blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3188582

EP3188582 - WORKING HEAD UNIT, MOUNTING DEVICE, AND METHOD FOR CONTROLLING WORKING HEAD UNIT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.02.2021
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  06.03.2020
FormerGrant of patent is intended
Status updated on  10.12.2019
FormerExamination is in progress
Status updated on  02.02.2019
FormerRequest for examination was made
Status updated on  02.06.2017
FormerThe international publication has been made
Status updated on  17.02.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
FUJI Corporation
19 Chausuyama
Yamamachi
Chiryu
Aichi / JP
[2018/43]
Former [2017/27]For all designated states
Fuji Machine Mfg. Co., Ltd.
19, Chausuyama
Yamamachi
Chiryu-shi, Aichi 472-8686 / JP
Inventor(s)01 / MAEDA, Fumitaka
c/o FUJI Corporation
19 Chausuyama
Yamamachi
Chiryu Aichi / JP
02 / ITO, Hidetoshi
c/o FUJI Corporation
19 Chausuyama
Yamamachi
Chiryu Aichi / JP
 [2019/07]
Former [2017/27]01 / MAEDA, Fumitaka
c/o FUJI MACHINE MFG. CO. LTD.
19 Chausuyama
Yamamachi
Chiryu-shi Aichi 472-8686 / JP
02 / ITO, Hidetoshi
c/o FUJI MACHINE MFG. CO. LTD.
19 Chausuyama
Yamamachi
Chiryu-shi Aichi 472-8686 / JP
Representative(s)Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstraße 4
80802 München / DE
[2017/27]
Application number, filing date14900735.329.08.2014
[2017/27]
WO2014JP72750
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016031053
Date:03.03.2016
Language:JA
[2016/09]
Type: A1 Application with search report 
No.:EP3188582
Date:05.07.2017
Language:EN
[2017/27]
Type: B1 Patent specification 
No.:EP3188582
Date:08.04.2020
Language:EN
[2020/15]
Search report(s)International search report - published on:JP03.03.2016
(Supplementary) European search report - dispatched on:EP02.08.2017
ClassificationIPC:H05K13/04, H05K13/08, H05K13/00, G05B19/402, G05D3/12
[2020/01]
CPC:
H05K13/0413 (EP,US); H05K13/046 (US); G05B19/402 (EP,US);
H05K13/041 (EP,US); G05B2219/37175 (EP,US); G05B2219/37263 (EP,US);
Y10T29/49133 (US); Y10T29/53174 (US) (-)
Former IPC [2017/35]H05K13/04, H05K13/00, H05K13/08, G05D3/12
Former IPC [2017/27]H05K13/04
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/27]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:ARBEITSKOPFEINHEIT, MONTAGEVORRICHTUNG UND VERFAHREN ZUR STEUERUNG DER ARBEITSKOPFEINHEIT[2017/27]
English:WORKING HEAD UNIT, MOUNTING DEVICE, AND METHOD FOR CONTROLLING WORKING HEAD UNIT[2017/27]
French:UNITÉ DE TÊTE DE TRAVAIL, DISPOSITIF DE MONTAGE ET PROCÉDÉ DE COMMANDE D'UNITÉ DE TÊTE DE TRAVAIL[2017/27]
Entry into regional phase16.02.2017Translation filed 
16.02.2017National basic fee paid 
16.02.2017Search fee paid 
16.02.2017Designation fee(s) paid 
16.02.2017Examination fee paid 
Examination procedure16.02.2017Examination requested  [2017/27]
16.02.2017Date on which the examining division has become responsible
28.02.2018Amendment by applicant (claims and/or description)
06.02.2019Despatch of a communication from the examining division (Time limit: M04)
06.06.2019Reply to a communication from the examining division
11.12.2019Communication of intention to grant the patent
27.02.2020Fee for grant paid
27.02.2020Fee for publishing/printing paid
27.02.2020Receipt of the translation of the claim(s)
Opposition(s)12.01.2021No opposition filed within time limit [2021/11]
Fees paidRenewal fee
16.02.2017Renewal fee patent year 03
14.08.2017Renewal fee patent year 04
10.08.2018Renewal fee patent year 05
15.08.2019Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU29.08.2014
AL08.04.2020
AT08.04.2020
CY08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
MK08.04.2020
MT08.04.2020
NL08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
TR08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
GB29.08.2020
IE29.08.2020
LU29.08.2020
BE31.08.2020
CH31.08.2020
FR31.08.2020
LI31.08.2020
[2022/32]
Former [2022/27]HU29.08.2014
AL08.04.2020
AT08.04.2020
CY08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
MT08.04.2020
NL08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
TR08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
GB29.08.2020
IE29.08.2020
LU29.08.2020
BE31.08.2020
CH31.08.2020
FR31.08.2020
LI31.08.2020
Former [2021/38]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
NL08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
GB29.08.2020
IE29.08.2020
LU29.08.2020
BE31.08.2020
CH31.08.2020
FR31.08.2020
LI31.08.2020
Former [2021/37]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
NL08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
IE29.08.2020
LU29.08.2020
BE31.08.2020
CH31.08.2020
FR31.08.2020
LI31.08.2020
Former [2021/36]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
NL08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
LU29.08.2020
BE31.08.2020
CH31.08.2020
FR31.08.2020
LI31.08.2020
Former [2021/35]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
NL08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
LU29.08.2020
CH31.08.2020
FR31.08.2020
LI31.08.2020
Former [2021/24]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
NL08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
LU29.08.2020
CH31.08.2020
LI31.08.2020
Former [2021/20]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
NL08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
LU29.08.2020
CH31.08.2020
LI31.08.2020
Former [2021/18]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
NL08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/10]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
NL08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/09]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
NL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/08]AL08.04.2020
DK08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
NL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/04]AL08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
NL08.04.2020
RS08.04.2020
SE08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/01]FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
NL08.04.2020
RS08.04.2020
SE08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/51]FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
NL08.04.2020
RS08.04.2020
SE08.04.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/50]FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
NL08.04.2020
SE08.04.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/48]FI08.04.2020
LT08.04.2020
NL08.04.2020
SE08.04.2020
NO08.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/47]LT08.04.2020
NO08.07.2020
IS08.08.2020
Former [2020/46]IS08.08.2020
Documents cited:Search[XAY]JP3064404B  (MATSUSHITA ELECTRIC IND CO LTD) [X] 1,8,12,15 * page 3 - page 3; figures 1,2; claim 1 * [A] 4-7,9-11,13,16 [Y] 2,3;
 [XA]US2002031279  (SHIMIZU KOJI [JP]) [X] 1,2,4,5,9,10,13,14 * paragraph [0134] - paragraph [0155]; figures 1-4,9 *[A] 3,6,8,11,12,15,16;
 [XAYI]JP2005286171  (MATSUSHITA ELECTRIC IND CO LTD) [X] 1,4,5,7,8,10-15 * paragraph [0049] - paragraph [0106]; figures 1,2,4,7-9,26 * [A] 6,16 [Y] 2,3 [I] 9
International search[XA]JPH04188898  (MATSUSHITA ELECTRIC IND CO LTD) [X] 1, 3, 8-10, 12-15 * , entire text; all drawings (Family: none) * [A] 2, 4-7, 11, 16;
 [XA]JP2001300881  (JUKI KK) [X] 1, 3, 8-11, 13-15 * , entire text; all drawings (Family: none) *[A] 2, 4-7, 12, 16
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.