EP3206435 - DATA FRAME TRANSMISSION METHOD AND APPARATUS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.06.2022 Database last updated on 20.07.2024 | |
Former | The patent has been granted Status updated on 25.06.2021 | ||
Former | Grant of patent is intended Status updated on 15.03.2021 | ||
Former | Examination is in progress Status updated on 20.07.2018 | ||
Former | Request for examination was made Status updated on 14.07.2017 | ||
Former | The international publication has been made Status updated on 10.05.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2017/33] | Inventor(s) | 01 /
WANG, Jian Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | [2017/33] | Representative(s) | Maiwald GmbH Elisenhof Elisenstraße 3 80335 München / DE | [N/P] |
Former [2021/30] | Maiwald Patent- und Rechtsanwaltsgesellschaft mbH Elisenhof Elisenstraße 3 80335 München / DE | ||
Former [2017/33] | Maiwald Patentanwalts GmbH Engineering Elisenhof Elisenstrasse 3 80335 München / DE | Application number, filing date | 14905174.0 | 29.10.2014 | [2017/33] | WO2014CN89789 | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016065553 | Date: | 06.05.2016 | Language: | ZH | [2016/18] | Type: | A1 Application with search report | No.: | EP3206435 | Date: | 16.08.2017 | Language: | EN | [2017/33] | Type: | B1 Patent specification | No.: | EP3206435 | Date: | 28.07.2021 | Language: | EN | [2021/30] | Search report(s) | International search report - published on: | CN | 06.05.2016 | (Supplementary) European search report - dispatched on: | EP | 25.09.2017 | Classification | IPC: | H04W56/00, H04W16/14, // H04W24/08 | [2021/11] | CPC: |
H04W56/001 (EP,US);
H04W40/02 (KR,US);
H04W24/10 (US);
H04W56/00 (KR);
H04W72/0446 (US);
H04W24/08 (EP,US);
|
Former IPC [2017/43] | H04W40/02, H04W16/14, // H04W24/08 | ||
Former IPC [2017/33] | H04W40/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/33] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | DATENRAHMENÜBERTRAGUNGSVERFAHREN UND -VORRICHTUNG | [2017/33] | English: | DATA FRAME TRANSMISSION METHOD AND APPARATUS | [2017/33] | French: | PROCÉDÉ ET APPAREIL DE TRANSMISSION DE TRAMES DE DONNÉES | [2017/33] | Entry into regional phase | 09.05.2017 | Translation filed | 09.05.2017 | National basic fee paid | 09.05.2017 | Search fee paid | 09.05.2017 | Designation fee(s) paid | 09.05.2017 | Examination fee paid | Examination procedure | 09.05.2017 | Examination requested [2017/33] | 09.05.2017 | Date on which the examining division has become responsible | 14.03.2018 | Amendment by applicant (claims and/or description) | 20.07.2018 | Despatch of a communication from the examining division (Time limit: M04) | 08.11.2018 | Reply to a communication from the examining division | 08.04.2019 | Despatch of a communication from the examining division (Time limit: M04) | 07.08.2019 | Reply to a communication from the examining division | 26.05.2020 | Despatch of a communication from the examining division (Time limit: M04) | 28.07.2020 | Reply to a communication from the examining division | 16.03.2021 | Communication of intention to grant the patent | 10.06.2021 | Receipt of the translation of the claim(s) | 17.06.2021 | Fee for grant paid | 17.06.2021 | Fee for publishing/printing paid | Opposition(s) | 29.04.2022 | No opposition filed within time limit [2022/27] | Fees paid | Renewal fee | 09.05.2017 | Renewal fee patent year 03 | 31.10.2017 | Renewal fee patent year 04 | 10.10.2018 | Renewal fee patent year 05 | 25.10.2019 | Renewal fee patent year 06 | 30.10.2020 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.10.2014 | AL | 28.07.2021 | AT | 28.07.2021 | CY | 28.07.2021 | CZ | 28.07.2021 | DK | 28.07.2021 | EE | 28.07.2021 | ES | 28.07.2021 | FI | 28.07.2021 | HR | 28.07.2021 | IT | 28.07.2021 | LT | 28.07.2021 | LV | 28.07.2021 | MC | 28.07.2021 | MK | 28.07.2021 | NL | 28.07.2021 | PL | 28.07.2021 | RO | 28.07.2021 | RS | 28.07.2021 | SE | 28.07.2021 | SI | 28.07.2021 | SK | 28.07.2021 | SM | 28.07.2021 | BG | 28.10.2021 | NO | 28.10.2021 | GR | 29.10.2021 | IE | 29.10.2021 | LU | 29.10.2021 | BE | 31.10.2021 | CH | 31.10.2021 | FR | 31.10.2021 | LI | 31.10.2021 | IS | 28.11.2021 | PT | 29.11.2021 | [2024/22] |
Former [2023/30] | HU | 29.10.2014 | |
AL | 28.07.2021 | ||
AT | 28.07.2021 | ||
CY | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IE | 29.10.2021 | ||
LU | 29.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2023/27] | HU | 29.10.2014 | |
AL | 28.07.2021 | ||
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IE | 29.10.2021 | ||
LU | 29.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/48] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IE | 29.10.2021 | ||
LU | 29.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/41] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
LU | 29.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/37] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
LU | 29.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/36] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
LU | 29.10.2021 | ||
BE | 31.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/35] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
LU | 29.10.2021 | ||
BE | 31.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/33] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
BE | 31.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/29] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/26] | AT | 28.07.2021 | |
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/24] | AT | 28.07.2021 | |
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SK | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/21] | AT | 28.07.2021 | |
DK | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/11] | AT | 28.07.2021 | |
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/09] | AT | 28.07.2021 | |
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
LT | 28.07.2021 | ||
NL | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
PT | 29.11.2021 | ||
Former [2022/08] | AT | 28.07.2021 | |
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
LT | 28.07.2021 | ||
NL | 28.07.2021 | ||
SE | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
Former [2022/07] | AT | 28.07.2021 | |
LT | 28.07.2021 | ||
NL | 28.07.2021 | ||
NO | 28.10.2021 | Documents cited: | Search | [XI]WO2013131257 (RENESAS MOBILE CORP [JP], et al) [X] 1,2,5,6,9,10,13,14 * pages 2,3,9,13 * * pages 17,18,28 * * pages 32,33; figures 1,7,8 * [I] 3,4,7,8,11,12,15; | [X]US2012230250 (KASSLIN MIKA [FI], et al) [X] 1,5,9,13 * paragraphs [0070] , [0232]; figures 1,4C *; | [I]US8280380 (KIM JUN-HYUNG [KR], et al) [I] 1,5,9,13 * page 7, line 44 - line 50; claim 1; tables 1, 4 * | International search | [A]CN104054375 (NOKIA CORP) [A] 1-39 * description, paragraphs [0001], [0068], [0098], [0104], [0112], [0130] and [0131] *; | [A]CN103069882 (ERICSSON TELEFON AB L M) [A] 1-39 * the whole document *; | [A]WO2013179095 (NOKIA CORP [FI], et al) [A] 1-39 * the whole document *; | [A]US2011299511 (COOK CHARLES I [US]) [A] 1-39 * the whole document * | Examination | WO2016004279 |