EP3201418 - DRILLING TOOL BEARING AND DRIVETRAIN ASSEMBLY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.02.2021 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 06.03.2020 | ||
Former | Grant of patent is intended Status updated on 02.12.2019 | ||
Former | Examination is in progress Status updated on 18.03.2019 | ||
Former | Request for examination was made Status updated on 07.07.2017 | ||
Former | The international publication has been made Status updated on 05.04.2017 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): BE | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Halliburton Energy Services, Inc. 3000 N. Sam Houston Parkway E. Houston, TX 77032 / US | [2017/32] | Inventor(s) | 01 /
SAVAGE, John Keith 712 173 Street SW Edmonton, Alberta T6W 0M4 / CA | 02 /
BELL, Steven Graham 195 Ackerman Crescent Red Deer, Alberta T4R 3B8 / CA | [2017/32] | Representative(s) | Bennett, Adrian Robert J., et al AA Thornton IP LLP 8th Floor, 125 Old Broad Street London EC2N 1AR / GB | [N/P] |
Former [2017/32] | Bennett, Adrian Robert J., et al A.A. Thornton & Co. 10 Old Bailey London EC4M 7NG / GB | Application number, filing date | 14907780.2 | 12.12.2014 | [2017/32] | WO2014US69978 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016093857 | Date: | 16.06.2016 | Language: | EN | [2016/24] | Type: | A1 Application with search report | No.: | EP3201418 | Date: | 09.08.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 16.06.2016 takes the place of the publication of the European patent application. | [2017/32] | Type: | B1 Patent specification | No.: | EP3201418 | Date: | 08.04.2020 | Language: | EN | [2020/15] | Search report(s) | International search report - published on: | KR | 16.06.2016 | (Supplementary) European search report - dispatched on: | EP | 11.04.2018 | Classification | IPC: | E21B4/02, E21B4/10, E21B7/00 | [2017/32] | CPC: |
E21B4/02 (EP,RU,US);
E21B4/003 (EP,RU,US);
E21B44/00 (US);
F03C2/22 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/32] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | BOHRWERKZEUGLAGER UND ANTRIEBSSTRANGANORDNUNG | [2017/32] | English: | DRILLING TOOL BEARING AND DRIVETRAIN ASSEMBLY | [2017/32] | French: | ENSEMBLE PALIERS ET TRANSMISSION D'UN OUTIL DE FORAGE | [2017/32] | Entry into regional phase | 03.05.2017 | National basic fee paid | 03.05.2017 | Search fee paid | 03.05.2017 | Designation fee(s) paid | 03.05.2017 | Examination fee paid | Examination procedure | 05.04.2017 | Date on which the examining division has become responsible | 03.05.2017 | Examination requested [2017/32] | 05.10.2018 | Amendment by applicant (claims and/or description) | 21.03.2019 | Despatch of a communication from the examining division (Time limit: M04) | 03.06.2019 | Reply to a communication from the examining division | 10.07.2019 | Despatch of a communication from the examining division (Time limit: M04) | 15.10.2019 | Reply to a communication from the examining division | 03.12.2019 | Communication of intention to grant the patent | 28.02.2020 | Fee for grant paid | 28.02.2020 | Fee for publishing/printing paid | 28.02.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 12.01.2021 | No opposition filed within time limit [2021/11] | Fees paid | Renewal fee | 03.05.2017 | Renewal fee patent year 03 | 16.10.2017 | Renewal fee patent year 04 | 10.10.2018 | Renewal fee patent year 05 | 10.10.2019 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.12.2014 | AL | 08.04.2020 | AT | 08.04.2020 | CY | 08.04.2020 | CZ | 08.04.2020 | DK | 08.04.2020 | EE | 08.04.2020 | ES | 08.04.2020 | FI | 08.04.2020 | HR | 08.04.2020 | IT | 08.04.2020 | LT | 08.04.2020 | LV | 08.04.2020 | MC | 08.04.2020 | MK | 08.04.2020 | MT | 08.04.2020 | NL | 08.04.2020 | PL | 08.04.2020 | RO | 08.04.2020 | RS | 08.04.2020 | SE | 08.04.2020 | SI | 08.04.2020 | SK | 08.04.2020 | SM | 08.04.2020 | TR | 08.04.2020 | BG | 08.07.2020 | GR | 09.07.2020 | IS | 08.08.2020 | PT | 17.08.2020 | IE | 12.12.2020 | LU | 12.12.2020 | BE | 31.12.2020 | CH | 31.12.2020 | FR | 31.12.2020 | LI | 31.12.2020 | [2022/33] |
Former [2022/32] | HU | 12.12.2014 | |
AL | 08.04.2020 | ||
AT | 08.04.2020 | ||
CY | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
MK | 08.04.2020 | ||
MT | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
TR | 08.04.2020 | ||
BG | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
IE | 12.12.2020 | ||
LU | 12.12.2020 | ||
CH | 31.12.2020 | ||
FR | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2022/27] | HU | 12.12.2014 | |
AL | 08.04.2020 | ||
AT | 08.04.2020 | ||
CY | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
MT | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
TR | 08.04.2020 | ||
BG | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
IE | 12.12.2020 | ||
LU | 12.12.2020 | ||
CH | 31.12.2020 | ||
FR | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2021/52] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
IE | 12.12.2020 | ||
LU | 12.12.2020 | ||
CH | 31.12.2020 | ||
FR | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2021/48] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
IE | 12.12.2020 | ||
LU | 12.12.2020 | ||
FR | 31.12.2020 | ||
Former [2021/47] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
IE | 12.12.2020 | ||
LU | 12.12.2020 | ||
Former [2021/46] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
IE | 12.12.2020 | ||
Former [2021/40] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/24] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/10] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/09] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/08] | AL | 08.04.2020 | |
DK | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/04] | AL | 08.04.2020 | |
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
BG | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/01] | FI | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
BG | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/51] | FI | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/50] | FI | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
SE | 08.04.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/48] | FI | 08.04.2020 | |
LT | 08.04.2020 | ||
NL | 08.04.2020 | ||
SE | 08.04.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/47] | LT | 08.04.2020 | |
IS | 08.08.2020 | ||
Former [2020/46] | IS | 08.08.2020 | Documents cited: | Search | [A]US5248204 (LIVINGSTON RAYMOND S [CA], et al) [A] 1-15 * abstract *; | [XI]US2013299243 (VON GYNZ-REKOWSKI GUNTHER HH [US], et al) [X] 1,2,8,9,12 * paragraphs [0001] - [0006] - [0042] - [0060]; figure - * [I] 3-7,10,11,13-15; | [A]US2013313022 (KIRKHOPE KENNEDY J [CA], et al) [A] 1-15* the whole document *; | [XI]WO2014098899 (HALLIBURTON ENERGY SERVICES INC [US]) [X] 1,2,8,9,12 * the whole document * [I] 3-7,10,11,13-15 | International search | [A]US2002074167 (PLOP ANDREI [US]) [A] 1-20 * See abstract, paragraphs [0024]-[0030] and figures 4, 5. *; | [A]US2006086536 (BOYLE BRUCE W [GB], et al) [A] 1-20 * See abstract, paragraphs [0024]-[0028] and figure 1. *; | [A]US2013277116 (KNULL CRAIG [US], et al) [A] 1-20* See abstract, paragraphs [0032]-[0035] and figure 1. *; | [XY]WO2014098899 (HALLIBURTON ENERGY SERVICES INC [US]) [X] 1, 8-11, 15-18, 20 * See abstract, paragraphs [0017]-[0023], claim 13 and figures 1, 2. * [Y] 2-7, 12-14, 19; | [Y]US2014332275 (MURRAY WILLIAM [US], et al) [Y] 2-7, 12-14, 19 * See abstract, paragraphs [0035]-[0037] and figures 3-6. * | by applicant | WO2014098899 | US2014332275 |