[N/P]
Former [2020/11]Becker & Kurig Partnerschaft Patentanwälte PartmbB
Patentanwälte
Bavariastrasse 7
80336 München / DE
Former [2015/39]Becker Kurig Straus
Patentanwälte
Bavariastrasse 7
80336 München / DE
Application number, filing date14863073.413.03.2014
[2015/39]
WO2014CN73397
Priority number, dateCN20142035814U20.01.2014         Original published format: CN 201420035814 U
[2015/39]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015106485
Date:23.07.2015
Language:ZH
[2015/29]
Type: A1 Application with search report 
No.:EP2921092
Date:23.09.2015
Language:EN
[2015/39]
Type: B1 Patent specification 
No.:EP2921092
Date:11.03.2020
Language:EN
[2020/11]
Search report(s)International search report - published on:CN23.07.2015
(Supplementary) European search report - dispatched on:EP21.06.2016
ClassificationIPC:A47J43/08, B01F7/30, B01F7/00, B01F15/00, A47J43/07, A21C1/14, A21C1/02
[2019/31]
CPC:
A47J43/0711 (EP,US); A21C1/1405 (US); A21C1/02 (EP,US);
A21C1/147 (US); A47J43/082 (EP,US); B01F27/1123 (EP,US);
B01F27/213 (EP,US); B01F27/95 (EP,US); B01F35/31 (EP,US) (-)
Former IPC [2016/29]A47J43/07, A21C1/14, B01F7/00, B01F15/00, A21C1/02, B01F7/30
Former IPC [2015/39]A47J43/07, A21C1/14
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/39]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:TEIGKNETHAKENSTRUKTUR UND TEIGKNETMASCHINE DAMIT[2015/39]
English:DOUGH KNEADING HOOK STRUCTURE AND DOUGH KNEADING MACHINE APPLYING IT[2015/39]
French:STRUCTURE DE CROCHET PÉTRISSEUR DE PÂTE ET ROBOT PÉTRISSEUR DE PÂTE L'APPLIQUANT[2015/39]
Entry into regional phase28.05.2015Translation filed 
28.05.2015National basic fee paid 
28.05.2015Search fee paid 
28.05.2015Designation fee(s) paid 
28.05.2015Examination fee paid 
Examination procedure28.05.2015Examination requested  [2015/39]
20.12.2016Amendment by applicant (claims and/or description)
07.04.2017Despatch of a communication from the examining division (Time limit: M04)
28.07.2017Reply to a communication from the examining division
25.01.2018Despatch of a communication from the examining division (Time limit: M04)
08.05.2018Reply to a communication from the examining division
01.08.2018Despatch of a communication from the examining division (Time limit: M04)
30.10.2018Reply to a communication from the examining division
14.01.2019Despatch of a communication from the examining division (Time limit: M04)
25.04.2019Reply to a communication from the examining division
31.10.2019Communication of intention to grant the patent
29.01.2020Fee for grant paid
29.01.2020Fee for publishing/printing paid
29.01.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  07.04.2017
Opposition(s)14.12.2020No opposition filed within time limit [2021/07]
Fees paidRenewal fee
09.03.2016Renewal fee patent year 03
27.03.2017Renewal fee patent year 04
28.03.2018Renewal fee patent year 05
29.03.2019Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU13.03.2014
AL11.03.2020
AT11.03.2020
CY11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
GR11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
MK11.03.2020
MT11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
TR11.03.2020
IE13.03.2020
LU13.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
BG11.06.2020
NO11.06.2020
IS11.07.2020
PT05.08.2020
[2022/33]
Former [2022/31]HU13.03.2014
AL11.03.2020
AT11.03.2020
CY11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
MK11.03.2020
MT11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
TR11.03.2020
IE13.03.2020
LU13.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
BG11.06.2020
NO11.06.2020
IS11.07.2020
PT05.08.2020
Former [2022/30]HU13.03.2014
AL11.03.2020
AT11.03.2020
CY11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
MT11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
TR11.03.2020
IE13.03.2020
LU13.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
BG11.06.2020
NO11.06.2020
IS11.07.2020
PT05.08.2020
Former [2022/27]HU13.03.2014
AT11.03.2020
CY11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
MT11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
TR11.03.2020
IE13.03.2020
LU13.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
BG11.06.2020
NO11.06.2020
IS11.07.2020
PT05.08.2020
Former [2021/11]AT11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
IE13.03.2020
LU13.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
BG11.06.2020
NO11.06.2020
IS11.07.2020
PT05.08.2020
Former [2021/09]AT11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
NL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SK11.03.2020
SM11.03.2020
IE13.03.2020
LU13.03.2020
CH31.03.2020
LI31.03.2020
BG11.06.2020
NO11.06.2020
IS11.07.2020
PT05.08.2020
Former [2021/08]CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
NL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SK11.03.2020
SM11.03.2020
IE13.03.2020
LU13.03.2020
CH31.03.2020
LI31.03.2020
BG11.06.2020
NO11.06.2020
IS11.07.2020
PT05.08.2020
Former [2021/07]CZ11.03.2020
DK11.03.2020
EE11.03.2020
FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
NL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SK11.03.2020
SM11.03.2020
IE13.03.2020
LU13.03.2020
CH31.03.2020
LI31.03.2020
BG11.06.2020
NO11.06.2020
IS11.07.2020
PT05.08.2020
Former [2021/04]CZ11.03.2020
EE11.03.2020
FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
NL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SK11.03.2020
SM11.03.2020
LU13.03.2020
BG11.06.2020
NO11.06.2020
IS11.07.2020
PT05.08.2020
Former [2020/50]CZ11.03.2020
EE11.03.2020
FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
NL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
IS11.07.2020
PT05.08.2020
Former [2020/49]CZ11.03.2020
FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
NL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
IS11.07.2020
PT05.08.2020
Former [2020/48]FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
NL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
IS11.07.2020
PT05.08.2020
Former [2020/47]FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
NL11.03.2020
RS11.03.2020
SE11.03.2020
BG11.06.2020
NO11.06.2020
IS11.07.2020
Former [2020/46]FI11.03.2020
HR11.03.2020
LV11.03.2020
NL11.03.2020
RS11.03.2020
SE11.03.2020
BG11.06.2020
NO11.06.2020
IS11.07.2020
Former [2020/45]FI11.03.2020
HR11.03.2020
LV11.03.2020
NL11.03.2020
RS11.03.2020
SE11.03.2020
BG11.06.2020
NO11.06.2020
Former [2020/39]FI11.03.2020
HR11.03.2020
LV11.03.2020
RS11.03.2020
SE11.03.2020
BG11.06.2020
NO11.06.2020
Former [2020/37]FI11.03.2020
HR11.03.2020
LV11.03.2020
RS11.03.2020
SE11.03.2020
NO11.06.2020
Former [2020/35]FI11.03.2020
NO11.06.2020
Documents cited:Search[A]US1467820  (JOSEPHINE TRUST, et al) [A] 1-12 * page 1, lines 39-46 ** figures 1,2 *;
 [XI]DE2500444  (POPEIL BROTHERS) [X] 1-3,5,12 * pages 7-8 * * page 10, paragraph 2 * * figures 1,3 * [I] 6-10;
 [XI]US4337000  (LEHMANN HERBERT G) [X] 1,5-8,12 * column 2, lines 34-45 * * column 4, lines 22-26 * * figure 8 * [I] 2-4,9-11
International search[A]FR2710551  (LOISELET MICHEL [FR]);
 [A]CN1208325  (PREMARK FEG LLC [US]);
 [A]WO2009153250  (BSH BOSCH SIEMENS HAUSGERAETE [DE], et al);
 [X]CN202269922U  (SHENZHEN MUREN APPLIANCE CO LTD);
 [X]CN102973171  (SHENZHEN MUREN APPLIANCE CO LTD);
 [A]CN103478184  (DENG YAOTIAN)
ExaminationCN102973171
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.