EP3084818 - SUBSTRATE SUPPORT APPARATUS HAVING REDUCED SUBSTRATE PARTICLE GENERATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.10.2021 Database last updated on 30.10.2024 | |
Former | The patent has been granted Status updated on 23.10.2020 | ||
Former | Grant of patent is intended Status updated on 09.06.2020 | Most recent event Tooltip | 22.07.2022 | Lapse of the patent in a contracting state New state(s): BE | published on 24.08.2022 [2022/34] | Applicant(s) | For all designated states Applied Materials, Inc. 3050 Bowers Avenue Santa Clara, California 95054 / US | [2016/43] | Inventor(s) | 01 /
AGARWAL, Pulkit 2865 Homestead Road Apt. 32 Santa Clara, California 95051 / US | 02 /
SUH, Song-Moon 1780 Albert Avenue San Jose, California 95124 / US | 03 /
MORI, Glen 1900 Portmarnock Way Gilroy, California 95020 / US | 04 /
SANSONI, Steven V. 189 Ponte Court Livermore, CA 94550 / US | [2016/43] | Representative(s) | Zimmermann & Partner Patentanwälte mbB Josephspitalstr. 15 80331 München / DE | [2016/43] | Application number, filing date | 14871014.8 | 08.12.2014 | [2016/43] | WO2014US69031 | Priority number, date | US201361917324P | 17.12.2013 Original published format: US 201361917324 P | US201414554945 | 26.11.2014 Original published format: US201414554945 | [2016/43] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015094743 | Date: | 25.06.2015 | Language: | EN | [2015/25] | Type: | A1 Application with search report | No.: | EP3084818 | Date: | 26.10.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 25.06.2015 takes the place of the publication of the European patent application. | [2016/43] | Type: | B1 Patent specification | No.: | EP3084818 | Date: | 25.11.2020 | Language: | EN | [2020/48] | Search report(s) | International search report - published on: | KR | 25.06.2015 | (Supplementary) European search report - dispatched on: | EP | 03.02.2017 | Classification | IPC: | B25J11/00, B25J15/00, H01L21/687 | [2020/23] | CPC: |
H01L21/68757 (EP,KR,US);
B25J11/0095 (EP,KR,US);
B25J15/0014 (EP,KR,US);
H01L21/68707 (EP,KR,US);
H01L21/6875 (EP,KR,US)
|
Former IPC [2016/43] | H01L21/683 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/43] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SUBSTRATTRÄGERVORRICHTUNG MIT REDUZIERTER SUBSTRATPARTIKELERZEUGUNG | [2016/43] | English: | SUBSTRATE SUPPORT APPARATUS HAVING REDUCED SUBSTRATE PARTICLE GENERATION | [2016/43] | French: | APPAREIL DE SUPPORT DE SUBSTRAT PRÉSENTANT UNE PRODUCTION DE PARTICULES DE SUBSTRAT RÉDUITE | [2016/43] | Entry into regional phase | 08.06.2016 | National basic fee paid | 08.06.2016 | Search fee paid | 08.06.2016 | Designation fee(s) paid | 08.06.2016 | Examination fee paid | Examination procedure | 08.06.2016 | Examination requested [2016/43] | 08.06.2017 | Amendment by applicant (claims and/or description) | 10.06.2020 | Communication of intention to grant the patent | 14.10.2020 | Fee for grant paid | 14.10.2020 | Fee for publishing/printing paid | 14.10.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 26.08.2021 | No opposition filed within time limit [2021/44] | Fees paid | Renewal fee | 08.12.2016 | Renewal fee patent year 03 | 08.12.2017 | Renewal fee patent year 04 | 20.12.2018 | Renewal fee patent year 05 | 19.12.2019 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.12.2014 | AL | 25.11.2020 | AT | 25.11.2020 | CY | 25.11.2020 | CZ | 25.11.2020 | DK | 25.11.2020 | EE | 25.11.2020 | ES | 25.11.2020 | FI | 25.11.2020 | HR | 25.11.2020 | IT | 25.11.2020 | LT | 25.11.2020 | LV | 25.11.2020 | MC | 25.11.2020 | MK | 25.11.2020 | MT | 25.11.2020 | NL | 25.11.2020 | PL | 25.11.2020 | RO | 25.11.2020 | RS | 25.11.2020 | SE | 25.11.2020 | SI | 25.11.2020 | SK | 25.11.2020 | SM | 25.11.2020 | TR | 25.11.2020 | LU | 08.12.2020 | BE | 31.12.2020 | CH | 31.12.2020 | LI | 31.12.2020 | FR | 25.01.2021 | BG | 25.02.2021 | GB | 25.02.2021 | NO | 25.02.2021 | GR | 26.02.2021 | IS | 25.03.2021 | PT | 25.03.2021 | DE | 01.07.2021 | [2022/34] |
Former [2022/32] | HU | 08.12.2014 | |
AL | 25.11.2020 | ||
AT | 25.11.2020 | ||
CY | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
MK | 25.11.2020 | ||
MT | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
TR | 25.11.2020 | ||
LU | 08.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
FR | 25.01.2021 | ||
BG | 25.02.2021 | ||
GB | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
DE | 01.07.2021 | ||
Former [2022/27] | HU | 08.12.2014 | |
AL | 25.11.2020 | ||
AT | 25.11.2020 | ||
CY | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
MT | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
TR | 25.11.2020 | ||
LU | 08.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
FR | 25.01.2021 | ||
BG | 25.02.2021 | ||
GB | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
DE | 01.07.2021 | ||
Former [2022/23] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
LU | 08.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
FR | 25.01.2021 | ||
BG | 25.02.2021 | ||
GB | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
DE | 01.07.2021 | ||
Former [2022/10] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
LU | 08.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
FR | 25.01.2021 | ||
BG | 25.02.2021 | ||
GB | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
PT | 25.03.2021 | ||
DE | 01.07.2021 | ||
Former [2022/09] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
LU | 08.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
FR | 25.01.2021 | ||
BG | 25.02.2021 | ||
GB | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
DE | 01.07.2021 | ||
Former [2021/52] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
LU | 08.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
FR | 25.01.2021 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
DE | 01.07.2021 | ||
Former [2021/51] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
LU | 08.12.2020 | ||
FR | 25.01.2021 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
DE | 01.07.2021 | ||
Former [2021/50] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
LU | 08.12.2020 | ||
FR | 25.01.2021 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
DE | 01.07.2021 | ||
Former [2021/48] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
LU | 08.12.2020 | ||
FR | 25.01.2021 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/47] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
LU | 08.12.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/46] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/45] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/40] | AT | 25.11.2020 | |
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/37] | AT | 25.11.2020 | |
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/36] | AT | 25.11.2020 | |
CZ | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/35] | AT | 25.11.2020 | |
CZ | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/34] | AT | 25.11.2020 | |
CZ | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/33] | AT | 25.11.2020 | |
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/32] | AT | 25.11.2020 | |
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/28] | AT | 25.11.2020 | |
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/25] | AT | 25.11.2020 | |
FI | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/23] | AT | 25.11.2020 | |
FI | 25.11.2020 | ||
LV | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
PT | 25.03.2021 | ||
Former [2021/22] | FI | 25.11.2020 | |
RS | 25.11.2020 | ||
NO | 25.02.2021 | ||
PT | 25.03.2021 | ||
Former [2021/21] | FI | 25.11.2020 | |
PT | 25.03.2021 | ||
Former [2021/20] | FI | 25.11.2020 | Documents cited: | Search | [YA]EP1063683 (APPLIED MATERIALS INC [US]) [Y] 9-15 * abstract * * figures 1-15 *[A] 1-8; | [IY]US2005252454 (PARKHE VIJAY D [US], et al) [I] 1-8 * abstract * * claims 1-36 * * page 3, paragraphs 30-33 * * pages 7,8, paragraphs 55-57 * * page 10, paragraph 73 * * page 11, paragraph 77 * * page 13, paragraphs 87,88 * * figures 1,3,6,7B,11 * [Y] 9-15; | [YA]US2008105201 (RONAN TIMOTHY [US], et al) [Y] 9-15 * abstract * * page 2, paragraphs 22,23 * * page 3, paragraphs 28,29 * * page 4, paragraph 37 * * figures 1-6B * [A] 1-8; | [YA]US2010178137 (CHINTALAPATI PRUDHVI R [US], et al) [Y] 9-15 * abstract * * claims 1-24 * * pages 3,4, paragraphs 39-48 * * figures 1-7 * [A] 1-8 | International search | [A]JPH0529431 (MATSUSHITA ELECTRIC IND CO LTD); | [A]US2004241992 (KONO RYUJI [JP], et al); | [X]US2005252454 (PARKHE VIJAY D [US], et al); | [A]KR20060023735 (SAMSUNG ELECTRONICS CO LTD [KR]); | [Y]US2010178137 (CHINTALAPATI PRUDHVI R [US], et al) | by applicant | US2005252454 | US2010178137 |