EP3088112 - REPLACEABLE BLADE EDGE ROTARY CUTTING TOOL AND TOOL BODY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.03.2024 Database last updated on 19.07.2024 | |
Former | The patent has been granted Status updated on 24.03.2023 | ||
Former | Grant of patent is intended Status updated on 27.11.2022 | ||
Former | Examination is in progress Status updated on 16.04.2021 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Tungaloy Corporation 11-1, Yoshima-Kogyodanchi Iwaki-shi Fukushima 970-1144 / JP | [2016/44] | Inventor(s) | 01 /
ASO Takahiro c/o TUNGALOY CORPORATION 11-1 Yoshima-Kogyodanchi Iwaki-shi Fukushima 970-1144 / JP | [2016/44] | Representative(s) | Vossius & Partner Patentanwälte Rechtsanwälte mbB Siebertstrasse 3 81675 München / DE | [2016/44] | Application number, filing date | 14875805.5 | 24.12.2014 | [2016/44] | WO2014JP84168 | Priority number, date | JP20130266252 | 25.12.2013 Original published format: JP 2013266252 | [2016/44] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015098973 | Date: | 02.07.2015 | Language: | JA | [2015/26] | Type: | A1 Application with search report | No.: | EP3088112 | Date: | 02.11.2016 | Language: | EN | [2016/44] | Type: | B1 Patent specification | No.: | EP3088112 | Date: | 26.04.2023 | Language: | EN | [2023/17] | Search report(s) | International search report - published on: | JP | 02.07.2015 | (Supplementary) European search report - dispatched on: | EP | 07.08.2017 | Classification | IPC: | B23C5/10 | [2016/44] | CPC: |
B23C5/109 (EP,US);
B23C5/006 (EP,US);
B23C2200/0477 (US);
B23C2210/0414 (US);
B23C2210/282 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/44] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ROTIERENDES SCHNEIDWERKZEUG MIT AUSTAUSCHBARER KLINGENKANTE UND WERKZEUGKÖRPER | [2016/44] | English: | REPLACEABLE BLADE EDGE ROTARY CUTTING TOOL AND TOOL BODY | [2016/44] | French: | OUTIL DE DÉCOUPE ROTATIF À BORD DE LAME REMPLAÇABLE ET CORPS D'OUTIL | [2016/44] | Entry into regional phase | 02.06.2016 | Translation filed | 25.06.2016 | National basic fee paid | 25.06.2016 | Search fee paid | 25.06.2016 | Designation fee(s) paid | 25.06.2016 | Examination fee paid | Examination procedure | 25.06.2016 | Examination requested [2016/44] | 18.01.2018 | Amendment by applicant (claims and/or description) | 15.04.2021 | Despatch of a communication from the examining division (Time limit: M04) | 26.07.2021 | Reply to a communication from the examining division | 28.11.2022 | Communication of intention to grant the patent | 15.03.2023 | Fee for grant paid | 15.03.2023 | Fee for publishing/printing paid | 15.03.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 29.01.2024 | No opposition filed within time limit [2024/14] | Fees paid | Renewal fee | 23.12.2016 | Renewal fee patent year 03 | 21.12.2017 | Renewal fee patent year 04 | 19.12.2018 | Renewal fee patent year 05 | 19.12.2019 | Renewal fee patent year 06 | 22.12.2020 | Renewal fee patent year 07 | 24.12.2021 | Renewal fee patent year 08 | 23.12.2022 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 26.04.2023 | CZ | 26.04.2023 | DK | 26.04.2023 | EE | 26.04.2023 | ES | 26.04.2023 | FI | 26.04.2023 | HR | 26.04.2023 | IT | 26.04.2023 | LT | 26.04.2023 | LV | 26.04.2023 | NL | 26.04.2023 | PL | 26.04.2023 | RO | 26.04.2023 | RS | 26.04.2023 | SE | 26.04.2023 | SI | 26.04.2023 | SK | 26.04.2023 | SM | 26.04.2023 | NO | 26.07.2023 | GR | 27.07.2023 | IS | 26.08.2023 | PT | 28.08.2023 | [2024/26] |
Former [2024/24] | AT | 26.04.2023 | |
CZ | 26.04.2023 | ||
DK | 26.04.2023 | ||
EE | 26.04.2023 | ||
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RO | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SI | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2024/10] | AT | 26.04.2023 | |
CZ | 26.04.2023 | ||
DK | 26.04.2023 | ||
EE | 26.04.2023 | ||
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RO | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2024/08] | AT | 26.04.2023 | |
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2024/03] | AT | 26.04.2023 | |
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2024/01] | AT | 26.04.2023 | |
ES | 26.04.2023 | ||
HR | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2023/51] | AT | 26.04.2023 | |
ES | 26.04.2023 | ||
HR | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2023/50] | AT | 26.04.2023 | |
ES | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
SE | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2023/48] | AT | 26.04.2023 | |
ES | 26.04.2023 | ||
NL | 26.04.2023 | ||
SE | 26.04.2023 | ||
NO | 26.07.2023 | ||
PT | 28.08.2023 | ||
Former [2023/46] | ES | 26.04.2023 | |
NL | 26.04.2023 | ||
PT | 28.08.2023 | ||
Former [2023/43] | NL | 26.04.2023 | Documents cited: | Search | [Y]US5083887 (DOTANY AMRAM [IL]) [Y] 6 * column 3, line 33 - line 39 * * figure 5 *; | [A]JPH1135U ((ISCAR LTD)) [A] 1-7 * figure 4(a) *; | [X]WO9928074 (KENNAMETAL INC [US]) [X] 1,7 * page 10, line 32 - page 12, line 33 * * figures 1-3 *; | [A]US5913644 (DEROCHE KENNETH G [US], et al) [A] 1-7 * column 2, line 22 - line 29 * * column 3, line 19 - line 30 * * column 4, line 7 - line 21 * * figure 1 *; | [XY]US2005084341 (LONG THOMAS J II [US], et al) [X] 1,2,4,5,7 * paragraph [0021] - paragraph [0031] * * figures 1-5 * [Y] 3,6; | [A]US6976811 (DEROCHE KENNETH G [US], et al) [A] 1-7 * figures 1,2,4 *; | [A]JP2007268693 (KYOCERA CORP) [A] 1-7 * paragraph [0035] ** figure 1 *; | [A]US2011123280 (HOBOHM UWE [DE]) [A] 1-7 * paragraphs [0028] , [0033] * * figure 2 *; | [YD]JP2012020394 (HITACHI TOOL) [YD] 3 * paragraph [0099] * * figures 2,8 * | International search | [Y]JPH0118211Y (ESKAR LTD.); | [X]JP2002512131 (KENNAMETAL INC.); | [A]JP2004510594 (KENNAMETAL INC.); | [A]US2005084341 (LONG THOMAS J II [US], et al); | [A]JP2007268693 (KYOCERA CORP); | [A]JP2011521794 (KENNAMETAL INC.) | by applicant | JP2012020394 |