EP3093198 - VEHICLE AND CONTROL METHOD FOR VEHICLE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.02.2022 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 12.03.2021 | ||
Former | Grant of patent is intended Status updated on 01.11.2020 | ||
Former | Examination is in progress Status updated on 08.04.2020 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Kawasaki Jukogyo Kabushiki Kaisha 1-1, Higashikawasaki-cho 3-chome Chuo-ku Kobe-shi, Hyogo 650-8670 / JP | [2016/46] | Inventor(s) | 01 /
AZUMA, Seiji c/o Kawasaki Jukogyo Kabushiki Kaisha 1-1, Kawasaki-cho Akashi-shi, 673-8666 Hyogo / JP | [2021/15] |
Former [2016/47] | 01 /
AZUMA, Seiji c/o KAWASAKI JUKOGYO KABUSHIKI KAISHA 1-1, Kawasaki-cho Akashi-shi, 673-8666 Hyogo / JP | ||
Former [2016/46] | 01 /
AZUMA, Seiji / JP | Representative(s) | Witte, Weller & Partner Patentanwälte mbB Postfach 10 54 62 70047 Stuttgart / DE | [2016/46] | Application number, filing date | 14878077.8 | 25.12.2014 | [2016/46] | WO2014JP06457 | Priority number, date | WO2014JP50220 | 09.01.2014 Original published format: PCT/JP2014/050220 | [2016/46] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015104782 | Date: | 16.07.2015 | Language: | JA | [2015/28] | Type: | A1 Application with search report | No.: | EP3093198 | Date: | 16.11.2016 | Language: | EN | [2016/46] | Type: | B1 Patent specification | No.: | EP3093198 | Date: | 14.04.2021 | Language: | EN | [2021/15] | Search report(s) | International search report - published on: | JP | 16.07.2015 | (Supplementary) European search report - dispatched on: | EP | 26.07.2017 | Classification | IPC: | B60R16/02, B60W50/04, B60T8/17 | [2017/34] | CPC: |
B60W50/0098 (EP,US);
B60T8/1706 (EP,US);
B60W10/11 (US);
B60W10/18 (US);
B60W10/20 (US);
B60W30/02 (US);
B60W50/082 (EP,US);
B60W2050/0062 (EP,US);
B60W2050/0066 (EP,US);
B60W2050/0074 (US);
B60W2300/36 (EP,US);
B60W2510/0604 (US);
B60W2510/10 (US);
B60W2520/28 (US);
B60W2710/10 (US);
|
Former IPC [2016/46] | B60R16/02, B60W50/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/46] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | FAHRZEUG UND FAHRZEUGSTEUERUNGSVERFAHREN | [2016/46] | English: | VEHICLE AND CONTROL METHOD FOR VEHICLE | [2016/46] | French: | VÉHICULE ET PROCÉDÉ DE COMMANDE POUR VÉHICULE | [2016/46] | Entry into regional phase | 09.08.2016 | Translation filed | 09.08.2016 | National basic fee paid | 09.08.2016 | Search fee paid | 09.08.2016 | Designation fee(s) paid | 09.08.2016 | Examination fee paid | Examination procedure | 09.08.2016 | Examination requested [2016/46] | 22.11.2017 | Amendment by applicant (claims and/or description) | 15.04.2020 | Despatch of a communication from the examining division (Time limit: M04) | 24.08.2020 | Reply to a communication from the examining division | 02.11.2020 | Communication of intention to grant the patent | 05.03.2021 | Fee for grant paid | 05.03.2021 | Fee for publishing/printing paid | 05.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 17.01.2022 | No opposition filed within time limit [2022/12] | Fees paid | Renewal fee | 21.12.2016 | Renewal fee patent year 03 | 20.12.2017 | Renewal fee patent year 04 | 21.12.2018 | Renewal fee patent year 05 | 17.12.2019 | Renewal fee patent year 06 | 23.12.2020 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.12.2014 | AL | 14.04.2021 | AT | 14.04.2021 | CY | 14.04.2021 | CZ | 14.04.2021 | DK | 14.04.2021 | EE | 14.04.2021 | ES | 14.04.2021 | FI | 14.04.2021 | HR | 14.04.2021 | IT | 14.04.2021 | LT | 14.04.2021 | LV | 14.04.2021 | MC | 14.04.2021 | MK | 14.04.2021 | NL | 14.04.2021 | PL | 14.04.2021 | RO | 14.04.2021 | RS | 14.04.2021 | SE | 14.04.2021 | SI | 14.04.2021 | SK | 14.04.2021 | SM | 14.04.2021 | BG | 14.07.2021 | NO | 14.07.2021 | GR | 15.07.2021 | IS | 14.08.2021 | PT | 16.08.2021 | GB | 25.12.2021 | IE | 25.12.2021 | LU | 25.12.2021 | BE | 31.12.2021 | CH | 31.12.2021 | FR | 31.12.2021 | LI | 31.12.2021 | [2024/22] |
Former [2023/30] | HU | 25.12.2014 | |
AL | 14.04.2021 | ||
AT | 14.04.2021 | ||
CY | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
IT | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
GB | 25.12.2021 | ||
IE | 25.12.2021 | ||
LU | 25.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
FR | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/29] | HU | 25.12.2014 | |
AL | 14.04.2021 | ||
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
IT | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
GB | 25.12.2021 | ||
IE | 25.12.2021 | ||
LU | 25.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
FR | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/03] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
IT | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
GB | 25.12.2021 | ||
IE | 25.12.2021 | ||
LU | 25.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
FR | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/01] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
IT | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
GB | 25.12.2021 | ||
IE | 25.12.2021 | ||
LU | 25.12.2021 | ||
BE | 31.12.2021 | ||
FR | 31.12.2021 | ||
Former [2022/48] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
IT | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
GB | 25.12.2021 | ||
IE | 25.12.2021 | ||
LU | 25.12.2021 | ||
Former [2022/47] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
IT | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
GB | 25.12.2021 | ||
LU | 25.12.2021 | ||
Former [2022/46] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
IT | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
LU | 25.12.2021 | ||
Former [2022/36] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
IT | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/33] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/29] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/26] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/23] | AT | 14.04.2021 | |
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/10] | AT | 14.04.2021 | |
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
PT | 16.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 14.04.2021 | |
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/08] | AT | 14.04.2021 | |
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/07] | AT | 14.04.2021 | |
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2021/52] | AT | 14.04.2021 | |
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2021/51] | AT | 14.04.2021 | |
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2021/50] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
SE | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
PT | 16.08.2021 | ||
Former [2021/49] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
SE | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
Former [2021/47] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
LT | 14.04.2021 | ||
NL | 14.04.2021 | ||
BG | 14.07.2021 | ||
Former [2021/46] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
LT | 14.04.2021 | Documents cited: | Search | [A]DE102004020110 (PORSCHE AG [DE]) [A] 1-11* the whole document *; | [XY]EP2233388 (BAYERISCHE MOTOREN WERKE AG [DE]) [X] 1-9 * paragraphs [0015] , [0025] * * paragraphs [0035] , [0043] * * figures 1,2 * [Y] 10,11; | [Y]EP2551158 (KAWASAKI HEAVY IND LTD [JP]) [Y] 11 * paragraph [0066] *; | [Y]US2013261914 (INGRAM BENJAMIN T [US], et al) [Y] 10 * figure 12 *; | [Y]WO2013186208 (JAGUAR LAND ROVER LTD [GB]) [Y] 10 * page 2, line 5 - line 14 * * page 16, line 7 - line 9 * * page 21, line 5 - line 15 * | International search | [X]JP2008523519 (ROBERT BOSCH GMBH) | by applicant | JP2007055595 |