EP3074360 - PROCESS FOR MANUFACTURE OF PORTLAND CEMENT [Right-click to bookmark this link] | |||
Former [2016/40] | PROCESS AND APPARATUS FOR MANUFACTURE OF PORTLAND CEMENT | ||
[2018/15] | Status | No opposition filed within time limit Status updated on 06.11.2020 Database last updated on 20.07.2024 | |
Former | The patent has been granted Status updated on 05.12.2019 | ||
Former | Grant of patent is intended Status updated on 26.08.2019 | ||
Former | Examination is in progress Status updated on 13.04.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Calix Ltd Level 1 9 Bridge Street Pymble, NSW 2073 / AU | [2016/40] | Inventor(s) | 01 /
SCEATS, Mark Level 1 9 Bridge Street Pymble, New South Wales 2073 / AU | [2017/13] |
Former [2016/40] | 01 /
SCEATS, Mark 102/38 Refinery Drive Pyrmont, New South Wales 2009 / AU | Representative(s) | Games, Robert Harland Albright IP Limited County House Bayshill Road Cheltenham, Glos. GL50 3BA / GB | [2016/40] | Application number, filing date | 14865329.8 | 19.11.2014 | [2016/40] | WO2014AU01054 | Priority number, date | AU20130904639 | 29.11.2013 Original published format: AU 2013904639 | [2016/40] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015077818 | Date: | 04.06.2015 | Language: | EN | [2015/22] | Type: | A1 Application with search report | No.: | EP3074360 | Date: | 05.10.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 04.06.2015 takes the place of the publication of the European patent application. | [2016/40] | Type: | B1 Patent specification | No.: | EP3074360 | Date: | 01.01.2020 | Language: | EN | [2020/01] | Search report(s) | International search report - published on: | AU | 04.06.2015 | (Supplementary) European search report - dispatched on: | EP | 20.07.2017 | Classification | IPC: | C04B7/02, C04B7/43, C04B7/48, B01J6/00, C04B2/02 | [2016/40] | CPC: |
C04B7/434 (EP,US);
C04B2111/00017 (EP,US);
Y02P40/121 (EP,US);
Y02P40/18 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/40] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR HERSTELLUNG VON PORTLANDZEMENT | [2018/15] | English: | PROCESS FOR MANUFACTURE OF PORTLAND CEMENT | [2018/15] | French: | PROCÉDÉ POUR LA FABRICATION DE CIMENT PORTLAND | [2018/15] |
Former [2016/40] | VERFAHREN UND VORRICHTUNG ZUR HERSTELLUNG VON PORTLANDZEMENT | ||
Former [2016/40] | PROCESS AND APPARATUS FOR MANUFACTURE OF PORTLAND CEMENT | ||
Former [2016/40] | PROCÉDÉ ET APPAREIL POUR LA FABRICATION DE CIMENT PORTLAND | Entry into regional phase | 10.05.2016 | National basic fee paid | 10.05.2016 | Search fee paid | 10.05.2016 | Designation fee(s) paid | 10.05.2016 | Examination fee paid | Examination procedure | 16.04.2015 | Request for preliminary examination filed International Preliminary Examining Authority: AU | 10.05.2016 | Examination requested [2016/40] | 23.11.2017 | Amendment by applicant (claims and/or description) | 13.04.2018 | Despatch of a communication from the examining division (Time limit: M06) | 08.10.2018 | Reply to a communication from the examining division | 27.08.2019 | Communication of intention to grant the patent | 28.10.2019 | Fee for grant paid | 28.10.2019 | Fee for publishing/printing paid | 28.10.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 02.10.2020 | No opposition filed within time limit [2020/50] | Fees paid | Renewal fee | 20.09.2016 | Renewal fee patent year 03 | 24.11.2017 | Renewal fee patent year 04 | 22.11.2018 | Renewal fee patent year 05 | 26.11.2019 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.11.2014 | AL | 01.01.2020 | AT | 01.01.2020 | CY | 01.01.2020 | CZ | 01.01.2020 | DK | 01.01.2020 | EE | 01.01.2020 | FI | 01.01.2020 | HR | 01.01.2020 | LT | 01.01.2020 | LV | 01.01.2020 | MC | 01.01.2020 | MK | 01.01.2020 | MT | 01.01.2020 | RO | 01.01.2020 | RS | 01.01.2020 | SE | 01.01.2020 | SI | 01.01.2020 | SK | 01.01.2020 | SM | 01.01.2020 | BG | 01.04.2020 | NO | 01.04.2020 | GR | 02.04.2020 | IS | 01.05.2020 | PT | 27.05.2020 | [2022/31] |
Former [2022/30] | HU | 19.11.2014 | |
AL | 01.01.2020 | ||
AT | 01.01.2020 | ||
CY | 01.01.2020 | ||
CZ | 01.01.2020 | ||
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
MT | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2022/28] | HU | 19.11.2014 | |
AT | 01.01.2020 | ||
CY | 01.01.2020 | ||
CZ | 01.01.2020 | ||
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
MT | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2021/31] | AT | 01.01.2020 | |
CZ | 01.01.2020 | ||
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2021/11] | AT | 01.01.2020 | |
CZ | 01.01.2020 | ||
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/50] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/49] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/48] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/47] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/40] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/39] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
PT | 27.05.2020 | ||
Former [2020/38] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
PT | 27.05.2020 | ||
Former [2020/37] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
NO | 01.04.2020 | ||
PT | 27.05.2020 | ||
Former [2020/36] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
LT | 01.01.2020 | ||
RS | 01.01.2020 | ||
NO | 01.04.2020 | ||
PT | 27.05.2020 | ||
Former [2020/35] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
LT | 01.01.2020 | ||
NO | 01.04.2020 | Documents cited: | Search | [Y]WO2007143333 (BULK MATERIALS INTERNAT CO [US], et al) [Y] 1-6 * page 1, paragraphs 2,3 * * page 3, paragraph 3 * * page 5, paragraphs 2,3 * * page 7, paragraphs 2,4 *; | [Y]EP2559475 (ALSTOM TECHNOLOGY LTD [CH]) [Y] 1-6* abstract * | International search | [A]GB1503159 (FIVES CAIL BABCOCK [FR]); | [A]EP0030777 (F.L.SMIDTH & CO. A/S); | [X]JP2004231424 (AIENJI KK); | [X]WO2012145802 (CALIX LTD [AU], et al); | [A] - ALSOP P.A. ET AL., "Tradeship Publications Ltd, Surrey RH4 1 AR", THE CEMENT PLANT OPERATIONS HANDBOOK, UK, (2007), XP008183371 |