blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3050682

EP3050682 - METHOD AND SYSTEM FOR OPERATING AND/OR MONITORING A MULTI-AXLE MACHINE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  21.08.2020
Database last updated on 22.08.2024
FormerThe patent has been granted
Status updated on  13.09.2019
FormerGrant of patent is intended
Status updated on  27.05.2019
FormerExamination is in progress
Status updated on  12.10.2018
FormerRequest for examination was made
Status updated on  14.04.2017
Most recent event   Tooltip01.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 03.08.2022  [2022/31]
Applicant(s)For all designated states
KUKA Deutschland GmbH
Zugspitzstraße 140
86165 Augsburg / DE
[2018/32]
Former [2016/31]For all designated states
KUKA Roboter GmbH
Zugspitzstrasse 140
86165 Augsburg / DE
Inventor(s)01 / Monreal, Karsten
Albert-Schweitzer-Str. 23
86391 Stadtbergen / DE
02 / Angeli, Carsten
Dr.-Otto-Meyer-Str. 42
86169 Augsburg / DE
 [2016/31]
Representative(s)Schlotter, Alexander Carolus Paul
Wallinger Ricker Schlotter Tostmann
Patent- und Rechtsanwälte Partnerschaft mbB
Zweibrückenstrasse 5-7
80331 München / DE
[2019/42]
Former [2016/31]Schlotter, Alexander Carolus Paul
Wallinger Ricker Schlotter Tostmann
Patent- und Rechtsanwälte
Zweibrückenstrasse 5-7
80331 München / DE
Application number, filing date15003447.803.12.2015
[2016/31]
Priority number, dateDE2015100120330.01.2015         Original published format: DE102015001203
[2016/31]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP3050682
Date:03.08.2016
Language:DE
[2016/31]
Type: A3 Search report 
No.:EP3050682
Date:02.11.2016
Language:DE
[2016/44]
Type: B1 Patent specification 
No.:EP3050682
Date:16.10.2019
Language:DE
[2019/42]
Search report(s)(Supplementary) European search report - dispatched on:EP05.10.2016
ClassificationIPC:B25J9/16
[2016/31]
CPC:
B25J9/1674 (EP,US); B25J9/1602 (CN); B25J19/02 (US);
B25J9/1651 (CN); F16D66/00 (US); G01L5/28 (US);
G05B2219/39097 (EP,US); G05B2219/39261 (CN) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/20]
Former [2016/31]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN UND SYSTEM ZUM BETREIBEN UND/ODER ÜBERWACHEN EINER MEHRACHSIGEN MASCHINE[2016/31]
English:METHOD AND SYSTEM FOR OPERATING AND/OR MONITORING A MULTI-AXLE MACHINE[2016/31]
French:PROCÉDÉ ET SYSTÈME DE FONCTIONNEMENT ET/OU DE SURVEILLANCE D'UNE MACHINE MULTIAXIALE[2019/26]
Former [2016/31]PROCEDE ET SYSTEME DE FONCTIONNEMENT ET/OU DE SURVEILLANCE D'UNE MACHINE MULTIAXIALE
Examination procedure03.12.2015Date on which the examining division has become responsible
04.04.2017Amendment by applicant (claims and/or description)
04.04.2017Examination requested  [2017/20]
11.10.2018Despatch of a communication from the examining division (Time limit: M04)
29.01.2019Reply to a communication from the examining division
28.05.2019Communication of intention to grant the patent
03.09.2019Fee for grant paid
03.09.2019Fee for publishing/printing paid
03.09.2019Receipt of the translation of the claim(s)
Opposition(s)17.07.2020No opposition filed within time limit [2020/39]
Fees paidRenewal fee
12.12.2017Renewal fee patent year 03
12.12.2018Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU03.12.2015
AL16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
MK16.10.2019
MT16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
TR16.10.2019
IE03.12.2019
LU03.12.2019
BE31.12.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
[2022/31]
Former [2022/27]HU03.12.2015
AL16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
MT16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
TR16.10.2019
IE03.12.2019
LU03.12.2019
BE31.12.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2021/34]HU03.12.2015
AL16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
MT16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
IE03.12.2019
LU03.12.2019
BE31.12.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2021/32]HU03.12.2015
AL16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
IE03.12.2019
LU03.12.2019
BE31.12.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2021/26]AL16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
IE03.12.2019
LU03.12.2019
BE31.12.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/51]AL16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
IE03.12.2019
LU03.12.2019
BE31.12.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/46]AL16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SK16.10.2019
SM16.10.2019
IE03.12.2019
LU03.12.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/39]AL16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/38]AL16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/37]AL16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/36]AL16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/35]AL16.10.2019
CZ16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/34]AL16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RS16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/32]AL16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RS16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/25]FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RS16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/24]FI16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/23]FI16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
Former [2020/22]FI16.10.2019
LT16.10.2019
NL16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
PT17.02.2020
Former [2020/21]NL16.10.2019
NO16.01.2020
Former [2020/20]NL16.10.2019
Documents cited:Search[XI]EP2108933  (KUKA ROBOTER GMBH [DE]) [X] 1,2,5,6,13,14 * paragraph [0012] - paragraph [0016] * * claims 4,6 * * paragraph [0031] - paragraph [0037] * * paragraph [0027] - paragraph [0029] * * paragraph [0020] * * figures 1,2,3 * [I] 3,4,11,12;
 [A]WO2010025944  (KUKA ROBOTER GMBH [DE], et al) [A] 1-6,11-14 * abstract *;
 [A]DE102012003479  (KUKA ROBOTER GMBH [DE]) [A] 1-6,11-14 * figure 1 * * paragraph [0032] - paragraph [0035] *
ExaminationEP3017917
 EP1806837
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.