EP3086316 - SOUND ABSORBING AND INSULATING MATERIAL AND METHOD FOR MANUFACTURING THE SAME [Right-click to bookmark this link] | |||
Former [2016/43] | SOUND-ABSORBING/INSULATING MATERIAL AND METHOD FOR PRODUCING SAME | ||
[2019/21] | Status | No opposition filed within time limit Status updated on 10.07.2020 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 28.06.2019 | ||
Former | Grant of patent is intended Status updated on 01.05.2019 | ||
Former | Examination is in progress Status updated on 23.02.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Hyundai Motor Company 12, Heolleung-ro Seocho-gu Seoul 06797 / KR | [2016/43] | Inventor(s) | 01 /
KIM, Keun Young 219-702 Sanghyeon Maeul Ssangyong 2 Cha C Danji Apt. 30-9 Sanghyeon-ro Suji-gu Yongin-si Gyeonggi-do 448-522 / KR | [2019/31] |
Former [2016/43] | 01 /
KIM, Keun Young 219-702 Sanghyeon Maeul Ssangyong 2 Cha C Danji Apt. 30-9 Sanghyeon-ro Suji-gu Yongin-si Gyeonggi-do 448-522 / KR | Representative(s) | Isarpatent Patent- und Rechtsanwälte Barth Charles Hassa Peckmann & Partner mbB Friedrichstrasse 31 80801 München / DE | [N/P] |
Former [2016/43] | Isarpatent Patent- und Rechtsanwälte Behnisch Barth Charles Hassa Peckmann & Partner mbB Friedrichstrasse 31 80801 München / DE | Application number, filing date | 14870997.5 | 27.02.2014 | [2016/43] | WO2014KR01601 | Priority number, date | KR20130159412 | 19.12.2013 Original published format: KR 20130159412 | [2016/43] | Filing language | KO | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015093684 | Date: | 25.06.2015 | Language: | KO | [2015/25] | Type: | A1 Application with search report | No.: | EP3086316 | Date: | 26.10.2016 | Language: | EN | [2016/43] | Type: | B1 Patent specification | No.: | EP3086316 | Date: | 31.07.2019 | Language: | EN | [2019/31] | Search report(s) | International search report - published on: | KR | 25.06.2015 | (Supplementary) European search report - dispatched on: | EP | 21.06.2017 | Classification | IPC: | G10K11/162, B23B5/02, B60R13/08, D04H1/4342, D04H1/587, D04H1/64 | [2017/29] | CPC: |
G10K11/162 (EP,KR,RU,US);
B29C70/504 (US);
B32B37/14 (US);
B32B5/02 (KR);
B60R13/08 (KR,US);
B60R13/0838 (EP,US);
B60R13/0876 (EP,US);
D04H1/4342 (EP,US);
D04H1/587 (EP,US);
D04H1/64 (EP,US);
F02B77/13 (US);
B29K2079/08 (US);
B29K2105/0854 (US);
B29L2031/30 (US);
B32B2305/20 (US);
|
Former IPC [2016/43] | G10K11/162, B23B5/02, B60R13/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/43] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SCHALLSCHLUCK-/ISOLIERSTOFF UND VERFAHREN ZUR HERSTELLUNG DAVON | [2016/43] | English: | SOUND ABSORBING AND INSULATING MATERIAL AND METHOD FOR MANUFACTURING THE SAME | [2019/21] | French: | MATÉRIAU ISOPHONIQUE/ISOLANT ET SON PROCÉDÉ DE PRODUCTION | [2016/43] |
Former [2016/43] | SOUND-ABSORBING/INSULATING MATERIAL AND METHOD FOR PRODUCING SAME | Entry into regional phase | 28.06.2016 | Translation filed | 28.06.2016 | National basic fee paid | 28.06.2016 | Search fee paid | 28.06.2016 | Designation fee(s) paid | 28.06.2016 | Examination fee paid | Examination procedure | 28.06.2016 | Examination requested [2016/43] | 09.01.2018 | Amendment by applicant (claims and/or description) | 26.02.2018 | Despatch of a communication from the examining division (Time limit: M04) | 05.06.2018 | Reply to a communication from the examining division | 21.09.2018 | Despatch of a communication from the examining division (Time limit: M04) | 14.01.2019 | Reply to a communication from the examining division | 02.05.2019 | Communication of intention to grant the patent | 19.06.2019 | Fee for grant paid | 19.06.2019 | Fee for publishing/printing paid | 19.06.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 26.02.2018 | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/33] | Fees paid | Renewal fee | 28.06.2016 | Renewal fee patent year 03 | 28.02.2017 | Renewal fee patent year 04 | 28.02.2018 | Renewal fee patent year 05 | 28.02.2019 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.02.2014 | AL | 31.07.2019 | AT | 31.07.2019 | CY | 31.07.2019 | CZ | 31.07.2019 | DK | 31.07.2019 | EE | 31.07.2019 | FI | 31.07.2019 | HR | 31.07.2019 | LT | 31.07.2019 | LV | 31.07.2019 | MC | 31.07.2019 | MK | 31.07.2019 | MT | 31.07.2019 | NL | 31.07.2019 | PL | 31.07.2019 | RO | 31.07.2019 | RS | 31.07.2019 | SE | 31.07.2019 | SI | 31.07.2019 | SK | 31.07.2019 | SM | 31.07.2019 | IS | 30.10.2019 | BG | 31.10.2019 | NO | 31.10.2019 | GR | 01.11.2019 | PT | 02.12.2019 | IE | 27.02.2020 | LU | 27.02.2020 | CH | 29.02.2020 | LI | 29.02.2020 | [2022/32] |
Former [2022/28] | HU | 27.02.2014 | |
AL | 31.07.2019 | ||
AT | 31.07.2019 | ||
CY | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
MT | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
IS | 30.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
IE | 27.02.2020 | ||
LU | 27.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2021/08] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
IS | 30.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
IE | 27.02.2020 | ||
LU | 27.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2020/52] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
IS | 30.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
LU | 27.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2020/50] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
IS | 30.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
LU | 27.02.2020 | ||
Former [2020/48] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
IS | 30.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
LU | 27.02.2020 | ||
Former [2020/37] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
IS | 30.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/36] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
IS | 30.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/27] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SK | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
IS | 30.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/22] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
IS | 30.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/15] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
IS | 30.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/12] | AT | 31.07.2019 | |
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
IS | 30.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/11] | AT | 31.07.2019 | |
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/10] | AT | 31.07.2019 | |
FI | 31.07.2019 | ||
LT | 31.07.2019 | ||
NL | 31.07.2019 | ||
SE | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
PT | 02.12.2019 | ||
Former [2020/09] | FI | 31.07.2019 | |
LT | 31.07.2019 | ||
NL | 31.07.2019 | ||
NO | 31.10.2019 | ||
Former [2020/08] | LT | 31.07.2019 | |
NO | 31.10.2019 | Documents cited: | Search | [Y]JP2008050611 (UBE INDUSTRIES); | [XY]WO2009063723 (BRIDGESTONE CORP [JP], et al); | [A]US2010229517 (FUJIHARA KAN [JP]) | International search | [X]JP2006138935 (TAKAYASU CO LTD, et al); | [A]KR20060111330 (OH EUN YEONG [KR]); | [Y]WO2009054349 (KANEKA CORP [JP], et al); | [A]WO2011055530 (IST CORP [JP], et al) | by applicant | JP2007039826 | KR20070033310 | JP2007138953 |