EP3188582 - WORKING HEAD UNIT, MOUNTING DEVICE, AND METHOD FOR CONTROLLING WORKING HEAD UNIT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.02.2021 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 06.03.2020 | ||
Former | Grant of patent is intended Status updated on 10.12.2019 | ||
Former | Examination is in progress Status updated on 02.02.2019 | ||
Former | Request for examination was made Status updated on 02.06.2017 | ||
Former | The international publication has been made Status updated on 17.02.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states FUJI Corporation 19 Chausuyama Yamamachi Chiryu Aichi / JP | [2018/43] |
Former [2017/27] | For all designated states Fuji Machine Mfg. Co., Ltd. 19, Chausuyama Yamamachi Chiryu-shi, Aichi 472-8686 / JP | Inventor(s) | 01 /
MAEDA, Fumitaka c/o FUJI Corporation 19 Chausuyama Yamamachi Chiryu Aichi / JP | 02 /
ITO, Hidetoshi c/o FUJI Corporation 19 Chausuyama Yamamachi Chiryu Aichi / JP | [2019/07] |
Former [2017/27] | 01 /
MAEDA, Fumitaka c/o FUJI MACHINE MFG. CO. LTD. 19 Chausuyama Yamamachi Chiryu-shi Aichi 472-8686 / JP | ||
02 /
ITO, Hidetoshi c/o FUJI MACHINE MFG. CO. LTD. 19 Chausuyama Yamamachi Chiryu-shi Aichi 472-8686 / JP | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2017/27] | Application number, filing date | 14900735.3 | 29.08.2014 | [2017/27] | WO2014JP72750 | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016031053 | Date: | 03.03.2016 | Language: | JA | [2016/09] | Type: | A1 Application with search report | No.: | EP3188582 | Date: | 05.07.2017 | Language: | EN | [2017/27] | Type: | B1 Patent specification | No.: | EP3188582 | Date: | 08.04.2020 | Language: | EN | [2020/15] | Search report(s) | International search report - published on: | JP | 03.03.2016 | (Supplementary) European search report - dispatched on: | EP | 02.08.2017 | Classification | IPC: | H05K13/04, H05K13/08, H05K13/00, G05B19/402, G05D3/12 | [2020/01] | CPC: |
H05K13/0413 (EP,US);
H05K13/046 (US);
G05B19/402 (EP,US);
H05K13/041 (EP,US);
G05B2219/37175 (EP,US);
G05B2219/37263 (EP,US);
|
Former IPC [2017/35] | H05K13/04, H05K13/00, H05K13/08, G05D3/12 | ||
Former IPC [2017/27] | H05K13/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/27] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ARBEITSKOPFEINHEIT, MONTAGEVORRICHTUNG UND VERFAHREN ZUR STEUERUNG DER ARBEITSKOPFEINHEIT | [2017/27] | English: | WORKING HEAD UNIT, MOUNTING DEVICE, AND METHOD FOR CONTROLLING WORKING HEAD UNIT | [2017/27] | French: | UNITÉ DE TÊTE DE TRAVAIL, DISPOSITIF DE MONTAGE ET PROCÉDÉ DE COMMANDE D'UNITÉ DE TÊTE DE TRAVAIL | [2017/27] | Entry into regional phase | 16.02.2017 | Translation filed | 16.02.2017 | National basic fee paid | 16.02.2017 | Search fee paid | 16.02.2017 | Designation fee(s) paid | 16.02.2017 | Examination fee paid | Examination procedure | 16.02.2017 | Examination requested [2017/27] | 16.02.2017 | Date on which the examining division has become responsible | 28.02.2018 | Amendment by applicant (claims and/or description) | 06.02.2019 | Despatch of a communication from the examining division (Time limit: M04) | 06.06.2019 | Reply to a communication from the examining division | 11.12.2019 | Communication of intention to grant the patent | 27.02.2020 | Fee for grant paid | 27.02.2020 | Fee for publishing/printing paid | 27.02.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 12.01.2021 | No opposition filed within time limit [2021/11] | Fees paid | Renewal fee | 16.02.2017 | Renewal fee patent year 03 | 14.08.2017 | Renewal fee patent year 04 | 10.08.2018 | Renewal fee patent year 05 | 15.08.2019 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.08.2014 | AL | 08.04.2020 | AT | 08.04.2020 | CY | 08.04.2020 | CZ | 08.04.2020 | DK | 08.04.2020 | EE | 08.04.2020 | ES | 08.04.2020 | FI | 08.04.2020 | HR | 08.04.2020 | IT | 08.04.2020 | LT | 08.04.2020 | LV | 08.04.2020 | MC | 08.04.2020 | MK | 08.04.2020 | MT | 08.04.2020 | NL | 08.04.2020 | PL | 08.04.2020 | RO | 08.04.2020 | RS | 08.04.2020 | SE | 08.04.2020 | SI | 08.04.2020 | SK | 08.04.2020 | SM | 08.04.2020 | TR | 08.04.2020 | BG | 08.07.2020 | NO | 08.07.2020 | GR | 09.07.2020 | IS | 08.08.2020 | PT | 17.08.2020 | GB | 29.08.2020 | IE | 29.08.2020 | LU | 29.08.2020 | BE | 31.08.2020 | CH | 31.08.2020 | FR | 31.08.2020 | LI | 31.08.2020 | [2022/32] |
Former [2022/27] | HU | 29.08.2014 | |
AL | 08.04.2020 | ||
AT | 08.04.2020 | ||
CY | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
MT | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
TR | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
GB | 29.08.2020 | ||
IE | 29.08.2020 | ||
LU | 29.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
FR | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/38] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
GB | 29.08.2020 | ||
IE | 29.08.2020 | ||
LU | 29.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
FR | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/37] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
IE | 29.08.2020 | ||
LU | 29.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
FR | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/36] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
LU | 29.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
FR | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/35] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
LU | 29.08.2020 | ||
CH | 31.08.2020 | ||
FR | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/24] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
LU | 29.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/20] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
LU | 29.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/18] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/10] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/09] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/08] | AL | 08.04.2020 | |
DK | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/04] | AL | 08.04.2020 | |
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/01] | FI | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/51] | FI | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/50] | FI | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
SE | 08.04.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/48] | FI | 08.04.2020 | |
LT | 08.04.2020 | ||
NL | 08.04.2020 | ||
SE | 08.04.2020 | ||
NO | 08.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/47] | LT | 08.04.2020 | |
NO | 08.07.2020 | ||
IS | 08.08.2020 | ||
Former [2020/46] | IS | 08.08.2020 | Documents cited: | Search | [XAY]JP3064404B (MATSUSHITA ELECTRIC IND CO LTD) [X] 1,8,12,15 * page 3 - page 3; figures 1,2; claim 1 * [A] 4-7,9-11,13,16 [Y] 2,3; | [XA]US2002031279 (SHIMIZU KOJI [JP]) [X] 1,2,4,5,9,10,13,14 * paragraph [0134] - paragraph [0155]; figures 1-4,9 *[A] 3,6,8,11,12,15,16; | [XAYI]JP2005286171 (MATSUSHITA ELECTRIC IND CO LTD) [X] 1,4,5,7,8,10-15 * paragraph [0049] - paragraph [0106]; figures 1,2,4,7-9,26 * [A] 6,16 [Y] 2,3 [I] 9 | International search | [XA]JPH04188898 (MATSUSHITA ELECTRIC IND CO LTD) [X] 1, 3, 8-10, 12-15 * , entire text; all drawings (Family: none) * [A] 2, 4-7, 11, 16; | [XA]JP2001300881 (JUKI KK) [X] 1, 3, 8-11, 13-15 * , entire text; all drawings (Family: none) *[A] 2, 4-7, 12, 16 |