blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3133864

EP3133864 - METHOD AND SYSTEM FOR CONTROLLING ACCESS OF CSG IN DUAL-CONNECTION ARCHITECTURE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.04.2024
Database last updated on 11.05.2024
FormerThe patent has been granted
Status updated on  19.05.2023
FormerGrant of patent is intended
Status updated on  08.03.2023
FormerExamination is in progress
Status updated on  18.01.2019
FormerRequest for examination was made
Status updated on  20.01.2017
FormerThe international publication has been made
Status updated on  07.11.2016
Most recent event   Tooltip10.05.2024Lapse of the patent in a contracting state
New state(s): BE, CH, SI
published on 12.06.2024 [2024/24]
Applicant(s)For all designated states
ZTE Corporation
ZTE Plaza, Keji Road South
Hi-Tech Industrial Park
Nanshan
Shenzhen, Guangdong 518057 / CN
[2023/25]
Former [2017/08]For all designated states
ZTE Corporation
ZTE Plaza, Keji Road South
Hi-Tech Industrial Park
Nanshan
Shenzhen, Guangdong 518057 / CN
Inventor(s)01 / HUANG, Ying
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park
Nanshan
Shenzhen Guangdong 518057 / CN
02 / GAO, Yin
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park
Nanshan
Shenzhen Guangdong 518057 / CN
03 / XIE, Feng
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park
Nanshan
Shenzhen Guangdong 518057 / CN
04 / HAN, Lifeng
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park
Nanshan
Shenzhen Guangdong 518057 / CN
05 / LIANG, Shuang
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park
Nanshan
Shenzhen Guangdong 518057 / CN
 [2017/08]
Representative(s)Aipex B.V.
Vestdijk 51
5611 CA Eindhoven / NL
[N/P]
Former [2023/25]Aipex B.V.
P.O. Box 30223
3001 DE Rotterdam / NL
Former [2017/08]Awapatent AB
Junkersgatan 1
582 35 Linköping / SE
Application number, filing date14889608.729.07.2014
[2017/08]
WO2014CN83248
Priority number, dateCN20141014817214.04.2014         Original published format: CN201410148172
[2017/08]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015158060
Date:22.10.2015
Language:ZH
[2015/42]
Type: A1 Application with search report 
No.:EP3133864
Date:22.02.2017
Language:EN
[2017/08]
Type: B1 Patent specification 
No.:EP3133864
Date:21.06.2023
Language:EN
[2023/25]
Search report(s)International search report - published on:CN22.10.2015
(Supplementary) European search report - dispatched on:EP22.02.2017
ClassificationIPC:H04W48/20, H04W36/00, H04W76/15, // H04W84/04
[2023/12]
CPC:
H04W48/20 (EP,US); H04W8/20 (US); H04W16/32 (US);
H04W36/0069 (EP,US); H04W36/08 (US); H04W76/15 (EP,US);
H04W84/042 (US); H04W84/045 (EP,US) (-)
Former IPC [2017/12]H04W48/20, H04W76/02, // H04W84/04
Former IPC [2017/08]H04W36/08
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/08]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VERFAHREN UND SYSTEM ZUR STEUERUNG DES ZUGRIFFS AUF CSG IN DOPPELVERBINDUNGSARCHITEKTUR[2017/08]
English:METHOD AND SYSTEM FOR CONTROLLING ACCESS OF CSG IN DUAL-CONNECTION ARCHITECTURE[2017/08]
French:PROCÉDÉ ET SYSTÈME POUR COMMANDER L'ACCÈS D'UN GROUPE D'ABONNÉS FERMÉ (CSG) DANS UNE ARCHITECTURE À DOUBLE CONNEXION[2017/08]
Entry into regional phase17.10.2016Translation filed 
17.10.2016National basic fee paid 
17.10.2016Search fee paid 
17.10.2016Designation fee(s) paid 
17.10.2016Examination fee paid 
Examination procedure17.10.2016Examination requested  [2017/08]
17.10.2016Date on which the examining division has become responsible
23.08.2017Amendment by applicant (claims and/or description)
18.01.2019Despatch of a communication from the examining division (Time limit: M04)
16.04.2019Reply to a communication from the examining division
07.04.2020Despatch of a communication from the examining division (Time limit: M04)
05.08.2020Reply to a communication from the examining division
26.10.2021Cancellation of oral proceeding that was planned for 25.11.2021
08.11.2021Despatch of communication that the application is refused, reason: substantive examination {1}
25.11.2021Date of oral proceedings (cancelled)
13.02.2023Cancellation of oral proceeding that was planned for 09.03.2023
09.03.2023Communication of intention to grant the patent
09.03.2023Date of oral proceedings (cancelled)
15.05.2023Fee for grant paid
15.05.2023Fee for publishing/printing paid
15.05.2023Receipt of the translation of the claim(s)
Appeal following examination18.01.2022Appeal received No.  T0682/22
18.01.2022Payment of appeal fee
08.03.2022Statement of grounds filed
20.07.2022Result of appeal procedure: continuation of examination procedure
27.07.2022Despatch of the decision of the Board of Appeal
Opposition(s)22.03.2024No opposition filed within time limit [2024/22]
Fees paidRenewal fee
17.10.2016Renewal fee patent year 03
25.07.2017Renewal fee patent year 04
23.07.2018Renewal fee patent year 05
15.07.2019Renewal fee patent year 06
13.07.2020Renewal fee patent year 07
09.07.2021Renewal fee patent year 08
27.05.2022Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT21.06.2023
CZ21.06.2023
DK21.06.2023
EE21.06.2023
ES21.06.2023
FI21.06.2023
HR21.06.2023
LT21.06.2023
LV21.06.2023
MC21.06.2023
PL21.06.2023
RO21.06.2023
RS21.06.2023
SE21.06.2023
SI21.06.2023
SK21.06.2023
SM21.06.2023
LU29.07.2023
BE31.07.2023
CH31.07.2023
NO21.09.2023
GR22.09.2023
IS21.10.2023
PT23.10.2023
[2024/24]
Former [2024/22]AT21.06.2023
CZ21.06.2023
DK21.06.2023
EE21.06.2023
ES21.06.2023
FI21.06.2023
HR21.06.2023
LT21.06.2023
LV21.06.2023
MC21.06.2023
PL21.06.2023
RO21.06.2023
RS21.06.2023
SE21.06.2023
SK21.06.2023
SM21.06.2023
LU29.07.2023
NO21.09.2023
GR22.09.2023
IS21.10.2023
PT23.10.2023
Former [2024/18]AT21.06.2023
CZ21.06.2023
EE21.06.2023
ES21.06.2023
FI21.06.2023
HR21.06.2023
LT21.06.2023
LV21.06.2023
MC21.06.2023
PL21.06.2023
RO21.06.2023
RS21.06.2023
SE21.06.2023
SK21.06.2023
SM21.06.2023
LU29.07.2023
NO21.09.2023
GR22.09.2023
IS21.10.2023
PT23.10.2023
Former [2024/16]AT21.06.2023
CZ21.06.2023
EE21.06.2023
ES21.06.2023
FI21.06.2023
HR21.06.2023
LT21.06.2023
LV21.06.2023
MC21.06.2023
PL21.06.2023
RO21.06.2023
RS21.06.2023
SE21.06.2023
SK21.06.2023
SM21.06.2023
NO21.09.2023
GR22.09.2023
IS21.10.2023
PT23.10.2023
Former [2024/10]AT21.06.2023
CZ21.06.2023
EE21.06.2023
ES21.06.2023
FI21.06.2023
HR21.06.2023
LT21.06.2023
LV21.06.2023
PL21.06.2023
RO21.06.2023
RS21.06.2023
SE21.06.2023
SK21.06.2023
SM21.06.2023
NO21.09.2023
GR22.09.2023
IS21.10.2023
PT23.10.2023
Former [2024/09]AT21.06.2023
CZ21.06.2023
ES21.06.2023
FI21.06.2023
HR21.06.2023
LT21.06.2023
LV21.06.2023
RS21.06.2023
SE21.06.2023
SK21.06.2023
SM21.06.2023
NO21.09.2023
GR22.09.2023
IS21.10.2023
Former [2024/08]FI21.06.2023
HR21.06.2023
LT21.06.2023
LV21.06.2023
RS21.06.2023
SE21.06.2023
SK21.06.2023
SM21.06.2023
NO21.09.2023
GR22.09.2023
Former [2024/03]FI21.06.2023
HR21.06.2023
LT21.06.2023
LV21.06.2023
RS21.06.2023
SE21.06.2023
NO21.09.2023
GR22.09.2023
Former [2024/01]HR21.06.2023
LT21.06.2023
LV21.06.2023
RS21.06.2023
SE21.06.2023
NO21.09.2023
GR22.09.2023
Former [2023/51]HR21.06.2023
RS21.06.2023
SE21.06.2023
NO21.09.2023
GR22.09.2023
Former [2023/50]SE21.06.2023
NO21.09.2023
GR22.09.2023
Former [2023/48]SE21.06.2023
NO21.09.2023
Documents cited:Search[E]WO2015144253  (NOKIA SOLUTIONS & NETWORKS OY [FI]) [E] 1-32* page 14, line 17 - page 20, line 31; figures 4-6 *;
 [I]  - QUALCOMM INCORPORATED ET AL, "Analysis of SA2 impacts related to the study on Small Cell Enhancements in RAN2", vol. SA WG2, no. Taipei, Taiwan; 20140120 - 20140124, (20140119), 3GPP DRAFT; S2-140233 SA2 SMALL CELL ENH IMPACTS, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/SA/SA2/Docs/, (20140119), XP050744562 [I] 1,17,32 * the whole document *
International search[A]WO2011023099  (ZTE CORP [CN], et al) [A] 1-42 * , the whole document *;
 [X]US2012157077  (LEE SEUNG QUE [KR], et al) [X] 1-6, 22-26, 41-42 * , claim 8, and description, paragraphs [0037]-[0077] *;
 [A]US2013079021  (CENTONZA ANGELO [GB]) [A] 1-42* , the whole document *
ExaminationWO2015111978
 EP3131341
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.