EP2903400 - Electronic device [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.06.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 03.07.2020 | ||
Former | Grant of patent is intended Status updated on 16.02.2020 | ||
Former | Examination is in progress Status updated on 14.12.2018 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Yokogawa Electric Corporation 9-32, Naka-cho 2-chome Musashino-shi Tokyo 180-8750 / JP | [2020/32] |
Former [2015/32] | For all designated states Yokogawa Electric Corporation 9-32, Naka-cho 2-chome Musashino-shi Tokyo 180-8750 / JP | Inventor(s) | 01 /
Izumi, Hayato c/o Yokogawa Electric Corporation 9-32, Naka-cho 2-chome, Musashino-shi Tokyo, 180-8750 / JP | 02 /
Owaki, Yasuhiro c/o Yokogawa Electric Corporation 9-32, Naka-cho 2-chome, Musashino-shi Tokyo, 180-8750 / JP | 03 /
Shimamura, Koichiro c/o Yokogawa Electric Corporation 9-32, Naka-cho 2-chome, Musashino-shi Tokyo, 180-8750 / JP | [2015/32] | Representative(s) | Henkel & Partner mbB Patentanwaltskanzlei, Rechtsanwaltskanzlei Maximiliansplatz 21 80333 München / DE | [2020/32] |
Former [2015/32] | Henkel, Breuer & Partner Patentanwälte Maximiliansplatz 21 80333 München / DE | Application number, filing date | 15150860.3 | 12.01.2015 | [2015/32] | Priority number, date | JP20140014666 | 29.01.2014 Original published format: JP 2014014666 | JP20140190617 | 19.09.2014 Original published format: JP 2014190617 | [2015/32] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2903400 | Date: | 05.08.2015 | Language: | EN | [2015/32] | Type: | A3 Search report | No.: | EP2903400 | Date: | 02.12.2015 | Language: | EN | [2015/49] | Type: | B1 Patent specification | No.: | EP2903400 | Date: | 05.08.2020 | Language: | EN | [2020/32] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 02.11.2015 | Classification | IPC: | H05K7/14 | [2015/34] | CPC: |
H05K7/1465 (EP,US);
H01R13/629 (US);
H01R13/68 (US);
H01R13/7175 (US);
H01R24/66 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/27] |
Former [2015/32] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Elektronische Vorrichtung | [2015/32] | English: | Electronic device | [2015/32] | French: | Dispositif électronique | [2015/32] | Examination procedure | 27.05.2016 | Amendment by applicant (claims and/or description) | 27.05.2016 | Examination requested [2016/27] | 12.12.2018 | Despatch of a communication from the examining division (Time limit: M04) | 23.04.2019 | Reply to a communication from the examining division | 17.02.2020 | Communication of intention to grant the patent | 29.06.2020 | Fee for grant paid | 29.06.2020 | Fee for publishing/printing paid | 29.06.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 07.05.2021 | No opposition filed within time limit [2021/28] | Fees paid | Renewal fee | 11.01.2017 | Renewal fee patent year 03 | 15.01.2018 | Renewal fee patent year 04 | 15.01.2019 | Renewal fee patent year 05 | 14.01.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.01.2015 | AL | 05.08.2020 | AT | 05.08.2020 | CY | 05.08.2020 | CZ | 05.08.2020 | DK | 05.08.2020 | EE | 05.08.2020 | ES | 05.08.2020 | FI | 05.08.2020 | HR | 05.08.2020 | IT | 05.08.2020 | LT | 05.08.2020 | LV | 05.08.2020 | MC | 05.08.2020 | MK | 05.08.2020 | MT | 05.08.2020 | NL | 05.08.2020 | PL | 05.08.2020 | RO | 05.08.2020 | RS | 05.08.2020 | SE | 05.08.2020 | SI | 05.08.2020 | SK | 05.08.2020 | SM | 05.08.2020 | BG | 05.11.2020 | NO | 05.11.2020 | GR | 06.11.2020 | IS | 05.12.2020 | PT | 07.12.2020 | GB | 12.01.2021 | IE | 12.01.2021 | LU | 12.01.2021 | BE | 31.01.2021 | CH | 31.01.2021 | FR | 31.01.2021 | LI | 31.01.2021 | [2024/41] |
Former [2024/22] | HU | 12.01.2015 | |
AL | 05.08.2020 | ||
AT | 05.08.2020 | ||
CY | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
MK | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
GB | 12.01.2021 | ||
IE | 12.01.2021 | ||
LU | 12.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
FR | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2023/30] | HU | 12.01.2015 | |
AL | 05.08.2020 | ||
AT | 05.08.2020 | ||
CY | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
GB | 12.01.2021 | ||
IE | 12.01.2021 | ||
LU | 12.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
FR | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2023/27] | HU | 12.01.2015 | |
AL | 05.08.2020 | ||
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
GB | 12.01.2021 | ||
IE | 12.01.2021 | ||
LU | 12.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
FR | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2022/34] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
GB | 12.01.2021 | ||
IE | 12.01.2021 | ||
LU | 12.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
FR | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2022/23] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
GB | 12.01.2021 | ||
IE | 12.01.2021 | ||
LU | 12.01.2021 | ||
CH | 31.01.2021 | ||
FR | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2022/10] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
PT | 07.12.2020 | ||
GB | 12.01.2021 | ||
IE | 12.01.2021 | ||
LU | 12.01.2021 | ||
CH | 31.01.2021 | ||
FR | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2022/07] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
GB | 12.01.2021 | ||
IE | 12.01.2021 | ||
LU | 12.01.2021 | ||
CH | 31.01.2021 | ||
FR | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2021/52] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
GB | 12.01.2021 | ||
LU | 12.01.2021 | ||
CH | 31.01.2021 | ||
FR | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2021/49] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
GB | 12.01.2021 | ||
LU | 12.01.2021 | ||
FR | 31.01.2021 | ||
Former [2021/48] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
LU | 12.01.2021 | ||
FR | 31.01.2021 | ||
Former [2021/43] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
LU | 12.01.2021 | ||
Former [2021/40] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/36] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/34] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/28] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/25] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/23] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/22] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/21] | AT | 05.08.2020 | |
DK | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/12] | AT | 05.08.2020 | |
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/10] | AT | 05.08.2020 | |
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
PL | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/09] | AT | 05.08.2020 | |
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
LT | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
PT | 07.12.2020 | ||
Former [2021/08] | ES | 05.08.2020 | |
FI | 05.08.2020 | ||
LT | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
PT | 07.12.2020 | ||
Former [2021/07] | FI | 05.08.2020 | |
LT | 05.08.2020 | ||
NO | 05.11.2020 | Documents cited: | Search | [XYI]US3942077 (POWERS HOWARD A) [X] 1,2,7,8 * the whole document * [Y] 3,6,9,12 [I] 4,5,10,11,13-15; | [XYI]DE9102101U (KLÖCKNER-MÜLLER GMBH) [X] 1,2 * the whole document * [Y] 3,6 [I] 4,5; | [XYI]EP0499675 (SIEMENS AG [DE]) [X] 1,2 * the whole document * [Y] 3,6 [I] 4,5; | [XYI]EP0527247 (SIEMENS AG [DE]) [X] 1,2 * the whole document * [Y] 3,6 [I] 4,5; | [XYI]US5493194 (DAMIANO MICHAEL [US], et al) [X] 1,2 * the whole document * [Y] 3,6 [I] 4,5; | [XYI]DE29716575U (SIEMENS AG [DE]) [X] 1,2 * the whole document * [Y] 3,6 [I] 4,5; | [XYI]DE9117303U (SIEMENS AG [DE]) [X] 1,2 * the whole document * [Y] 3,6 [I] 4,5; | [Y]US6172875 (SUZUKI TAKAO [JP], et al) [Y] 3,6,9,12 * the whole document *; | [XYI]EP1901598 (SIEMENS AG [DE]) [X] 1,2 * the whole document * [Y] 3,6 [I] 4,5; | [XYI]EP2042953 (PHOENIX CONTACT GMBH & CO [DE]) [X] 1,2 * the whole document * [Y] 3,6 [I] 4,5; | [XD]JP2012134352 (YOKOGAWA ELECTRIC CORP) [XD] 7* figure 1 * | Examination | US5139430 | US5868261 | US7106596 | by applicant | JP2012134352 |