blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3099635

EP3099635 - SYSTEMS AND METHODS FOR INTERRELATED CONTROL OF CHLORINATORS AND PUMPS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  03.06.2022
Database last updated on 19.07.2024
FormerThe patent has been granted
Status updated on  25.06.2021
FormerGrant of patent is intended
Status updated on  10.02.2021
FormerExamination is in progress
Status updated on  11.05.2019
FormerRequest for examination was made
Status updated on  04.11.2016
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Hayward Industries, Inc.
400 Connell Drive, Suite 6100
Berkeley Heights, NJ 07922 / US
[2020/11]
Former [2016/49]For all designated states
Hayward Industries, Inc.
620 Division Street
Elizabeth, NJ 07201 / US
Inventor(s)01 / MURDOCK, James
118 Greenwood Drive
Wakefield, RI 02879 / US
 [2016/49]
Representative(s)Cross, James Peter Archibald, et al
Maucher Jenkins
Seventh Floor Offices
Artillery House
11-19 Artillery Row
London SW1P 1RT / GB
[N/P]
Former [2016/49]Cross, James Peter Archibald, et al
Maucher Jenkins
26 Caxton Street
London SW1H 0RJ / GB
Application number, filing date14880968.428.01.2014
[2016/49]
WO2014US13390
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015116035
Date:06.08.2015
Language:EN
[2015/31]
Type: A1 Application with search report 
No.:EP3099635
Date:07.12.2016
Language:EN
The application published by WIPO in one of the EPO official languages on 06.08.2015 takes the place of the publication of the European patent application.
[2016/49]
Type: B1 Patent specification 
No.:EP3099635
Date:28.07.2021
Language:EN
[2021/30]
Search report(s)International search report - published on:US06.08.2015
(Supplementary) European search report - dispatched on:EP04.08.2017
ClassificationIPC:C02F1/467, E04H4/12, // C02F103/42
[2017/36]
CPC:
C02F1/008 (EP,US); C02F1/4674 (EP,US); E04H4/1209 (EP,US);
E04H4/1281 (EP,US); C02F2103/42 (EP,US); C02F2201/002 (US);
C02F2201/005 (EP,US); C02F2201/4612 (EP,US); C02F2201/4615 (US);
C02F2209/003 (EP,US); C02F2209/005 (EP,US); C02F2209/006 (US);
C02F2209/29 (EP,US); C02F2303/04 (EP,US) (-)
Former IPC [2016/49]C02F1/467
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/49]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:SYSTEME UND VERFAHREN ZUR ZUSAMMENHÄNGENDEN STEUERUNG VON CHLORDOSIERERN UND PUMPEN[2016/49]
English:SYSTEMS AND METHODS FOR INTERRELATED CONTROL OF CHLORINATORS AND PUMPS[2016/49]
French:SYSTÈMES ET PROCÉDÉS POUR LA COMMANDE INTERDÉPENDANTE DE CHLORATEURS ET DE POMPES[2016/49]
Entry into regional phase23.08.2016National basic fee paid 
23.08.2016Search fee paid 
23.08.2016Designation fee(s) paid 
23.08.2016Examination fee paid 
Examination procedure23.08.2016Examination requested  [2016/49]
23.08.2016Date on which the examining division has become responsible
01.03.2018Amendment by applicant (claims and/or description)
15.05.2019Despatch of a communication from the examining division (Time limit: M06)
25.11.2019Reply to a communication from the examining division
18.01.2021Cancellation of oral proceeding that was planned for 20.01.2021
20.01.2021Date of oral proceedings (cancelled)
11.02.2021Communication of intention to grant the patent
18.06.2021Fee for grant paid
18.06.2021Fee for publishing/printing paid
18.06.2021Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  15.05.2019
Opposition(s)29.04.2022No opposition filed within time limit [2022/27]
Fees paidRenewal fee
23.08.2016Renewal fee patent year 03
27.01.2017Renewal fee patent year 04
29.01.2018Renewal fee patent year 05
28.01.2019Renewal fee patent year 06
27.01.2020Renewal fee patent year 07
27.01.2021Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.01.2014
AL28.07.2021
AT28.07.2021
CY28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
MK28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
TR28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
GB28.01.2022
IE28.01.2022
LU28.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
[2024/29]
Former [2024/22]HU28.01.2014
AL28.07.2021
AT28.07.2021
CY28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
MK28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
GB28.01.2022
IE28.01.2022
LU28.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
Former [2024/20]HU28.01.2014
AL28.07.2021
AT28.07.2021
CY28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
GB28.01.2022
IE28.01.2022
LU28.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
Former [2024/18]HU28.01.2014
AL28.07.2021
AT28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
GB28.01.2022
IE28.01.2022
LU28.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
Former [2023/09]AL28.07.2021
AT28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
GB28.01.2022
IE28.01.2022
LU28.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
Former [2023/03]AL28.07.2021
AT28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
GB28.01.2022
LU28.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
Former [2023/01]AL28.07.2021
AT28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
GB28.01.2022
LU28.01.2022
BE31.01.2022
Former [2022/47]AL28.07.2021
AT28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
GB28.01.2022
LU28.01.2022
Former [2022/46]AL28.07.2021
AT28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
LU28.01.2022
Former [2022/39]AL28.07.2021
AT28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/36]AL28.07.2021
AT28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/29]AL28.07.2021
AT28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/26]AT28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/24]AT28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SK28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/21]AT28.07.2021
DK28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
PL28.07.2021
RS28.07.2021
SE28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/10]AT28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
PL28.07.2021
RS28.07.2021
SE28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/09]AT28.07.2021
FI28.07.2021
LT28.07.2021
NL28.07.2021
RS28.07.2021
SE28.07.2021
BG28.10.2021
NO28.10.2021
PT29.11.2021
Former [2022/08]AT28.07.2021
FI28.07.2021
LT28.07.2021
NL28.07.2021
SE28.07.2021
BG28.10.2021
NO28.10.2021
Former [2022/07]AT28.07.2021
LT28.07.2021
NL28.07.2021
NO28.10.2021
Documents cited:Search[XI]US5985155  (MAITLAND PETER [US]) [X] 1-5,12,13 * column 3, lines 5-8,29-32,43-53 * * column 5, lines 9-14,26-50 * * figures 1,2,6 * * claims 1,4,7 * [I] 6-11,14,15;
 [A]WO2011143736  (GECKO ALLIANCE GROUP INC [CA], et al) [A] 1-15* the whole document *;
 [X]US2011290707  (PORAT JOSEPH [US]) [X] 1,12,13 * paragraphs [0022] - [0029] - [0080] , [0091] * * figure 1 *;
 [X]AU2013100126  (ASTRAL POOL AUSTRALIA PTY LTD) [X] 1,12,13 * pages 4-7; figures 1-3 *
International search[Y]US2008237148  (DENNIS RICHARD [US], et al);
 [A]US2010254825  (STILES JR ROBERT W [US], et al);
 [X]US2011290707  (PORAT JOSEPH [US])
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.