EP3133864 - METHOD AND SYSTEM FOR CONTROLLING ACCESS OF CSG IN DUAL-CONNECTION ARCHITECTURE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.04.2024 Database last updated on 11.05.2024 | |
Former | The patent has been granted Status updated on 19.05.2023 | ||
Former | Grant of patent is intended Status updated on 08.03.2023 | ||
Former | Examination is in progress Status updated on 18.01.2019 | ||
Former | Request for examination was made Status updated on 20.01.2017 | ||
Former | The international publication has been made Status updated on 07.11.2016 | Most recent event Tooltip | 10.05.2024 | Lapse of the patent in a contracting state New state(s): BE, CH, SI | published on 12.06.2024 [2024/24] | Applicant(s) | For all designated states ZTE Corporation ZTE Plaza, Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen, Guangdong 518057 / CN | [2023/25] |
Former [2017/08] | For all designated states ZTE Corporation ZTE Plaza, Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen, Guangdong 518057 / CN | Inventor(s) | 01 /
HUANG, Ying ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen Guangdong 518057 / CN | 02 /
GAO, Yin ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen Guangdong 518057 / CN | 03 /
XIE, Feng ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen Guangdong 518057 / CN | 04 /
HAN, Lifeng ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen Guangdong 518057 / CN | 05 /
LIANG, Shuang ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen Guangdong 518057 / CN | [2017/08] | Representative(s) | Aipex B.V. Vestdijk 51 5611 CA Eindhoven / NL | [N/P] |
Former [2023/25] | Aipex B.V. P.O. Box 30223 3001 DE Rotterdam / NL | ||
Former [2017/08] | Awapatent AB Junkersgatan 1 582 35 Linköping / SE | Application number, filing date | 14889608.7 | 29.07.2014 | [2017/08] | WO2014CN83248 | Priority number, date | CN201410148172 | 14.04.2014 Original published format: CN201410148172 | [2017/08] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015158060 | Date: | 22.10.2015 | Language: | ZH | [2015/42] | Type: | A1 Application with search report | No.: | EP3133864 | Date: | 22.02.2017 | Language: | EN | [2017/08] | Type: | B1 Patent specification | No.: | EP3133864 | Date: | 21.06.2023 | Language: | EN | [2023/25] | Search report(s) | International search report - published on: | CN | 22.10.2015 | (Supplementary) European search report - dispatched on: | EP | 22.02.2017 | Classification | IPC: | H04W48/20, H04W36/00, H04W76/15, // H04W84/04 | [2023/12] | CPC: |
H04W48/20 (EP,US);
H04W8/20 (US);
H04W16/32 (US);
H04W36/0069 (EP,US);
H04W36/08 (US);
H04W76/15 (EP,US);
|
Former IPC [2017/12] | H04W48/20, H04W76/02, // H04W84/04 | ||
Former IPC [2017/08] | H04W36/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/08] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN UND SYSTEM ZUR STEUERUNG DES ZUGRIFFS AUF CSG IN DOPPELVERBINDUNGSARCHITEKTUR | [2017/08] | English: | METHOD AND SYSTEM FOR CONTROLLING ACCESS OF CSG IN DUAL-CONNECTION ARCHITECTURE | [2017/08] | French: | PROCÉDÉ ET SYSTÈME POUR COMMANDER L'ACCÈS D'UN GROUPE D'ABONNÉS FERMÉ (CSG) DANS UNE ARCHITECTURE À DOUBLE CONNEXION | [2017/08] | Entry into regional phase | 17.10.2016 | Translation filed | 17.10.2016 | National basic fee paid | 17.10.2016 | Search fee paid | 17.10.2016 | Designation fee(s) paid | 17.10.2016 | Examination fee paid | Examination procedure | 17.10.2016 | Examination requested [2017/08] | 17.10.2016 | Date on which the examining division has become responsible | 23.08.2017 | Amendment by applicant (claims and/or description) | 18.01.2019 | Despatch of a communication from the examining division (Time limit: M04) | 16.04.2019 | Reply to a communication from the examining division | 07.04.2020 | Despatch of a communication from the examining division (Time limit: M04) | 05.08.2020 | Reply to a communication from the examining division | 26.10.2021 | Cancellation of oral proceeding that was planned for 25.11.2021 | 08.11.2021 | Despatch of communication that the application is refused, reason: substantive examination {1} | 25.11.2021 | Date of oral proceedings (cancelled) | 13.02.2023 | Cancellation of oral proceeding that was planned for 09.03.2023 | 09.03.2023 | Communication of intention to grant the patent | 09.03.2023 | Date of oral proceedings (cancelled) | 15.05.2023 | Fee for grant paid | 15.05.2023 | Fee for publishing/printing paid | 15.05.2023 | Receipt of the translation of the claim(s) | Appeal following examination | 18.01.2022 | Appeal received No. T0682/22 | 18.01.2022 | Payment of appeal fee | 08.03.2022 | Statement of grounds filed | 20.07.2022 | Result of appeal procedure: continuation of examination procedure | 27.07.2022 | Despatch of the decision of the Board of Appeal | Opposition(s) | 22.03.2024 | No opposition filed within time limit [2024/22] | Fees paid | Renewal fee | 17.10.2016 | Renewal fee patent year 03 | 25.07.2017 | Renewal fee patent year 04 | 23.07.2018 | Renewal fee patent year 05 | 15.07.2019 | Renewal fee patent year 06 | 13.07.2020 | Renewal fee patent year 07 | 09.07.2021 | Renewal fee patent year 08 | 27.05.2022 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 21.06.2023 | CZ | 21.06.2023 | DK | 21.06.2023 | EE | 21.06.2023 | ES | 21.06.2023 | FI | 21.06.2023 | HR | 21.06.2023 | LT | 21.06.2023 | LV | 21.06.2023 | MC | 21.06.2023 | PL | 21.06.2023 | RO | 21.06.2023 | RS | 21.06.2023 | SE | 21.06.2023 | SI | 21.06.2023 | SK | 21.06.2023 | SM | 21.06.2023 | LU | 29.07.2023 | BE | 31.07.2023 | CH | 31.07.2023 | NO | 21.09.2023 | GR | 22.09.2023 | IS | 21.10.2023 | PT | 23.10.2023 | [2024/24] |
Former [2024/22] | AT | 21.06.2023 | |
CZ | 21.06.2023 | ||
DK | 21.06.2023 | ||
EE | 21.06.2023 | ||
ES | 21.06.2023 | ||
FI | 21.06.2023 | ||
HR | 21.06.2023 | ||
LT | 21.06.2023 | ||
LV | 21.06.2023 | ||
MC | 21.06.2023 | ||
PL | 21.06.2023 | ||
RO | 21.06.2023 | ||
RS | 21.06.2023 | ||
SE | 21.06.2023 | ||
SK | 21.06.2023 | ||
SM | 21.06.2023 | ||
LU | 29.07.2023 | ||
NO | 21.09.2023 | ||
GR | 22.09.2023 | ||
IS | 21.10.2023 | ||
PT | 23.10.2023 | ||
Former [2024/18] | AT | 21.06.2023 | |
CZ | 21.06.2023 | ||
EE | 21.06.2023 | ||
ES | 21.06.2023 | ||
FI | 21.06.2023 | ||
HR | 21.06.2023 | ||
LT | 21.06.2023 | ||
LV | 21.06.2023 | ||
MC | 21.06.2023 | ||
PL | 21.06.2023 | ||
RO | 21.06.2023 | ||
RS | 21.06.2023 | ||
SE | 21.06.2023 | ||
SK | 21.06.2023 | ||
SM | 21.06.2023 | ||
LU | 29.07.2023 | ||
NO | 21.09.2023 | ||
GR | 22.09.2023 | ||
IS | 21.10.2023 | ||
PT | 23.10.2023 | ||
Former [2024/16] | AT | 21.06.2023 | |
CZ | 21.06.2023 | ||
EE | 21.06.2023 | ||
ES | 21.06.2023 | ||
FI | 21.06.2023 | ||
HR | 21.06.2023 | ||
LT | 21.06.2023 | ||
LV | 21.06.2023 | ||
MC | 21.06.2023 | ||
PL | 21.06.2023 | ||
RO | 21.06.2023 | ||
RS | 21.06.2023 | ||
SE | 21.06.2023 | ||
SK | 21.06.2023 | ||
SM | 21.06.2023 | ||
NO | 21.09.2023 | ||
GR | 22.09.2023 | ||
IS | 21.10.2023 | ||
PT | 23.10.2023 | ||
Former [2024/10] | AT | 21.06.2023 | |
CZ | 21.06.2023 | ||
EE | 21.06.2023 | ||
ES | 21.06.2023 | ||
FI | 21.06.2023 | ||
HR | 21.06.2023 | ||
LT | 21.06.2023 | ||
LV | 21.06.2023 | ||
PL | 21.06.2023 | ||
RO | 21.06.2023 | ||
RS | 21.06.2023 | ||
SE | 21.06.2023 | ||
SK | 21.06.2023 | ||
SM | 21.06.2023 | ||
NO | 21.09.2023 | ||
GR | 22.09.2023 | ||
IS | 21.10.2023 | ||
PT | 23.10.2023 | ||
Former [2024/09] | AT | 21.06.2023 | |
CZ | 21.06.2023 | ||
ES | 21.06.2023 | ||
FI | 21.06.2023 | ||
HR | 21.06.2023 | ||
LT | 21.06.2023 | ||
LV | 21.06.2023 | ||
RS | 21.06.2023 | ||
SE | 21.06.2023 | ||
SK | 21.06.2023 | ||
SM | 21.06.2023 | ||
NO | 21.09.2023 | ||
GR | 22.09.2023 | ||
IS | 21.10.2023 | ||
Former [2024/08] | FI | 21.06.2023 | |
HR | 21.06.2023 | ||
LT | 21.06.2023 | ||
LV | 21.06.2023 | ||
RS | 21.06.2023 | ||
SE | 21.06.2023 | ||
SK | 21.06.2023 | ||
SM | 21.06.2023 | ||
NO | 21.09.2023 | ||
GR | 22.09.2023 | ||
Former [2024/03] | FI | 21.06.2023 | |
HR | 21.06.2023 | ||
LT | 21.06.2023 | ||
LV | 21.06.2023 | ||
RS | 21.06.2023 | ||
SE | 21.06.2023 | ||
NO | 21.09.2023 | ||
GR | 22.09.2023 | ||
Former [2024/01] | HR | 21.06.2023 | |
LT | 21.06.2023 | ||
LV | 21.06.2023 | ||
RS | 21.06.2023 | ||
SE | 21.06.2023 | ||
NO | 21.09.2023 | ||
GR | 22.09.2023 | ||
Former [2023/51] | HR | 21.06.2023 | |
RS | 21.06.2023 | ||
SE | 21.06.2023 | ||
NO | 21.09.2023 | ||
GR | 22.09.2023 | ||
Former [2023/50] | SE | 21.06.2023 | |
NO | 21.09.2023 | ||
GR | 22.09.2023 | ||
Former [2023/48] | SE | 21.06.2023 | |
NO | 21.09.2023 | Documents cited: | Search | [E]WO2015144253 (NOKIA SOLUTIONS & NETWORKS OY [FI]) [E] 1-32* page 14, line 17 - page 20, line 31; figures 4-6 *; | [I] - QUALCOMM INCORPORATED ET AL, "Analysis of SA2 impacts related to the study on Small Cell Enhancements in RAN2", vol. SA WG2, no. Taipei, Taiwan; 20140120 - 20140124, (20140119), 3GPP DRAFT; S2-140233 SA2 SMALL CELL ENH IMPACTS, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/SA/SA2/Docs/, (20140119), XP050744562 [I] 1,17,32 * the whole document * | International search | [A]WO2011023099 (ZTE CORP [CN], et al) [A] 1-42 * , the whole document *; | [X]US2012157077 (LEE SEUNG QUE [KR], et al) [X] 1-6, 22-26, 41-42 * , claim 8, and description, paragraphs [0037]-[0077] *; | [A]US2013079021 (CENTONZA ANGELO [GB]) [A] 1-42* , the whole document * | Examination | WO2015111978 | EP3131341 |