blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3125625

EP3125625 - RESOURCE ALLOCATION METHOD, RESOURCE CONTENTION METHOD, AND RELATED TERMINALS [Right-click to bookmark this link]
Former [2017/05]RESOURCE ALLOCATION METHOD, RESOURCE CONTENTION METHOD, AND RELATED APPARATUSES
[2018/27]
StatusNo opposition filed within time limit
Status updated on  11.10.2019
Database last updated on 03.06.2024
FormerThe patent has been granted
Status updated on  03.12.2018
FormerGrant of patent is intended
Status updated on  18.06.2018
FormerRequest for examination was made
Status updated on  30.12.2016
FormerThe international publication has been made
Status updated on  04.11.2016
Most recent event   Tooltip01.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 03.08.2022  [2022/31]
Applicant(s)For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
[2018/49]
Former [2017/05]For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
Inventor(s)01 / ZHANG, Xingwei
Huawei Administration Building
Bantian
Longgang District
Shenzhen Guangdong 518129 / CN
 [2017/05]
Representative(s)Pfenning, Meinig & Partner mbB
Patent- und Rechtsanwälte
Theresienhöhe 11a
80339 München / DE
[2017/05]
Application number, filing date14889528.718.04.2014
[2017/05]
WO2014CN75692
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015157991
Date:22.10.2015
Language:ZH
[2015/42]
Type: A1 Application with search report 
No.:EP3125625
Date:01.02.2017
Language:EN
[2017/05]
Type: B1 Patent specification 
No.:EP3125625
Date:05.12.2018
Language:EN
[2018/49]
Search report(s)International search report - published on:CN22.10.2015
(Supplementary) European search report - dispatched on:EP08.03.2017
ClassificationIPC:H04W72/04, // H04W74/00, H04W74/08, H04W76/14
[2018/27]
CPC:
H04W74/002 (EP,KR,US); H04W72/20 (KR); H04W76/14 (US);
H04W72/0446 (US); H04W74/08 (EP,KR,US)
Former IPC [2017/05]H04W72/04
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/05]
TitleGerman:RESSOURCENZUWEISUNGSVERFAHREN, RESSOURCENKONFLIKTVERFAHREN UND ENTSPRECHENDE ENDGERÄTE[2018/27]
English:RESOURCE ALLOCATION METHOD, RESOURCE CONTENTION METHOD, AND RELATED TERMINALS[2018/27]
French:PROCÉDÉ D'ATTRIBUTION DE RESSOURCE, PROCÉDÉ DE CONTENTION DE RESSOURCE ET TERMINAUX ASSOCIÉS[2018/27]
Former [2017/05]RESSOURCENZUWEISUNGSVERFAHREN, RESSOURCENKONFLIKTVERFAHREN UND ENTSPRECHENDE VORRICHTUNGEN
Former [2017/05]RESOURCE ALLOCATION METHOD, RESOURCE CONTENTION METHOD, AND RELATED APPARATUSES
Former [2017/05]PROCÉDÉ D'ATTRIBUTION DE RESSOURCE, PROCÉDÉ DE CONTENTION DE RESSOURCE ET APPAREILS ASSOCIÉS
Entry into regional phase27.10.2016Translation filed 
27.10.2016National basic fee paid 
27.10.2016Search fee paid 
27.10.2016Designation fee(s) paid 
27.10.2016Examination fee paid 
Examination procedure27.10.2016Examination requested  [2017/05]
27.10.2016Date on which the examining division has become responsible
19.09.2017Amendment by applicant (claims and/or description)
19.06.2018Communication of intention to grant the patent
27.09.2018Fee for grant paid
27.09.2018Fee for publishing/printing paid
25.10.2018Receipt of the translation of the claim(s)
Divisional application(s)EP18205281.1  / EP3522660
Opposition(s)06.09.2019No opposition filed within time limit [2019/46]
Fees paidRenewal fee
27.10.2016Renewal fee patent year 03
28.04.2017Renewal fee patent year 04
30.04.2018Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU18.04.2014
AL05.12.2018
AT05.12.2018
CY05.12.2018
CZ05.12.2018
DK05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
MC05.12.2018
MK05.12.2018
MT05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SI05.12.2018
SK05.12.2018
SM05.12.2018
TR05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
IE18.04.2019
LU18.04.2019
BE30.04.2019
CH30.04.2019
FR30.04.2019
LI30.04.2019
[2022/31]
Former [2021/34]HU18.04.2014
AL05.12.2018
AT05.12.2018
CY05.12.2018
CZ05.12.2018
DK05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
MC05.12.2018
MT05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SI05.12.2018
SK05.12.2018
SM05.12.2018
TR05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
IE18.04.2019
LU18.04.2019
BE30.04.2019
CH30.04.2019
FR30.04.2019
LI30.04.2019
Former [2021/32]HU18.04.2014
AL05.12.2018
AT05.12.2018
CY05.12.2018
CZ05.12.2018
DK05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
MC05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SI05.12.2018
SK05.12.2018
SM05.12.2018
TR05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
IE18.04.2019
LU18.04.2019
BE30.04.2019
CH30.04.2019
FR30.04.2019
LI30.04.2019
Former [2021/26]AL05.12.2018
AT05.12.2018
CY05.12.2018
CZ05.12.2018
DK05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
MC05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SI05.12.2018
SK05.12.2018
SM05.12.2018
TR05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
IE18.04.2019
LU18.04.2019
BE30.04.2019
CH30.04.2019
FR30.04.2019
LI30.04.2019
Former [2020/29]AL05.12.2018
AT05.12.2018
CZ05.12.2018
DK05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
MC05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SI05.12.2018
SK05.12.2018
SM05.12.2018
TR05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
IE18.04.2019
LU18.04.2019
BE30.04.2019
CH30.04.2019
FR30.04.2019
LI30.04.2019
Former [2020/21]AL05.12.2018
AT05.12.2018
CZ05.12.2018
DK05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
MC05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SI05.12.2018
SK05.12.2018
SM05.12.2018
TR05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
IE18.04.2019
LU18.04.2019
BE30.04.2019
CH30.04.2019
LI30.04.2019
Former [2020/17]AL05.12.2018
AT05.12.2018
CZ05.12.2018
DK05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
MC05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SI05.12.2018
SK05.12.2018
SM05.12.2018
TR05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
LU18.04.2019
BE30.04.2019
CH30.04.2019
LI30.04.2019
Former [2020/11]AL05.12.2018
AT05.12.2018
CZ05.12.2018
DK05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
MC05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SI05.12.2018
SK05.12.2018
SM05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
LU18.04.2019
BE30.04.2019
CH30.04.2019
LI30.04.2019
Former [2020/04]AL05.12.2018
AT05.12.2018
CZ05.12.2018
DK05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
MC05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SI05.12.2018
SK05.12.2018
SM05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
LU18.04.2019
Former [2020/02]AL05.12.2018
AT05.12.2018
CZ05.12.2018
DK05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
MC05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SI05.12.2018
SK05.12.2018
SM05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
Former [2019/50]AL05.12.2018
AT05.12.2018
CZ05.12.2018
DK05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SI05.12.2018
SK05.12.2018
SM05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
Former [2019/48]AL05.12.2018
AT05.12.2018
CZ05.12.2018
DK05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SK05.12.2018
SM05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
Former [2019/39]AL05.12.2018
AT05.12.2018
CZ05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SK05.12.2018
SM05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
Former [2019/37]AL05.12.2018
AT05.12.2018
CZ05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SM05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
PT05.04.2019
Former [2019/35]AL05.12.2018
AT05.12.2018
CZ05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
NL05.12.2018
PL05.12.2018
RS05.12.2018
SE05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
PT05.04.2019
Former [2019/34]AL05.12.2018
AT05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
NL05.12.2018
RS05.12.2018
SE05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
PT05.04.2019
Former [2019/33]AL05.12.2018
AT05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
NL05.12.2018
RS05.12.2018
SE05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
PT05.04.2019
Former [2019/30]AL05.12.2018
AT05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
NL05.12.2018
RS05.12.2018
SE05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
Former [2019/26]AL05.12.2018
AT05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
RS05.12.2018
SE05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
Former [2019/25]AT05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
RS05.12.2018
SE05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
Former [2019/24]AT05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
SE05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
Former [2019/23]AT05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
BG05.03.2019
NO05.03.2019
Former [2019/22]FI05.12.2018
LT05.12.2018
BG05.03.2019
NO05.03.2019
Former [2019/21]FI05.12.2018
LT05.12.2018
NO05.03.2019
Former [2019/20]LT05.12.2018
NO05.03.2019
Documents cited:Search[A]US2014094183  (GAO CHUNYAN [CN], et al) [A] 1-17 * paragraph [0001] * * paragraph [0014] - paragraph [0018] * * paragraph [0026] - paragraph [0027] * * paragraph [0040] - paragraph [0042] * * paragraph [0057] * * paragraph [0060] *;
 [A]  - PANASONIC, "Consideration on contention based and scheduling based resource allocation schemes in D2D", vol. RAN WG1, no. San Francisco, USA; 20131111 - 20131115, (20131101), 3GPP DRAFT; R1-135400, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_75/Docs/, (20131101), XP050750642 [A] 1-17 * the whole document *
 [A]  - SAMSUNG, "Resource allocation for D2D broadcast communication", vol. RAN WG1, no. Prague, Czech Republic; 20140210 - 20140214, (20140201), 3GPP DRAFT; R1-140390 RESOURCE ALLOCATION FOR D2D BROADCAST COMMUNICATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_76/Docs/, (20140201), XP050752018 [A] 1-17 * the whole document *
 [A]  - HUAWEI ET AL, "Consideration on Mode 2 resource allocation", vol. RAN WG1, no. Shenzhen, China; 20140331 - 20140404, (20140322), 3GPP DRAFT; R1-141593, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_76b/Docs/, (20140322), XP050813992 [A] 1-17 * the whole document *
International search[A]WO2013062310  (LG ELECTRONICS INC [KR]) [A] 1-96* , the whole document *;
 [A]CN103517371  (CHINA MOBILE COMM CORP) [A] 1-96 * , the whole document *;
 [X]CN103686753  (HUAWEI TECH CO LTD) [X] 1-96 * , description, paragraphs [0162]-[0207], and figures 1, 9 and 10 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.