EP3241399 - TIMING A RANDOM ACCESS OF UE TO RELAY AP [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.04.2020 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 03.05.2019 | ||
Former | Grant of patent is intended Status updated on 01.04.2019 | ||
Former | Request for examination was made Status updated on 06.10.2017 | ||
Former | The international publication has been made Status updated on 26.05.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [2017/45] | Inventor(s) | 01 /
GUO, Zhiheng No. 5 Lize East Street Chaoyang District Beijing 100102 / CN | 02 /
FAN, Rui 711-1-501 Beijing Olympic Garden Chaoyang District Beijing 100018 / CN | 03 /
LU, Qianxi Wangjingxiyuan Building No.132-1 Room 503 Chaoyang District Beijing 100102 / CN | 04 /
MIAO, Qingyu Room 1301 Building 22 No. 102 Youyi Road, Haidian District Beijing 100094 / CN | [2017/45] | Representative(s) | Zacco Sweden AB P.O. Box 5581 Löjtnantsgatan 21 114 85 Stockholm / SE | [N/P] |
Former [2019/23] | Zacco Sweden AB Valhallavägen 117 Box 5581 114 85 Stockholm / SE | ||
Former [2017/45] | Haseltine Lake LLP Redcliff Quay 120 Redcliff Street Bristol BS1 6HU / GB | Application number, filing date | 14909485.6 | 31.12.2014 | [2017/45] | WO2014CN95882 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016106676 | Date: | 07.07.2016 | Language: | EN | [2016/27] | Type: | A1 Application with search report | No.: | EP3241399 | Date: | 08.11.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 07.07.2016 takes the place of the publication of the European patent application. | [2017/45] | Type: | B1 Patent specification | No.: | EP3241399 | Date: | 05.06.2019 | Language: | EN | [2019/23] | Search report(s) | International search report - published on: | CN | 07.07.2016 | (Supplementary) European search report - dispatched on: | EP | 18.07.2018 | Classification | IPC: | H04B7/15, H04W56/00 | [2018/33] | CPC: |
H04B7/155 (EP,US);
H04W56/0045 (EP,US);
H04W74/08 (EP,US);
H04W84/047 (EP,US);
H04W92/12 (EP,US)
|
Former IPC [2017/45] | H04W74/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/45] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ZEITLICHE KOORDINATION EINES ZUFALLSZUGRIFFES EINES BENUTZERGERÄTS AUF RELAY-AP | [2017/45] | English: | TIMING A RANDOM ACCESS OF UE TO RELAY AP | [2017/45] | French: | CHRONOMÉTRAGE D'UN ACCÈS ALÉATOIRE D'UN ÉQUIPEMENT UTILISATEUR (UE) À UN POINT D'ACCÈS (AP) DE RELAIS | [2017/45] | Entry into regional phase | 26.05.2017 | National basic fee paid | 26.05.2017 | Search fee paid | 26.05.2017 | Designation fee(s) paid | 26.05.2017 | Examination fee paid | Examination procedure | 26.05.2017 | Examination requested [2017/45] | 26.05.2017 | Date on which the examining division has become responsible | 08.01.2019 | Amendment by applicant (claims and/or description) | 02.04.2019 | Communication of intention to grant the patent | 23.04.2019 | Fee for grant paid | 23.04.2019 | Fee for publishing/printing paid | 23.04.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 06.03.2020 | No opposition filed within time limit [2020/20] | Fees paid | Renewal fee | 30.06.2017 | Renewal fee patent year 03 | 27.12.2017 | Renewal fee patent year 04 | 31.12.2018 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 31.12.2014 | AL | 05.06.2019 | AT | 05.06.2019 | CY | 05.06.2019 | CZ | 05.06.2019 | DK | 05.06.2019 | EE | 05.06.2019 | ES | 05.06.2019 | FI | 05.06.2019 | HR | 05.06.2019 | IT | 05.06.2019 | LT | 05.06.2019 | LV | 05.06.2019 | MC | 05.06.2019 | MK | 05.06.2019 | MT | 05.06.2019 | NL | 05.06.2019 | PL | 05.06.2019 | RO | 05.06.2019 | RS | 05.06.2019 | SE | 05.06.2019 | SI | 05.06.2019 | SK | 05.06.2019 | SM | 05.06.2019 | TR | 05.06.2019 | BG | 05.09.2019 | NO | 05.09.2019 | GR | 06.09.2019 | IS | 05.10.2019 | PT | 07.10.2019 | BE | 31.12.2019 | CH | 31.12.2019 | FR | 31.12.2019 | IE | 31.12.2019 | LI | 31.12.2019 | LU | 31.12.2019 | [2022/31] |
Former [2021/34] | HU | 31.12.2014 | |
AL | 05.06.2019 | ||
AT | 05.06.2019 | ||
CY | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
MT | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
FR | 31.12.2019 | ||
IE | 31.12.2019 | ||
LI | 31.12.2019 | ||
LU | 31.12.2019 | ||
Former [2021/33] | HU | 31.12.2014 | |
AL | 05.06.2019 | ||
AT | 05.06.2019 | ||
CY | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
FR | 31.12.2019 | ||
IE | 31.12.2019 | ||
LI | 31.12.2019 | ||
LU | 31.12.2019 | ||
Former [2021/26] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CY | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
FR | 31.12.2019 | ||
IE | 31.12.2019 | ||
LI | 31.12.2019 | ||
LU | 31.12.2019 | ||
Former [2020/51] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
FR | 31.12.2019 | ||
IE | 31.12.2019 | ||
LI | 31.12.2019 | ||
LU | 31.12.2019 | ||
Former [2020/49] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
FR | 31.12.2019 | ||
IE | 31.12.2019 | ||
LU | 31.12.2019 | ||
Former [2020/46] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
IE | 31.12.2019 | ||
LU | 31.12.2019 | ||
Former [2020/39] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/25] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/22] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/17] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/13] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/12] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/11] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
PT | 07.10.2019 | ||
Former [2020/10] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
PT | 07.10.2019 | ||
Former [2020/09] | AL | 05.06.2019 | |
CZ | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
Former [2020/07] | AL | 05.06.2019 | |
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
Former [2019/51] | AL | 05.06.2019 | |
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
Former [2019/50] | AL | 05.06.2019 | |
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
Former [2019/49] | AL | 05.06.2019 | |
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
SE | 05.06.2019 | ||
NO | 05.09.2019 | ||
Former [2019/48] | ES | 05.06.2019 | |
FI | 05.06.2019 | ||
LT | 05.06.2019 | ||
SE | 05.06.2019 | ||
NO | 05.09.2019 | ||
Former [2019/47] | ES | 05.06.2019 | |
FI | 05.06.2019 | ||
LT | 05.06.2019 | ||
NO | 05.09.2019 | Documents cited: | Search | [IA]US2010222068 (GAAL PETER [US], et al) [I] 1-3,5,6,9,11,12 * paragraphs [0076] - [0078] - [0 82] - [0083]; figures 7, 10 * [A] 4,7,8,10,13,14; | [IA] - LG ELECTRONICS INC, "Further Consideration on Timing Alignment", 3GPP DRAFT; R1-100229 FURTHER CONSIDERATION ON TIMING ALIGNMENT_LGE, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20100112), vol. RAN WG1, no. Valencia, Spain; 20100118, XP050417919 [I] 1-3,5,6,9,11,12 * paragraphs [0001] - [0004]; figure 1 * [A] 4,7,8,10,13,14 | [IA] - MITSUBISHI ELECTRIC, "Guard periods and timing for backhauling in Type 1 relays", 3GPP DRAFT; R1-101457, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20100216), vol. RAN WG1, no. San Francisco, USA; 20100222, XP050418918 [I] 1-3,5-7,9-14 * paragraphs [0001] - [0003]; figures 1-4 * [A] 4,8 | [IA] - LG ELECTRONICS INC, "Guard time handling in backhaul link design", 3GPP DRAFT; R1-092494 GUARD TIME HANDLING IN BACKHAUL LINK DESIGN_FINAL, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090623), no. Los Angeles, USA; 20090623, XP050351001 [I] 1-3,5-7,9-14 * paragraphs [0001] , [00 3]; figure 5 * [A] 4,8 | International search | [A]CN101416556 (ERICSSON TELEFON AB L M [SE]) [A] 1-19 * the whole document *; | [A]WO2012119626 (PANASONIC CORP [JP], et al) [A] 1-19* the whole document *; | [A]CN102724766 (SHANGHAI ULTIMATE POWER COMM) [A] 1-19 * the whole document *; | [A]US2014301375 (NUSAIRAT ASHRAF [US], et al) [A] 1-19 * see description, paragraphs [0015] to [0076] and figures 1-6 * |