EP3197216 - SYNCHRONIZATION SIGNAL TRANSMITTING METHOD, RECEIVING METHOD, AND RELATED DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.09.2019 Database last updated on 15.07.2024 | |
Former | The patent has been granted Status updated on 28.09.2018 | ||
Former | Grant of patent is intended Status updated on 17.05.2018 | ||
Former | Request for examination was made Status updated on 23.06.2017 | ||
Former | The international publication has been made Status updated on 21.02.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2017/30] | Inventor(s) | 01 /
JI, Tong Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | 02 /
WU, Yiling Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | 03 /
ZHANG, Weiliang Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2018/44] |
Former [2017/30] | 01 /
JI, Tong Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | ||
02 /
WU, Yiling Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | |||
03 /
ZHANG, Weiliang Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | Representative(s) | Goddar, Heinz J. Boehmert & Boehmert Anwaltspartnerschaft mbB Pettenkoferstrasse 22 80336 München / DE | [2017/30] | Application number, filing date | 14900070.5 | 19.08.2014 | [2017/30] | WO2014CN84721 | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016026085 | Date: | 25.02.2016 | Language: | ZH | [2016/08] | Type: | A1 Application with search report | No.: | EP3197216 | Date: | 26.07.2017 | Language: | EN | [2017/30] | Type: | B1 Patent specification | No.: | EP3197216 | Date: | 31.10.2018 | Language: | EN | [2018/44] | Search report(s) | International search report - published on: | CN | 25.02.2016 | (Supplementary) European search report - dispatched on: | EP | 23.10.2017 | Classification | IPC: | H04J11/00, H04W56/00, H04L27/26 | [2018/24] | CPC: |
H04L27/2613 (EP,CN,US);
H04W56/002 (CN);
H04J11/0069 (US);
H04J13/0055 (US);
H04J13/0062 (EP,US);
H04L27/2692 (EP,US);
|
Former IPC [2017/47] | H04W56/00, H04J11/00 | ||
Former IPC [2017/30] | H04W56/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/30] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR ÜBERTRAGUNG VON SYNCHRONISATIONSSIGNALEN, EMPFANGSVERFAHREN UND ENTSPRECHENDE VORRICHTUNG | [2017/30] | English: | SYNCHRONIZATION SIGNAL TRANSMITTING METHOD, RECEIVING METHOD, AND RELATED DEVICE | [2017/30] | French: | PROCÉDÉ DE TRANSMISSION D'UN SIGNAL DE SYNCHRONISATION, PROCÉDÉ DE RÉCEPTION, ET DISPOSITIF ASSOCIÉ | [2017/30] | Entry into regional phase | 21.02.2017 | Translation filed | 21.02.2017 | National basic fee paid | 21.02.2017 | Search fee paid | 21.02.2017 | Designation fee(s) paid | 21.02.2017 | Examination fee paid | Examination procedure | 21.02.2017 | Amendment by applicant (claims and/or description) | 21.02.2017 | Examination requested [2017/30] | 21.02.2017 | Date on which the examining division has become responsible | 18.05.2018 | Communication of intention to grant the patent | 24.08.2018 | Fee for grant paid | 24.08.2018 | Fee for publishing/printing paid | 26.09.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 01.08.2019 | No opposition filed within time limit [2019/41] | Fees paid | Renewal fee | 21.02.2017 | Renewal fee patent year 03 | 22.08.2017 | Renewal fee patent year 04 | 14.08.2018 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.08.2014 | AL | 31.10.2018 | AT | 31.10.2018 | CY | 31.10.2018 | CZ | 31.10.2018 | DK | 31.10.2018 | EE | 31.10.2018 | ES | 31.10.2018 | FI | 31.10.2018 | HR | 31.10.2018 | IT | 31.10.2018 | LT | 31.10.2018 | LV | 31.10.2018 | MC | 31.10.2018 | MK | 31.10.2018 | MT | 31.10.2018 | NL | 31.10.2018 | PL | 31.10.2018 | RO | 31.10.2018 | RS | 31.10.2018 | SE | 31.10.2018 | SI | 31.10.2018 | SK | 31.10.2018 | SM | 31.10.2018 | TR | 31.10.2018 | BG | 31.01.2019 | NO | 31.01.2019 | GR | 01.02.2019 | IS | 28.02.2019 | PT | 01.03.2019 | [2022/31] |
Former [2021/34] | HU | 19.08.2014 | |
AL | 31.10.2018 | ||
AT | 31.10.2018 | ||
CY | 31.10.2018 | ||
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
ES | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
IT | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
MC | 31.10.2018 | ||
MT | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
SI | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
TR | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2021/32] | HU | 19.08.2014 | |
AL | 31.10.2018 | ||
AT | 31.10.2018 | ||
CY | 31.10.2018 | ||
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
ES | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
IT | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
MC | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
SI | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
TR | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2021/26] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
CY | 31.10.2018 | ||
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
ES | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
IT | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
MC | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
SI | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
TR | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2020/25] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
ES | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
IT | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
MC | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
SI | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
TR | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2020/17] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
ES | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
IT | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
SI | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
TR | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/50] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
ES | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
IT | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
SI | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/40] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
ES | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
IT | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/37] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
ES | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
IT | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
SM | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/35] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
ES | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
IT | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/34] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
DK | 31.10.2018 | ||
ES | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
IT | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/26] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
ES | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/25] | AT | 31.10.2018 | |
ES | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
Former [2019/24] | AT | 31.10.2018 | |
ES | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
SE | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
Former [2019/23] | AT | 31.10.2018 | |
ES | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
IS | 28.02.2019 | ||
Former [2019/22] | FI | 31.10.2018 | |
LT | 31.10.2018 | ||
PL | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
IS | 28.02.2019 | ||
Former [2019/21] | FI | 31.10.2018 | |
LT | 31.10.2018 | ||
NO | 31.01.2019 | ||
IS | 28.02.2019 | ||
Former [2019/20] | LT | 31.10.2018 | |
NO | 31.01.2019 | Documents cited: | Search | [A]WO2008075881 (LG ELECTRONICS INC [KR], et al) [A] 1-15 * page 13, line 14 - page 15, line 14 * * page 80 - page 86 *; | [A] - Joydeep Acharya ET AL, "chapter 4: Physical Layer Signal Processing in LTE", Heterogeneous Networks in LTE-Advanced, Wiley & Sons, (20140314), pages 73 - 77, ISBN 978-1-118-51186-2, XP055355432 [A] 1-15 * the whole document * DOI: http://dx.doi.org/10.1002/9781118693964.ch4 | International search | [XA]CN101479951 (TEXAS INSTRUMENTS INC [US]) [X] 4, 5, 11-15, 18, 19, 25-29 * claims 1 to 3, description, paragraphs [0003], [0028], [0034] to [0038], [0058] and figures 1, 5 and 14 the whole document * [A] 1-3, 6-10, 16, 17, 20-24; | [A]CN102857457 (SHENZHEN WINHAP COMM INC) [A] 1-29 * the whole document *; | [A]CN103178913 (UNIV SOUTHEAST) [A] 1-29 * the whole document *; | [A] - GLL, MALIK MUHAMMAD USMAN et al., "Robust synchronization for OFDM employing Zadoff-Chu sequence", 2012 46th Annual Conference on Information Sciences and Systems (CISS, (20120323), doi:doi:10.1109/CISS.2012.6310837, pages 1 - 6, XP032241458 [A] 1-29 DOI: http://dx.doi.org/10.1109/CISS.2012.6310837 |