EP3239956 - COLLISION AVOIDANCE SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 31.12.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 22.01.2021 | ||
Former | Grant of patent is intended Status updated on 12.10.2020 | ||
Former | Request for examination was made Status updated on 29.09.2017 | ||
Former | The international publication has been made Status updated on 25.07.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states The Yokohama Rubber Co., Ltd. 36-11 Shimbashi 5-chome Minato-ku Tokyo 105-8685 / JP | [N/P] |
Former [2017/44] | For all designated states The Yokohama Rubber Co., Ltd. 36-11 Shimbashi 5-chome Minato-ku Tokyo 105-8685 / JP | Inventor(s) | 01 /
KODAMA, Yuji c/o The Yokohama Rubber Co. LTD. Hiratsuka Factory 2-1 Oiwake Hiratsuka-shi Kanagawa 254-8601 / JP | 02 /
NAKATANI, Koji c/o The Yokohama Rubber Co. LTD. Hiratsuka Factory 2-1 Oiwake Hiratsuka-shi Kanagawa 254-8601 / JP | [2017/44] | Representative(s) | Dilg, Haeusler, Schindelmann Patentanwaltsgesellschaft mbH Leonrodstraße 58 80636 München / DE | [2021/08] |
Former [2017/44] | Dilg, Haeusler, Schindelmann Patentanwaltsgesellschaft mbH Leonrodstrasse 58 80636 München / DE | Application number, filing date | 14909063.1 | 26.12.2014 | [2017/44] | WO2014JP84562 | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016103459 | Date: | 30.06.2016 | Language: | JA | [2016/26] | Type: | A1 Application with search report | No.: | EP3239956 | Date: | 01.11.2017 | Language: | EN | [2017/44] | Type: | B1 Patent specification | No.: | EP3239956 | Date: | 24.02.2021 | Language: | EN | [2021/08] | Search report(s) | International search report - published on: | JP | 30.06.2016 | (Supplementary) European search report - dispatched on: | EP | 13.08.2018 | Classification | IPC: | G08G1/16, B60C19/00, B60C23/04, B60R21/00, B60T7/12, G08G1/00, G08G1/01, G08G1/09, G08G1/0967 | [2018/37] | CPC: |
G08G1/166 (EP,US);
B60C19/00 (EP,US);
B60C23/04 (EP,US);
B60C23/06 (US);
B60Q9/008 (US);
B60R21/00 (EP,US);
B60T7/12 (EP,US);
G08G1/01 (US);
G08G1/09 (US);
G08G1/0967 (EP,US);
G08G1/096733 (EP,US);
G08G1/096791 (EP,US);
|
Former IPC [2017/44] | G08G1/16, B60C19/00, B60C23/04, B60R21/00, B60T7/12, G08G1/00, G08G1/01, G08G1/09 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/44] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | KOLLISIONSVERMEIDUNGSSYSTEM | [2017/44] | English: | COLLISION AVOIDANCE SYSTEM | [2017/44] | French: | SYSTÈME D'ÉVITEMENT DE COLLISION | [2017/44] | Entry into regional phase | 24.07.2017 | Translation filed | 24.07.2017 | National basic fee paid | 24.07.2017 | Search fee paid | 24.07.2017 | Designation fee(s) paid | 24.07.2017 | Examination fee paid | Examination procedure | 24.07.2017 | Examination requested [2017/44] | 24.07.2017 | Date on which the examining division has become responsible | 06.03.2019 | Amendment by applicant (claims and/or description) | 13.10.2020 | Communication of intention to grant the patent | 19.01.2021 | Fee for grant paid | 19.01.2021 | Fee for publishing/printing paid | 19.01.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 25.11.2021 | No opposition filed within time limit [2022/05] | Fees paid | Renewal fee | 24.07.2017 | Renewal fee patent year 03 | 12.12.2017 | Renewal fee patent year 04 | 12.12.2018 | Renewal fee patent year 05 | 13.12.2019 | Renewal fee patent year 06 | 14.12.2020 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.12.2014 | AL | 24.02.2021 | AT | 24.02.2021 | CY | 24.02.2021 | CZ | 24.02.2021 | DK | 24.02.2021 | EE | 24.02.2021 | ES | 24.02.2021 | FI | 24.02.2021 | HR | 24.02.2021 | IT | 24.02.2021 | LT | 24.02.2021 | LV | 24.02.2021 | MC | 24.02.2021 | MK | 24.02.2021 | MT | 24.02.2021 | NL | 24.02.2021 | PL | 24.02.2021 | RO | 24.02.2021 | RS | 24.02.2021 | SE | 24.02.2021 | SI | 24.02.2021 | SK | 24.02.2021 | SM | 24.02.2021 | TR | 24.02.2021 | BG | 24.05.2021 | NO | 24.05.2021 | GR | 25.05.2021 | IS | 24.06.2021 | PT | 24.06.2021 | [2024/41] |
Former [2024/29] | HU | 26.12.2014 | |
AL | 24.02.2021 | ||
AT | 24.02.2021 | ||
CY | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
MK | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
TR | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2024/22] | HU | 26.12.2014 | |
AL | 24.02.2021 | ||
AT | 24.02.2021 | ||
CY | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
MK | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2023/30] | HU | 26.12.2014 | |
AL | 24.02.2021 | ||
AT | 24.02.2021 | ||
CY | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2023/29] | HU | 26.12.2014 | |
AL | 24.02.2021 | ||
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2022/33] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2022/23] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2022/13] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2022/10] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2022/08] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2022/07] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/50] | AT | 24.02.2021 | |
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/49] | AT | 24.02.2021 | |
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/48] | AT | 24.02.2021 | |
CZ | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/46] | AT | 24.02.2021 | |
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/42] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/39] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/38] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/37] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
RS | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/36] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/35] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
NO | 24.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/33] | FI | 24.02.2021 | |
LT | 24.02.2021 | ||
NO | 24.05.2021 | ||
PT | 24.06.2021 | Documents cited: | Search | [YA]US2014302774 (BURKE DENIS [US], et al) [Y] 1-8 * abstract * * paragraphs [0002] , [0031] , [0037] , [0043] , [0046] , [0058] , [0069] , [0070] , [0104] * [A] 9,10; | [Y]US2010198455 (HOTTA NOBUYUKI [JP], et al) [Y] 1-4 * abstract * * paragraphs [0012] - [0017] - [0020] , [0078] - [0080] *; | [Y]JP2006232031 (BRIDGESTONE CORP) [Y] 1,2,5,6 * abstract * * paragraphs [0004] - [0007] - [0019] - [0021] - [0029] - [0032] - [0045] , [0047] *; | [Y]JP2008065753 (KOMATSU MFG CO LTD) [Y] 7,8 * abstract * * paragraphs [0045] , [0046] *; | [YA]JP2013109746 (SUMITOMO ELECTRIC INDUSTRIES) [Y] 1,2 * abstract * * paragraphs [0011] , [0012] , [0020] , [0021] , [0104] , [0105] * [A] 3-10 | International search | [YA]JP2013109746 (SUMITOMO ELECTRIC INDUSTRIES) [Y] 1-2, 5-8 * , paragraphs [0026] to [0063], [0095] to [0109]; fig. 2 (Family: none) * [A] 3-4, 9-10; | [Y]JP2006023862 (DENSO CORP) [Y] 1-2, 5-8 * , paragraphs [0083] to [0086] (Family: none) *; | [Y]JP2008065753 (KOMATSU MFG CO LTD) [Y] 5-8 * , paragraphs [0026] to [0046] (Family: none) *; | [A]JP2009090718 (DENSO CORP) [A] 1-10 * , entire text; all drawings (Family: none) *; | [A]JP2009294791 (DENSO CORP) [A] 1-10 * , entire text; all drawings & US 2009/0295558 A1 *; | [A]JP2011180934 (RICOH CO LTD) [A] 9-10 * , entire text; all drawings (Family: none) *; | [A]JP2004224227 (NISSAN MOTOR) [A] 9-10 * , entire text; all drawings (Family: none) * |