blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3230064

EP3230064 - A MULTILAYER STRUCTURE, A LAMINATE COMPRISING THE SAME AND ARTICLES COMPRISING THE LAMINATE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  02.07.2021
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  24.07.2020
FormerGrant of patent is intended
Status updated on  15.03.2020
FormerExamination is in progress
Status updated on  02.12.2019
FormerRequest for examination was made
Status updated on  15.09.2017
FormerThe international publication has been made
Status updated on  07.07.2017
Most recent event   Tooltip22.07.2022Lapse of the patent in a contracting state
New state(s): BE
published on 24.08.2022  [2022/34]
Applicant(s)For all designated states
Dow Global Technologies LLC
2040 Dow Center
Midland, MI 48674 / US
[2017/42]
Inventor(s)01 / YUN, Xiao B.
Room 101 Unit 2 Bldg. 3 Lecheng Apartment
South Road 2
Baiziwang
Chaoyang District
Beijing 100022 / CN
02 / PAN, Jianping
Room 501 No. 3 Lane 418 Mudan Rd.
Pudong
Shanghai 201204 / CN
 [2017/42]
Representative(s)Boult Wade Tennant LLP
Salisbury Square House
8 Salisbury Square
London EC4Y 8AP / GB
[2020/35]
Former [2017/42]Boult Wade Tennant
Verulam Gardens
70 Gray's Inn Road
London WC1X 8BT / GB
Application number, filing date14907628.312.12.2014
[2017/42]
WO2014CN93708
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016090633
Date:16.06.2016
Language:EN
[2016/24]
Type: A1 Application with search report 
No.:EP3230064
Date:18.10.2017
Language:EN
The application published by WIPO in one of the EPO official languages on 16.06.2016 takes the place of the publication of the European patent application.
[2017/42]
Type: B1 Patent specification 
No.:EP3230064
Date:26.08.2020
Language:EN
[2020/35]
Search report(s)International search report - published on:CN16.06.2016
(Supplementary) European search report - dispatched on:EP29.05.2018
ClassificationIPC:B32B27/32
[2017/42]
CPC:
B32B7/02 (EP,US); B32B27/08 (EP,US); B32B27/306 (EP,US);
B32B27/308 (EP,US); B32B27/32 (EP,US); B32B27/34 (EP,US);
B32B27/36 (EP,US); B32B7/12 (EP,US); B65D65/40 (US);
B65D85/72 (US); B32B2250/24 (EP,US); B32B2307/31 (EP,US);
B32B2307/406 (EP,US); B32B2307/412 (EP,US); B32B2307/514 (EP,US);
B32B2307/518 (EP,US); B32B2307/546 (EP,US); B32B2307/558 (EP,US);
B32B2307/704 (EP,US); B32B2307/72 (EP,US); B32B2439/70 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/42]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:MEHRSCHICHTIGE STRUKTUR, LAMINAT DAMIT UND ARTIKEL MIT DEM LAMINAT[2017/42]
English:A MULTILAYER STRUCTURE, A LAMINATE COMPRISING THE SAME AND ARTICLES COMPRISING THE LAMINATE[2017/42]
French:STRUCTURE MULTICOUCHE, STRATIFIÉ LA COMPRENANT ET ARTICLES COMPRENANT LE STRATIFIÉ[2017/42]
Entry into regional phase06.07.2017National basic fee paid 
06.07.2017Search fee paid 
06.07.2017Designation fee(s) paid 
06.07.2017Examination fee paid 
Examination procedure06.07.2017Examination requested  [2017/42]
06.07.2017Date on which the examining division has become responsible
18.12.2018Amendment by applicant (claims and/or description)
02.12.2019Despatch of a communication from the examining division (Time limit: M02)
27.01.2020Reply to a communication from the examining division
16.03.2020Communication of intention to grant the patent
20.07.2020Fee for grant paid
20.07.2020Fee for publishing/printing paid
20.07.2020Receipt of the translation of the claim(s)
Opposition(s)27.05.2021No opposition filed within time limit [2021/31]
Fees paidRenewal fee
31.05.2017Renewal fee patent year 03
12.12.2017Renewal fee patent year 04
12.12.2018Renewal fee patent year 05
13.12.2019Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU12.12.2014
AL26.08.2020
AT26.08.2020
CY26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
MK26.08.2020
MT26.08.2020
NL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
TR26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IE12.12.2020
LU12.12.2020
IS26.12.2020
PT28.12.2020
BE31.12.2020
CH31.12.2020
LI31.12.2020
[2022/34]
Former [2022/32]HU12.12.2014
AL26.08.2020
AT26.08.2020
CY26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
MK26.08.2020
MT26.08.2020
NL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
TR26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IE12.12.2020
LU12.12.2020
IS26.12.2020
PT28.12.2020
CH31.12.2020
LI31.12.2020
Former [2022/27]HU12.12.2014
AL26.08.2020
AT26.08.2020
CY26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
MT26.08.2020
NL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
TR26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IE12.12.2020
LU12.12.2020
IS26.12.2020
PT28.12.2020
CH31.12.2020
LI31.12.2020
Former [2021/52]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IE12.12.2020
LU12.12.2020
IS26.12.2020
PT28.12.2020
CH31.12.2020
LI31.12.2020
Former [2021/47]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IE12.12.2020
LU12.12.2020
IS26.12.2020
PT28.12.2020
Former [2021/46]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IE12.12.2020
IS26.12.2020
PT28.12.2020
Former [2021/40]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/36]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/28]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/25]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/23]AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/22]CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/21]DK26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/12]FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/10]FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/09]FI26.08.2020
LT26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
PT28.12.2020
Former [2021/08]FI26.08.2020
LT26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
PT28.12.2020
Former [2021/07]FI26.08.2020
LT26.08.2020
NO26.11.2020
Documents cited:Search[X]US5279872  (RALPH DONALD J [US]) [X] 1* abstract *;
 [X]US7498282  (PATEL RAJEN M [US], et al) [X] 1-15 * abstract * * columns 47-52 *;
 [XI]WO2010009202  (DOW GLOBAL TECHNOLOGIES INC [US], et al) [X] 1 * abstract * * pages 21-27 * [I] 2-15
International search[A]US5279872  (RALPH DONALD J [US]) [A] 1-16 * example 1 *;
 [A]US2006216471  (GRAH MICHAEL D [US], et al) [A] 1-16 * examples *;
 [A]WO2007085380  (CRYOVAC INC [US], et al) [A] 1-16 * claim 1 *;
 [A]WO2010008696  (EXXONMOBIL OIL CORP [US], et al) [A] 1-16 * claims *;
 [A]CN102190824  (JIANGSU CAIHUA PACKAGING GROUP COMPANY, et al) [A] 1-16 * paragraphs [0068]-[0078] *;
 [A]CN104385748  (HAINAN SHINER IND CO LTD) [A] 1-16* paragraphs [0033]-[0037] *
by applicantUS5279872
 US7498282
 WO2010009202
 US2011015346
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.