EP2939966 - DOCKING EQUIPMENT WITH RETRACTABLE BUMPERS, PRODUCTION METHOD [Right-click to bookmark this link] | |||
Former [2015/45] | DOCK DEVICE WITH RETRACTABLE BUMPERS, METHOD FOR MANUFACTURING SAME | ||
[2016/08] | Status | No opposition filed within time limit Status updated on 28.07.2017 Database last updated on 14.06.2024 | Most recent event Tooltip | 19.06.2020 | Lapse of the patent in a contracting state New state(s): HR | published on 22.07.2020 [2020/30] | Applicant(s) | For all designated states Roere, Michel 1 rue du Pont 67720 Weyersheim / FR | [2015/45] | Inventor(s) | 01 /
see applicant ... | [2015/45] | Representative(s) | Munier, Laurent Cabinet Laurent Munier Avocat 18 rue de Stockholm 67000 Strasbourg / FR | [N/P] |
Former [2015/45] | Munier, Laurent Cabinet Laurent MUNIER 20 rue de Stockholm 67000 Strasbourg / FR | Application number, filing date | 15001183.1 | 21.04.2015 | [2015/45] | Priority number, date | FR20140001019 | 02.05.2014 Original published format: FR 1401019 | [2015/45] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP2939966 | Date: | 04.11.2015 | Language: | FR | [2015/45] | Type: | B1 Patent specification | No.: | EP2939966 | Date: | 21.09.2016 | Language: | FR | [2016/38] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 11.08.2015 | Classification | IPC: | B65G69/00, B65G69/28 | [2015/45] | CPC: |
B65G69/001 (EP);
B65G69/2882 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/19] |
Former [2015/45] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERLADEANLAGE MIT VERSENKBAREN ANSCHLÄGEN, HERSTELLUNGSVERFAHREN | [2015/45] | English: | DOCKING EQUIPMENT WITH RETRACTABLE BUMPERS, PRODUCTION METHOD | [2016/08] | French: | ÉQUIPEMENT D'ACCOSTAGE DE QUAI À BUTOIRS ESCAMOTABLES, PROCÉDÉ DE RÉALISATION | [2016/08] |
Former [2015/45] | DOCK DEVICE WITH RETRACTABLE BUMPERS, METHOD FOR MANUFACTURING SAME | ||
Former [2015/45] | ÉQUIPEMENT DE QUAI À BUTOIRS ESCAMOTABLES, PROCÉDÉ DE RÉALISATION | Examination procedure | 21.12.2015 | Examination requested [2016/04] | 01.02.2016 | Communication of intention to grant the patent | 31.05.2016 | Fee for grant paid | 31.05.2016 | Fee for publishing/printing paid | 02.06.2016 | Receipt of the translation of the claim(s) | Opposition(s) | 22.06.2017 | No opposition filed within time limit [2017/35] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.04.2015 | AL | 21.09.2016 | AT | 21.09.2016 | CY | 21.09.2016 | CZ | 21.09.2016 | DK | 21.09.2016 | EE | 21.09.2016 | ES | 21.09.2016 | FI | 21.09.2016 | HR | 21.09.2016 | IT | 21.09.2016 | LT | 21.09.2016 | LV | 21.09.2016 | MC | 21.09.2016 | MK | 21.09.2016 | MT | 21.09.2016 | NL | 21.09.2016 | PL | 21.09.2016 | RO | 21.09.2016 | RS | 21.09.2016 | SE | 21.09.2016 | SI | 21.09.2016 | SK | 21.09.2016 | SM | 21.09.2016 | TR | 21.09.2016 | BG | 21.12.2016 | NO | 21.12.2016 | GR | 22.12.2016 | IS | 21.01.2017 | PT | 23.01.2017 | IE | 21.04.2017 | [2020/30] |
Former [2020/15] | HU | 21.04.2015 | |
AL | 21.09.2016 | ||
AT | 21.09.2016 | ||
CY | 21.09.2016 | ||
CZ | 21.09.2016 | ||
DK | 21.09.2016 | ||
EE | 21.09.2016 | ||
ES | 21.09.2016 | ||
FI | 21.09.2016 | ||
IT | 21.09.2016 | ||
LT | 21.09.2016 | ||
LV | 21.09.2016 | ||
MC | 21.09.2016 | ||
MK | 21.09.2016 | ||
MT | 21.09.2016 | ||
NL | 21.09.2016 | ||
PL | 21.09.2016 | ||
RO | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
SI | 21.09.2016 | ||
SK | 21.09.2016 | ||
SM | 21.09.2016 | ||
TR | 21.09.2016 | ||
BG | 21.12.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
IS | 21.01.2017 | ||
PT | 23.01.2017 | ||
IE | 21.04.2017 | ||
Former [2019/52] | HU | 21.04.2015 | |
AL | 21.09.2016 | ||
AT | 21.09.2016 | ||
CY | 21.09.2016 | ||
CZ | 21.09.2016 | ||
DK | 21.09.2016 | ||
EE | 21.09.2016 | ||
ES | 21.09.2016 | ||
FI | 21.09.2016 | ||
IT | 21.09.2016 | ||
LT | 21.09.2016 | ||
LV | 21.09.2016 | ||
MC | 21.09.2016 | ||
MK | 21.09.2016 | ||
MT | 21.09.2016 | ||
NL | 21.09.2016 | ||
PL | 21.09.2016 | ||
RO | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
SI | 21.09.2016 | ||
SK | 21.09.2016 | ||
SM | 21.09.2016 | ||
BG | 21.12.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
IS | 21.01.2017 | ||
PT | 23.01.2017 | ||
IE | 21.04.2017 | ||
Former [2019/48] | HU | 21.04.2015 | |
AL | 21.09.2016 | ||
AT | 21.09.2016 | ||
CY | 21.09.2016 | ||
CZ | 21.09.2016 | ||
DK | 21.09.2016 | ||
EE | 21.09.2016 | ||
ES | 21.09.2016 | ||
FI | 21.09.2016 | ||
IT | 21.09.2016 | ||
LT | 21.09.2016 | ||
LV | 21.09.2016 | ||
MC | 21.09.2016 | ||
MT | 21.09.2016 | ||
NL | 21.09.2016 | ||
PL | 21.09.2016 | ||
RO | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
SI | 21.09.2016 | ||
SK | 21.09.2016 | ||
SM | 21.09.2016 | ||
BG | 21.12.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
IS | 21.01.2017 | ||
PT | 23.01.2017 | ||
IE | 21.04.2017 | ||
Former [2019/31] | HU | 21.04.2015 | |
AL | 21.09.2016 | ||
AT | 21.09.2016 | ||
CZ | 21.09.2016 | ||
DK | 21.09.2016 | ||
EE | 21.09.2016 | ||
ES | 21.09.2016 | ||
FI | 21.09.2016 | ||
IT | 21.09.2016 | ||
LT | 21.09.2016 | ||
LV | 21.09.2016 | ||
MC | 21.09.2016 | ||
MT | 21.09.2016 | ||
NL | 21.09.2016 | ||
PL | 21.09.2016 | ||
RO | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
SI | 21.09.2016 | ||
SK | 21.09.2016 | ||
SM | 21.09.2016 | ||
BG | 21.12.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
IS | 21.01.2017 | ||
PT | 23.01.2017 | ||
IE | 21.04.2017 | ||
Former [2018/47] | AL | 21.09.2016 | |
AT | 21.09.2016 | ||
CZ | 21.09.2016 | ||
DK | 21.09.2016 | ||
EE | 21.09.2016 | ||
ES | 21.09.2016 | ||
FI | 21.09.2016 | ||
IT | 21.09.2016 | ||
LT | 21.09.2016 | ||
LV | 21.09.2016 | ||
MC | 21.09.2016 | ||
MT | 21.09.2016 | ||
NL | 21.09.2016 | ||
PL | 21.09.2016 | ||
RO | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
SI | 21.09.2016 | ||
SK | 21.09.2016 | ||
SM | 21.09.2016 | ||
BG | 21.12.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
IS | 21.01.2017 | ||
PT | 23.01.2017 | ||
IE | 21.04.2017 | ||
Former [2018/43] | AT | 21.09.2016 | |
CZ | 21.09.2016 | ||
DK | 21.09.2016 | ||
EE | 21.09.2016 | ||
ES | 21.09.2016 | ||
FI | 21.09.2016 | ||
IT | 21.09.2016 | ||
LT | 21.09.2016 | ||
LV | 21.09.2016 | ||
MC | 21.09.2016 | ||
MT | 21.09.2016 | ||
NL | 21.09.2016 | ||
PL | 21.09.2016 | ||
RO | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
SI | 21.09.2016 | ||
SK | 21.09.2016 | ||
SM | 21.09.2016 | ||
BG | 21.12.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
IS | 21.01.2017 | ||
PT | 23.01.2017 | ||
IE | 21.04.2017 | ||
Former [2018/23] | AT | 21.09.2016 | |
CZ | 21.09.2016 | ||
DK | 21.09.2016 | ||
EE | 21.09.2016 | ||
ES | 21.09.2016 | ||
FI | 21.09.2016 | ||
IT | 21.09.2016 | ||
LT | 21.09.2016 | ||
LV | 21.09.2016 | ||
MC | 21.09.2016 | ||
NL | 21.09.2016 | ||
PL | 21.09.2016 | ||
RO | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
SI | 21.09.2016 | ||
SK | 21.09.2016 | ||
SM | 21.09.2016 | ||
BG | 21.12.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
IS | 21.01.2017 | ||
PT | 23.01.2017 | ||
IE | 21.04.2017 | ||
Former [2018/06] | AT | 21.09.2016 | |
CZ | 21.09.2016 | ||
DK | 21.09.2016 | ||
EE | 21.09.2016 | ||
ES | 21.09.2016 | ||
FI | 21.09.2016 | ||
IT | 21.09.2016 | ||
LT | 21.09.2016 | ||
LV | 21.09.2016 | ||
MC | 21.09.2016 | ||
NL | 21.09.2016 | ||
PL | 21.09.2016 | ||
RO | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
SI | 21.09.2016 | ||
SK | 21.09.2016 | ||
SM | 21.09.2016 | ||
BG | 21.12.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
IS | 21.01.2017 | ||
PT | 23.01.2017 | ||
Former [2017/52] | AT | 21.09.2016 | |
CZ | 21.09.2016 | ||
DK | 21.09.2016 | ||
EE | 21.09.2016 | ||
ES | 21.09.2016 | ||
FI | 21.09.2016 | ||
IT | 21.09.2016 | ||
LT | 21.09.2016 | ||
LV | 21.09.2016 | ||
NL | 21.09.2016 | ||
PL | 21.09.2016 | ||
RO | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
SI | 21.09.2016 | ||
SK | 21.09.2016 | ||
SM | 21.09.2016 | ||
BG | 21.12.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
IS | 21.01.2017 | ||
PT | 23.01.2017 | ||
Former [2017/34] | AT | 21.09.2016 | |
CZ | 21.09.2016 | ||
DK | 21.09.2016 | ||
EE | 21.09.2016 | ||
ES | 21.09.2016 | ||
FI | 21.09.2016 | ||
IT | 21.09.2016 | ||
LT | 21.09.2016 | ||
LV | 21.09.2016 | ||
NL | 21.09.2016 | ||
PL | 21.09.2016 | ||
RO | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
SK | 21.09.2016 | ||
SM | 21.09.2016 | ||
BG | 21.12.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
IS | 21.01.2017 | ||
PT | 23.01.2017 | ||
Former [2017/32] | AT | 21.09.2016 | |
CZ | 21.09.2016 | ||
EE | 21.09.2016 | ||
ES | 21.09.2016 | ||
FI | 21.09.2016 | ||
IT | 21.09.2016 | ||
LT | 21.09.2016 | ||
LV | 21.09.2016 | ||
NL | 21.09.2016 | ||
PL | 21.09.2016 | ||
RO | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
SK | 21.09.2016 | ||
SM | 21.09.2016 | ||
BG | 21.12.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
IS | 21.01.2017 | ||
PT | 23.01.2017 | ||
Former [2017/13] | FI | 21.09.2016 | |
LT | 21.09.2016 | ||
LV | 21.09.2016 | ||
NL | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
Former [2017/11] | FI | 21.09.2016 | |
LT | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
Former [2017/10] | FI | 21.09.2016 | |
LT | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
NO | 21.12.2016 | ||
Former [2017/09] | FI | 21.09.2016 | |
LT | 21.09.2016 | ||
NO | 21.12.2016 | ||
Former [2017/07] | LT | 21.09.2016 | Documents cited: | Search | [A]EP1445222 (GRUNEWALD NICLAS [DE]) [A] 1,5 * column 5, line 26 - column 7, line 36 * * figures 1-11 *; | [A]WO2013036606 (DL MFG [US], et al) [A] 1,2 * the whole document *; | [A]US2006137261 (MALY PAUL J [US]) [A] 1,5 * page 2, paragraph 43 - page 3, paragraph 44 * * figure 6 * | by applicant | FR2890949 |