blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3009051

EP3009051 - SUPPORT DEVICE ADJUSTABLE WITH AN ELECTRIC MOTOR [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  13.09.2019
Database last updated on 15.08.2024
FormerThe patent has been granted
Status updated on  05.10.2018
FormerGrant of patent is intended
Status updated on  24.05.2018
FormerExamination is in progress
Status updated on  09.12.2016
Most recent event   Tooltip01.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 03.08.2022  [2022/31]
Applicant(s)For all designated states
De Werth Group AG
Freigutstr. 5
8002 Zürich / CH
[2018/45]
Former [2016/16]For all designated states
De Werth Group AG
Freigutstr. 5
8002 Zürich / CH
Inventor(s)01 / Dewert, Eckhart
Schlossbüel
8638 Goldingen / CH
 [2016/16]
Representative(s)Wagner, Carsten, et al
Patentanwaltskanzlei
Am Buchenhof 3
31303 Burgdorf / DE
[2018/45]
Former [2016/16]Wagner, Carsten
Wagner Dr. Herrguth Patentanwälte Burckhardtstrasse 1
30163 Hannover / DE
Application number, filing date15002289.501.08.2015
[2016/16]
Priority number, dateDE20141011507516.10.2014         Original published format: DE102014115075
DE20151010699105.05.2015         Original published format: DE102015106991
[2016/16]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3009051
Date:20.04.2016
Language:DE
[2016/16]
Type: B1 Patent specification 
No.:EP3009051
Date:07.11.2018
Language:DE
[2018/45]
Search report(s)(Supplementary) European search report - dispatched on:EP10.03.2016
ClassificationIPC:A47C20/04
[2016/16]
CPC:
A47C17/16 (US); A47C20/041 (EP,US); A47C20/08 (CN);
H02K7/06 (CN)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/48]
Former [2016/16]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ELEKTROMOTORISCH VERSTELLBARE STÜTZEINRICHTUNG[2016/16]
English:SUPPORT DEVICE ADJUSTABLE WITH AN ELECTRIC MOTOR[2016/16]
French:DISPOSITIF D'APPUI RÉGLABLE À MOTEUR ÉLECTRIQUE[2016/16]
Examination procedure27.08.2015Examination requested  [2016/16]
11.10.2016Amendment by applicant (claims and/or description)
08.12.2016Despatch of a communication from the examining division (Time limit: M06)
13.06.2017Reply to a communication from the examining division
27.10.2017Despatch of a communication from the examining division (Time limit: M06)
03.05.2018Reply to a communication from the examining division
25.05.2018Communication of intention to grant the patent
24.09.2018Fee for grant paid
24.09.2018Fee for publishing/printing paid
24.09.2018Receipt of the translation of the claim(s)
Opposition(s)08.08.2019No opposition filed within time limit [2019/42]
Fees paidRenewal fee
31.08.2017Renewal fee patent year 03
31.08.2018Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU01.08.2015
AL07.11.2018
CY07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
MC07.11.2018
MK07.11.2018
MT07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
GB01.08.2019
IE01.08.2019
LU01.08.2019
[2022/31]
Former [2021/34]HU01.08.2015
AL07.11.2018
CY07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
MC07.11.2018
MT07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
GB01.08.2019
IE01.08.2019
LU01.08.2019
Former [2021/33]HU01.08.2015
AL07.11.2018
CY07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
MC07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
GB01.08.2019
IE01.08.2019
LU01.08.2019
Former [2021/26]AL07.11.2018
CY07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
MC07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
GB01.08.2019
IE01.08.2019
LU01.08.2019
Former [2020/37]AL07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
MC07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
GB01.08.2019
IE01.08.2019
LU01.08.2019
Former [2020/36]AL07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
MC07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
IE01.08.2019
LU01.08.2019
Former [2020/25]AL07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
MC07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
LU01.08.2019
Former [2020/17]AL07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/50]AL07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/40]AL07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SK07.11.2018
SM07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/37]AL07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SM07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/35]AL07.11.2018
CZ07.11.2018
DK07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
PL07.11.2018
RS07.11.2018
SE07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/34]AL07.11.2018
DK07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
RS07.11.2018
SE07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/26]AL07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
RS07.11.2018
SE07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/25]ES07.11.2018
FI07.11.2018
HR07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
RS07.11.2018
SE07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
Former [2019/24]ES07.11.2018
FI07.11.2018
HR07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
SE07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
Former [2019/23]ES07.11.2018
FI07.11.2018
HR07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
BG07.02.2019
NO07.02.2019
IS07.03.2019
Former [2019/22]FI07.11.2018
LT07.11.2018
BG07.02.2019
NO07.02.2019
IS07.03.2019
Former [2019/21]FI07.11.2018
LT07.11.2018
NO07.02.2019
IS07.03.2019
Former [2019/20]LT07.11.2018
NO07.02.2019
Documents cited:Search[X]WO9011748  (MOELNLYCKE AB [SE]) [X] 1-10 * figure -; claim - *;
 [XI]ES2156571  (BETERE FAB LUCIA ANTONIO [ES]) [X] 1-3,5-7,10 * column 3, lines 9-34; figure - * * column 4, lines 34-46 * [I] 4;
 [A]DE4336241  (VAUTH SAGEL GMBH & CO [DE]) [A] 1-10 * column 2, lines 59-62; figure -; claim - *;
 [A]DE4236195  (WISSNER GMBH [DE]) [A] 1-10 * abstract *;
 [A]DE20104961U  (FRANKE GMBH & CO KG [DE]) [A] 1-10 * figure - *;
 [A]CH688733  (MATRA AG [CH]) [A] 1-10 * figure - *
ExaminationDE202014000212U
by applicantEP0372032
 DE3842078
 DE10017978
 DE10017979
 DE3409223
 DE19843259
 EP1020171
 DE19729282
 DE29811566U
 DE29714746U
 DE3900384
 DE29602947U
 DE3103922
 EP1294255
 FR2727296
 GB2334435
 US5528948
 DE19962541
 EP1239755
 US6754922
 DE10046751
 EP1239754
 US6961971
 WO9629970
 DE69507158T
 EP0788325
 EP1633219
 WO2008113401
 DE102008028586
 DE202015100471U
 EP2792277
 JP20010546280
 JP20010547994
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.