EP2955349 - METHOD FOR OPERATING A COMBUSTION ENGINE AND EXHAUST GAS AFTERTREATMENT DEVICE OF SUCH COMBUSTION ENGINE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.12.2017 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 30.12.2016 | ||
Former | Grant of patent is intended Status updated on 28.11.2016 | ||
Former | Request for examination was made Status updated on 18.11.2016 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states GE Jenbacher GmbH & Co OG Achenseestrasse 1-3 6200 Jenbach / AT | [2016/51] |
Former [2015/51] | For all designated states GE Jenbacher GmbH & Co. OG Achenseestrasse 1-3 6200 Jenbach / AT | Inventor(s) | 01 /
Hillen, Friedhelm Bräupark 2 6200 Jenbach / AT | 02 /
Bhuvaneswaran, Manickam Bienerstrasse 84 Top 22 6240 Rattenberg / AT | 03 /
Bienholz, Arne Goethestrasse 48 64285 Darmstadt / DE | [2015/51] | Representative(s) | Torggler & Hofmann Patentanwälte - Innsbruck Torggler & Hofmann Patentanwälte GmbH & Co KG Postfach 85 6020 Innsbruck / AT | [N/P] |
Former [2017/05] | Torggler & Hofinger Patentanwälte Postfach 85 6010 Innsbruck / AT | ||
Former [2015/51] | Gangl, Markus, et al Torggler & Hofinger Patentanwälte Wilhelm-Greil-Straße 16 6020 Innsbruck / AT | Application number, filing date | 15001582.4 | 26.05.2015 | [2015/51] | Priority number, date | AT20140000467 | 12.06.2014 Original published format: AT 4672014 | [2015/51] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP2955349 | Date: | 16.12.2015 | Language: | DE | [2015/51] | Type: | B1 Patent specification | No.: | EP2955349 | Date: | 01.02.2017 | Language: | DE | [2017/05] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 10.11.2015 | Classification | IPC: | F01N3/20, F01N9/00, // F01N3/10 | [2015/51] | CPC: |
F01N3/20 (EP,US);
F01N3/103 (EP,AT,US);
F01N3/0835 (US);
F01N3/18 (AT);
F01N3/2033 (EP,US);
F01N3/2053 (EP,US);
F01N3/36 (AT);
F01N9/00 (EP,US);
F01N2240/14 (EP,US);
F01N2260/04 (EP,US);
F01N2260/10 (EP,US);
F01N2340/06 (EP,US);
F01N2410/02 (EP,US);
F01N2560/023 (EP,US);
F01N2560/06 (EP,US);
F01N2560/14 (EP,US);
F01N2590/10 (EP,US);
F01N2610/03 (EP,US);
F01N2610/06 (EP,US);
F01N2900/1402 (EP,US);
F01N2900/1404 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/22] |
Former [2015/51] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUM BETREIBEN EINER VERBRENNUNGSKRAFTMASCHINE UND ABGASNACHBEHANDLUNGSEINRICHTUNG EINER SOLCHEN VERBRENNUNGSKRAFTMASCHINE | [2015/51] | English: | METHOD FOR OPERATING A COMBUSTION ENGINE AND EXHAUST GAS AFTERTREATMENT DEVICE OF SUCH COMBUSTION ENGINE | [2015/51] | French: | PROCÉDÉ DE FONCTIONNEMENT D'UN MOTEUR À COMBUSTION INTERNE ET DISPOSITIF DE POST-TRAITEMENT D'UN TEL MOTEUR | [2015/51] | Examination procedure | 25.04.2016 | Amendment by applicant (claims and/or description) | 25.04.2016 | Examination requested [2016/22] | 13.09.2016 | Communication of intention to grant the patent | 17.11.2016 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 17.11.2016 | Fee for grant paid | 17.11.2016 | Fee for publishing/printing paid | 06.12.2016 | Communication of intention to grant the patent | 15.12.2016 | Receipt of the translation of the claim(s) | Opposition(s) | 03.11.2017 | No opposition filed within time limit [2018/02] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.05.2015 | AL | 01.02.2017 | CY | 01.02.2017 | CZ | 01.02.2017 | DK | 01.02.2017 | EE | 01.02.2017 | ES | 01.02.2017 | FI | 01.02.2017 | HR | 01.02.2017 | IT | 01.02.2017 | LT | 01.02.2017 | LV | 01.02.2017 | MC | 01.02.2017 | MK | 01.02.2017 | MT | 01.02.2017 | NL | 01.02.2017 | PL | 01.02.2017 | RO | 01.02.2017 | RS | 01.02.2017 | SE | 01.02.2017 | SI | 01.02.2017 | SK | 01.02.2017 | SM | 01.02.2017 | TR | 01.02.2017 | BG | 01.05.2017 | NO | 01.05.2017 | GR | 02.05.2017 | IE | 26.05.2017 | LU | 26.05.2017 | BE | 31.05.2017 | FR | 31.05.2017 | IS | 01.06.2017 | PT | 01.06.2017 | [2020/34] |
Former [2020/15] | HU | 26.05.2015 | |
CY | 01.02.2017 | ||
CZ | 01.02.2017 | ||
DK | 01.02.2017 | ||
EE | 01.02.2017 | ||
ES | 01.02.2017 | ||
FI | 01.02.2017 | ||
HR | 01.02.2017 | ||
IT | 01.02.2017 | ||
LT | 01.02.2017 | ||
LV | 01.02.2017 | ||
MC | 01.02.2017 | ||
MK | 01.02.2017 | ||
MT | 01.02.2017 | ||
NL | 01.02.2017 | ||
PL | 01.02.2017 | ||
RO | 01.02.2017 | ||
RS | 01.02.2017 | ||
SE | 01.02.2017 | ||
SI | 01.02.2017 | ||
SK | 01.02.2017 | ||
SM | 01.02.2017 | ||
TR | 01.02.2017 | ||
BG | 01.05.2017 | ||
NO | 01.05.2017 | ||
GR | 02.05.2017 | ||
IE | 26.05.2017 | ||
LU | 26.05.2017 | ||
BE | 31.05.2017 | ||
FR | 31.05.2017 | ||
IS | 01.06.2017 | ||
PT | 01.06.2017 | ||
Former [2019/52] | HU | 26.05.2015 | |
CY | 01.02.2017 | ||
CZ | 01.02.2017 | ||
DK | 01.02.2017 | ||
EE | 01.02.2017 | ||
ES | 01.02.2017 | ||
FI | 01.02.2017 | ||
HR | 01.02.2017 | ||
IT | 01.02.2017 | ||
LT | 01.02.2017 | ||
LV | 01.02.2017 | ||
MC | 01.02.2017 | ||
MK | 01.02.2017 | ||
MT | 01.02.2017 | ||
NL | 01.02.2017 | ||
PL | 01.02.2017 | ||
RO | 01.02.2017 | ||
RS | 01.02.2017 | ||
SE | 01.02.2017 | ||
SI | 01.02.2017 | ||
SK | 01.02.2017 | ||
SM | 01.02.2017 | ||
BG | 01.05.2017 | ||
NO | 01.05.2017 | ||
GR | 02.05.2017 | ||
IE | 26.05.2017 | ||
LU | 26.05.2017 | ||
BE | 31.05.2017 | ||
FR | 31.05.2017 | ||
IS | 01.06.2017 | ||
PT | 01.06.2017 | ||
Former [2019/48] | HU | 26.05.2015 | |
CY | 01.02.2017 | ||
CZ | 01.02.2017 | ||
DK | 01.02.2017 | ||
EE | 01.02.2017 | ||
ES | 01.02.2017 | ||
FI | 01.02.2017 | ||
HR | 01.02.2017 | ||
IT | 01.02.2017 | ||
LT | 01.02.2017 | ||
LV | 01.02.2017 | ||
MC | 01.02.2017 | ||
MT | 01.02.2017 | ||
NL | 01.02.2017 | ||
PL | 01.02.2017 | ||
RO | 01.02.2017 | ||
RS | 01.02.2017 | ||
SE | 01.02.2017 | ||
SI | 01.02.2017 | ||
SK | 01.02.2017 | ||
SM | 01.02.2017 | ||
BG | 01.05.2017 | ||
NO | 01.05.2017 | ||
GR | 02.05.2017 | ||
IE | 26.05.2017 | ||
LU | 26.05.2017 | ||
BE | 31.05.2017 | ||
FR | 31.05.2017 | ||
IS | 01.06.2017 | ||
PT | 01.06.2017 | ||
Former [2019/31] | HU | 26.05.2015 | |
CZ | 01.02.2017 | ||
DK | 01.02.2017 | ||
EE | 01.02.2017 | ||
ES | 01.02.2017 | ||
FI | 01.02.2017 | ||
HR | 01.02.2017 | ||
IT | 01.02.2017 | ||
LT | 01.02.2017 | ||
LV | 01.02.2017 | ||
MC | 01.02.2017 | ||
MT | 01.02.2017 | ||
NL | 01.02.2017 | ||
PL | 01.02.2017 | ||
RO | 01.02.2017 | ||
RS | 01.02.2017 | ||
SE | 01.02.2017 | ||
SI | 01.02.2017 | ||
SK | 01.02.2017 | ||
SM | 01.02.2017 | ||
BG | 01.05.2017 | ||
NO | 01.05.2017 | ||
GR | 02.05.2017 | ||
IE | 26.05.2017 | ||
LU | 26.05.2017 | ||
BE | 31.05.2017 | ||
FR | 31.05.2017 | ||
IS | 01.06.2017 | ||
PT | 01.06.2017 | ||
Former [2018/43] | CZ | 01.02.2017 | |
DK | 01.02.2017 | ||
EE | 01.02.2017 | ||
ES | 01.02.2017 | ||
FI | 01.02.2017 | ||
HR | 01.02.2017 | ||
IT | 01.02.2017 | ||
LT | 01.02.2017 | ||
LV | 01.02.2017 | ||
MC | 01.02.2017 | ||
MT | 01.02.2017 | ||
NL | 01.02.2017 | ||
PL | 01.02.2017 | ||
RO | 01.02.2017 | ||
RS | 01.02.2017 | ||
SE | 01.02.2017 | ||
SI | 01.02.2017 | ||
SK | 01.02.2017 | ||
SM | 01.02.2017 | ||
BG | 01.05.2017 | ||
NO | 01.05.2017 | ||
GR | 02.05.2017 | ||
IE | 26.05.2017 | ||
LU | 26.05.2017 | ||
BE | 31.05.2017 | ||
FR | 31.05.2017 | ||
IS | 01.06.2017 | ||
PT | 01.06.2017 | ||
Former [2018/39] | CZ | 01.02.2017 | |
DK | 01.02.2017 | ||
EE | 01.02.2017 | ||
ES | 01.02.2017 | ||
FI | 01.02.2017 | ||
HR | 01.02.2017 | ||
IT | 01.02.2017 | ||
LT | 01.02.2017 | ||
LV | 01.02.2017 | ||
MC | 01.02.2017 | ||
NL | 01.02.2017 | ||
PL | 01.02.2017 | ||
RO | 01.02.2017 | ||
RS | 01.02.2017 | ||
SE | 01.02.2017 | ||
SI | 01.02.2017 | ||
SK | 01.02.2017 | ||
SM | 01.02.2017 | ||
BG | 01.05.2017 | ||
NO | 01.05.2017 | ||
GR | 02.05.2017 | ||
IE | 26.05.2017 | ||
LU | 26.05.2017 | ||
BE | 31.05.2017 | ||
FR | 31.05.2017 | ||
IS | 01.06.2017 | ||
PT | 01.06.2017 | ||
Former [2018/29] | CZ | 01.02.2017 | |
DK | 01.02.2017 | ||
EE | 01.02.2017 | ||
ES | 01.02.2017 | ||
FI | 01.02.2017 | ||
HR | 01.02.2017 | ||
IT | 01.02.2017 | ||
LT | 01.02.2017 | ||
LV | 01.02.2017 | ||
MC | 01.02.2017 | ||
NL | 01.02.2017 | ||
PL | 01.02.2017 | ||
RO | 01.02.2017 | ||
RS | 01.02.2017 | ||
SE | 01.02.2017 | ||
SI | 01.02.2017 | ||
SK | 01.02.2017 | ||
SM | 01.02.2017 | ||
BG | 01.05.2017 | ||
NO | 01.05.2017 | ||
GR | 02.05.2017 | ||
IE | 26.05.2017 | ||
LU | 26.05.2017 | ||
FR | 31.05.2017 | ||
IS | 01.06.2017 | ||
PT | 01.06.2017 | ||
Former [2018/23] | CZ | 01.02.2017 | |
DK | 01.02.2017 | ||
EE | 01.02.2017 | ||
ES | 01.02.2017 | ||
FI | 01.02.2017 | ||
HR | 01.02.2017 | ||
IT | 01.02.2017 | ||
LT | 01.02.2017 | ||
LV | 01.02.2017 | ||
MC | 01.02.2017 | ||
NL | 01.02.2017 | ||
PL | 01.02.2017 | ||
RO | 01.02.2017 | ||
RS | 01.02.2017 | ||
SE | 01.02.2017 | ||
SI | 01.02.2017 | ||
SK | 01.02.2017 | ||
SM | 01.02.2017 | ||
BG | 01.05.2017 | ||
NO | 01.05.2017 | ||
GR | 02.05.2017 | ||
IE | 26.05.2017 | ||
LU | 26.05.2017 | ||
IS | 01.06.2017 | ||
PT | 01.06.2017 | ||
Former [2018/17] | CZ | 01.02.2017 | |
DK | 01.02.2017 | ||
EE | 01.02.2017 | ||
ES | 01.02.2017 | ||
FI | 01.02.2017 | ||
HR | 01.02.2017 | ||
IT | 01.02.2017 | ||
LT | 01.02.2017 | ||
LV | 01.02.2017 | ||
MC | 01.02.2017 | ||
NL | 01.02.2017 | ||
PL | 01.02.2017 | ||
RO | 01.02.2017 | ||
RS | 01.02.2017 | ||
SE | 01.02.2017 | ||
SI | 01.02.2017 | ||
SK | 01.02.2017 | ||
SM | 01.02.2017 | ||
BG | 01.05.2017 | ||
NO | 01.05.2017 | ||
GR | 02.05.2017 | ||
LU | 26.05.2017 | ||
IS | 01.06.2017 | ||
PT | 01.06.2017 | ||
Former [2018/14] | CZ | 01.02.2017 | |
DK | 01.02.2017 | ||
EE | 01.02.2017 | ||
ES | 01.02.2017 | ||
FI | 01.02.2017 | ||
HR | 01.02.2017 | ||
IT | 01.02.2017 | ||
LT | 01.02.2017 | ||
LV | 01.02.2017 | ||
MC | 01.02.2017 | ||
NL | 01.02.2017 | ||
PL | 01.02.2017 | ||
RO | 01.02.2017 | ||
RS | 01.02.2017 | ||
SE | 01.02.2017 | ||
SI | 01.02.2017 | ||
SK | 01.02.2017 | ||
SM | 01.02.2017 | ||
BG | 01.05.2017 | ||
NO | 01.05.2017 | ||
GR | 02.05.2017 | ||
LU | 31.05.2017 | ||
IS | 01.06.2017 | ||
PT | 01.06.2017 | ||
Former [2018/06] | CZ | 01.02.2017 | |
DK | 01.02.2017 | ||
EE | 01.02.2017 | ||
ES | 01.02.2017 | ||
FI | 01.02.2017 | ||
HR | 01.02.2017 | ||
IT | 01.02.2017 | ||
LT | 01.02.2017 | ||
LV | 01.02.2017 | ||
MC | 01.02.2017 | ||
NL | 01.02.2017 | ||
PL | 01.02.2017 | ||
RO | 01.02.2017 | ||
RS | 01.02.2017 | ||
SE | 01.02.2017 | ||
SK | 01.02.2017 | ||
SM | 01.02.2017 | ||
BG | 01.05.2017 | ||
NO | 01.05.2017 | ||
GR | 02.05.2017 | ||
LU | 31.05.2017 | ||
IS | 01.06.2017 | ||
PT | 01.06.2017 | ||
Former [2017/51] | CZ | 01.02.2017 | |
DK | 01.02.2017 | ||
EE | 01.02.2017 | ||
ES | 01.02.2017 | ||
FI | 01.02.2017 | ||
HR | 01.02.2017 | ||
IT | 01.02.2017 | ||
LT | 01.02.2017 | ||
LV | 01.02.2017 | ||
NL | 01.02.2017 | ||
PL | 01.02.2017 | ||
RO | 01.02.2017 | ||
RS | 01.02.2017 | ||
SE | 01.02.2017 | ||
SK | 01.02.2017 | ||
SM | 01.02.2017 | ||
BG | 01.05.2017 | ||
NO | 01.05.2017 | ||
GR | 02.05.2017 | ||
LU | 31.05.2017 | ||
IS | 01.06.2017 | ||
PT | 01.06.2017 | ||
Former [2017/50] | CZ | 01.02.2017 | |
DK | 01.02.2017 | ||
EE | 01.02.2017 | ||
ES | 01.02.2017 | ||
FI | 01.02.2017 | ||
HR | 01.02.2017 | ||
IT | 01.02.2017 | ||
LT | 01.02.2017 | ||
LV | 01.02.2017 | ||
NL | 01.02.2017 | ||
PL | 01.02.2017 | ||
RO | 01.02.2017 | ||
RS | 01.02.2017 | ||
SE | 01.02.2017 | ||
SK | 01.02.2017 | ||
BG | 01.05.2017 | ||
NO | 01.05.2017 | ||
GR | 02.05.2017 | ||
LU | 31.05.2017 | ||
IS | 01.06.2017 | ||
PT | 01.06.2017 | ||
Former [2017/49] | CZ | 01.02.2017 | |
EE | 01.02.2017 | ||
ES | 01.02.2017 | ||
FI | 01.02.2017 | ||
HR | 01.02.2017 | ||
IT | 01.02.2017 | ||
LT | 01.02.2017 | ||
LV | 01.02.2017 | ||
NL | 01.02.2017 | ||
PL | 01.02.2017 | ||
RO | 01.02.2017 | ||
RS | 01.02.2017 | ||
SE | 01.02.2017 | ||
SK | 01.02.2017 | ||
BG | 01.05.2017 | ||
NO | 01.05.2017 | ||
GR | 02.05.2017 | ||
LU | 31.05.2017 | ||
IS | 01.06.2017 | ||
PT | 01.06.2017 | ||
Former [2017/48] | CZ | 01.02.2017 | |
ES | 01.02.2017 | ||
FI | 01.02.2017 | ||
HR | 01.02.2017 | ||
LT | 01.02.2017 | ||
LV | 01.02.2017 | ||
NL | 01.02.2017 | ||
PL | 01.02.2017 | ||
RS | 01.02.2017 | ||
SE | 01.02.2017 | ||
BG | 01.05.2017 | ||
NO | 01.05.2017 | ||
GR | 02.05.2017 | ||
LU | 31.05.2017 | ||
IS | 01.06.2017 | ||
PT | 01.06.2017 | ||
Former [2017/41] | ES | 01.02.2017 | |
FI | 01.02.2017 | ||
HR | 01.02.2017 | ||
LT | 01.02.2017 | ||
LV | 01.02.2017 | ||
NL | 01.02.2017 | ||
PL | 01.02.2017 | ||
RS | 01.02.2017 | ||
SE | 01.02.2017 | ||
BG | 01.05.2017 | ||
NO | 01.05.2017 | ||
GR | 02.05.2017 | ||
LU | 31.05.2017 | ||
IS | 01.06.2017 | ||
PT | 01.06.2017 | Documents cited: | Search | [XAYI]US2003106306 (NAKATANI KOICHIRO [JP], et al) [X] 1,2 * figures 1,2 * * paragraph [0038] - paragraph [0040] * * paragraph [0043] * * paragraph [0048] * * paragraph [0051] * * paragraph [0057] - paragraph [0061] * [A] 3-8,11,14,15 [Y] 1,2,10,12,13,16 [I] 9; | [YA]CA2453689 (WESTPORT RES INC [CA]) [Y] 1,2,10,12,13,16 * figure 2 * * page 14, line 1 - page 15, line 18 * * page 29, lines 1-12 * [A] 3-9,11,14,15; | [YA]US2007220865 (CUNNINGHAM MICHAEL [US], et al) [Y] 1,2,10,12,13,16 * figures 3,5,6 * * paragraphs [0067] - [0068] * * paragraph [0070] - paragraph [0077] *[A] 3-9,11,14,15; | [YA]WO2012123634 (WAERTSILAE FINLAND OY [FI], et al) [Y] 1,2,10,12,13,16 * figure 1 * * page 6, line 1 - line 31 * * page 7, lines 22-25 * * page 8, lines 15-32 * [A] 3-9,11,14,15 | by applicant | EP1445439 | WO2012123636 |