blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2899915

EP2899915 - Inter-operability test indication for uplink-downlink configuration combinations for primary cell and secondary cell for wireless networks using carrier aggregation [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.10.2017
Database last updated on 30.10.2024
FormerThe patent has been granted
Status updated on  18.11.2016
FormerGrant of patent is intended
Status updated on  09.11.2016
Most recent event   Tooltip17.07.2020Lapse of the patent in a contracting state
New state(s): AL
published on 19.08.2020  [2020/34]
Applicant(s)For all designated states
Nokia Solutions and Networks Oy
Karaportti 3
02610 Espoo / FI
[2016/51]
Former [2015/31]For all designated states
Nokia Solutions and Networks Oy
Karaportti 3
02610 Espoo / FI
Inventor(s)01 / WU, Chunli
12-5-301, Huihuayuan, Huilongguan,
Changping District
Beijing Chongqing 102208 / CN
02 / HWANG, Woonhee
Juhanintie 6 A
02180 Espoo / FI
03 / YAO, Chun Hai
Room 602, building 125, Nanhuzhongyuan,
Chaoyang District
Beijing 100102 / CN
 [2016/51]
Former [2015/31]01 / Wu, Chunli
12-5-301, Huihuayuan, Huilongguan, Changping
District
102208 Beijing / CN
02 / Hwang, Woonhee
Juhanintie 6 A
02180 Espoo / FI
03 / Yao, Chun Hai
Room 602, building 125, Nanhuzhongyuan, Chaoyang
District
100102 Beijing / CN
Representative(s)Nokia EPO representatives, et al
Nokia Technologies Oy
Karakaari 7
02610 Espoo / FI
[N/P]
Former [2016/51]Nokia Corporation, et al
Intellectual Property Department
Karakaari 7
02610 Espoo / FI
Application number, filing date15152117.622.01.2015
[2015/31]
Priority number, dateWO2014CN7133324.01.2014         Original published format: PCT/CN2014/071333
[2015/31]
Previously filed application, dateWO2014CN7133324.01.2014
[2015/31]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2899915
Date:29.07.2015
Language:EN
[2015/31]
Type: B1 Patent specification 
No.:EP2899915
Date:21.12.2016
Language:EN
[2016/51]
Search report(s)(Supplementary) European search report - dispatched on:EP03.06.2015
ClassificationIPC:H04L5/00
[2015/31]
CPC:
H04L5/001 (EP,KR,RU,US); H04W72/20 (KR); H04W24/08 (KR,RU,US);
H04L5/14 (KR,RU,US); H04W72/23 (KR)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/10]
Former [2015/31]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Zusammenarbeitsfähigkeitstestanzeige für Uplink-Downlink-Konfigurationskombinationen für Primärzellen und Sekundärzellen für drahtlose Netze mit Trägeraggregation[2015/31]
English:Inter-operability test indication for uplink-downlink configuration combinations for primary cell and secondary cell for wireless networks using carrier aggregation[2015/31]
French:Indication de test de l'interopérabilité des combinaisons de configuration des liaisons montantes-descendantes pour cellules primaires et secondaires pour des réseaux sans fil utilisant une agrégation de porteuses[2015/31]
Examination procedure22.01.2016Amendment by applicant (claims and/or description)
29.01.2016Examination requested  [2016/10]
15.04.2016Communication of intention to grant the patent
21.06.2016Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
21.07.2016Communication of intention to grant the patent
08.11.2016Fee for grant paid
08.11.2016Fee for publishing/printing paid
08.11.2016Receipt of the translation of the claim(s)
Opposition(s)22.09.2017No opposition filed within time limit [2017/48]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU22.01.2015
AL21.12.2016
AT21.12.2016
BE21.12.2016
CY21.12.2016
CZ21.12.2016
DK21.12.2016
EE21.12.2016
ES21.12.2016
FI21.12.2016
HR21.12.2016
IT21.12.2016
LT21.12.2016
LV21.12.2016
MC21.12.2016
MK21.12.2016
PL21.12.2016
RO21.12.2016
RS21.12.2016
SE21.12.2016
SI21.12.2016
SK21.12.2016
SM21.12.2016
TR21.12.2016
IE22.01.2017
LU22.01.2017
MT22.01.2017
BG21.03.2017
NO21.03.2017
GR22.03.2017
IS21.04.2017
PT21.04.2017
[2020/34]
Former [2020/15]HU22.01.2015
AT21.12.2016
BE21.12.2016
CY21.12.2016
CZ21.12.2016
DK21.12.2016
EE21.12.2016
ES21.12.2016
FI21.12.2016
HR21.12.2016
IT21.12.2016
LT21.12.2016
LV21.12.2016
MC21.12.2016
MK21.12.2016
PL21.12.2016
RO21.12.2016
RS21.12.2016
SE21.12.2016
SI21.12.2016
SK21.12.2016
SM21.12.2016
TR21.12.2016
IE22.01.2017
LU22.01.2017
MT22.01.2017
BG21.03.2017
NO21.03.2017
GR22.03.2017
IS21.04.2017
PT21.04.2017
Former [2019/52]HU22.01.2015
AT21.12.2016
BE21.12.2016
CY21.12.2016
CZ21.12.2016
DK21.12.2016
EE21.12.2016
ES21.12.2016
FI21.12.2016
HR21.12.2016
IT21.12.2016
LT21.12.2016
LV21.12.2016
MC21.12.2016
MK21.12.2016
PL21.12.2016
RO21.12.2016
RS21.12.2016
SE21.12.2016
SI21.12.2016
SK21.12.2016
SM21.12.2016
IE22.01.2017
LU22.01.2017
MT22.01.2017
BG21.03.2017
NO21.03.2017
GR22.03.2017
IS21.04.2017
PT21.04.2017
Former [2019/47]HU22.01.2015
AT21.12.2016
BE21.12.2016
CY21.12.2016
CZ21.12.2016
DK21.12.2016
EE21.12.2016
ES21.12.2016
FI21.12.2016
HR21.12.2016
IT21.12.2016
LT21.12.2016
LV21.12.2016
MC21.12.2016
PL21.12.2016
RO21.12.2016
RS21.12.2016
SE21.12.2016
SI21.12.2016
SK21.12.2016
SM21.12.2016
IE22.01.2017
LU22.01.2017
MT22.01.2017
BG21.03.2017
NO21.03.2017
GR22.03.2017
IS21.04.2017
PT21.04.2017
Former [2019/31]HU22.01.2015
AT21.12.2016
BE21.12.2016
CZ21.12.2016
DK21.12.2016
EE21.12.2016
ES21.12.2016
FI21.12.2016
HR21.12.2016
IT21.12.2016
LT21.12.2016
LV21.12.2016
MC21.12.2016
PL21.12.2016
RO21.12.2016
RS21.12.2016
SE21.12.2016
SI21.12.2016
SK21.12.2016
SM21.12.2016
IE22.01.2017
LU22.01.2017
MT22.01.2017
BG21.03.2017
NO21.03.2017
GR22.03.2017
IS21.04.2017
PT21.04.2017
Former [2018/43]AT21.12.2016
BE21.12.2016
CZ21.12.2016
DK21.12.2016
EE21.12.2016
ES21.12.2016
FI21.12.2016
HR21.12.2016
IT21.12.2016
LT21.12.2016
LV21.12.2016
MC21.12.2016
PL21.12.2016
RO21.12.2016
RS21.12.2016
SE21.12.2016
SI21.12.2016
SK21.12.2016
SM21.12.2016
IE22.01.2017
LU22.01.2017
MT22.01.2017
BG21.03.2017
NO21.03.2017
GR22.03.2017
IS21.04.2017
PT21.04.2017
Former [2018/13]AT21.12.2016
BE21.12.2016
CZ21.12.2016
DK21.12.2016
EE21.12.2016
ES21.12.2016
FI21.12.2016
HR21.12.2016
IT21.12.2016
LT21.12.2016
LV21.12.2016
MC21.12.2016
PL21.12.2016
RO21.12.2016
RS21.12.2016
SE21.12.2016
SI21.12.2016
SK21.12.2016
SM21.12.2016
IE22.01.2017
LU22.01.2017
BG21.03.2017
NO21.03.2017
GR22.03.2017
IS21.04.2017
PT21.04.2017
Former [2018/01]AT21.12.2016
BE21.12.2016
CZ21.12.2016
DK21.12.2016
EE21.12.2016
ES21.12.2016
FI21.12.2016
HR21.12.2016
IT21.12.2016
LT21.12.2016
LV21.12.2016
MC21.12.2016
PL21.12.2016
RO21.12.2016
RS21.12.2016
SE21.12.2016
SK21.12.2016
SM21.12.2016
LU22.01.2017
BG21.03.2017
NO21.03.2017
GR22.03.2017
IS21.04.2017
PT21.04.2017
Former [2017/42]AT21.12.2016
BE21.12.2016
CZ21.12.2016
EE21.12.2016
ES21.12.2016
FI21.12.2016
HR21.12.2016
IT21.12.2016
LT21.12.2016
LV21.12.2016
MC21.12.2016
PL21.12.2016
RO21.12.2016
RS21.12.2016
SE21.12.2016
SK21.12.2016
SM21.12.2016
BG21.03.2017
NO21.03.2017
GR22.03.2017
IS21.04.2017
PT21.04.2017
Former [2017/37]AT21.12.2016
BE21.12.2016
CZ21.12.2016
EE21.12.2016
ES21.12.2016
FI21.12.2016
HR21.12.2016
IT21.12.2016
LT21.12.2016
LV21.12.2016
PL21.12.2016
RO21.12.2016
RS21.12.2016
SE21.12.2016
SK21.12.2016
SM21.12.2016
NO21.03.2017
GR22.03.2017
IS21.04.2017
Former [2017/36]BE21.12.2016
CZ21.12.2016
EE21.12.2016
ES21.12.2016
FI21.12.2016
HR21.12.2016
LT21.12.2016
LV21.12.2016
PL21.12.2016
RO21.12.2016
RS21.12.2016
SE21.12.2016
SK21.12.2016
NO21.03.2017
GR22.03.2017
IS21.04.2017
Former [2017/34]CZ21.12.2016
FI21.12.2016
HR21.12.2016
LT21.12.2016
LV21.12.2016
RS21.12.2016
SE21.12.2016
BE31.01.2017
NO21.03.2017
GR22.03.2017
Former [2017/28]FI21.12.2016
HR21.12.2016
LT21.12.2016
LV21.12.2016
RS21.12.2016
SE21.12.2016
BE31.01.2017
NO21.03.2017
GR22.03.2017
Former [2017/12]LV21.12.2016
Documents cited:Search[A]US2012281601  (KUO RICHARD LEE-CHEE [TW], et al) [A] 1-18 * abstract *;
 [A]US2013188532  (ZHANG SHICHANG [CN], et al) [A] 1-18 * abstract *;
 [A]US2013315114  (SEO DONG YOUN [KR], et al) [A] 1-18* abstract *;
 [X]  - QUALCOMM INCORPORATED, "IOT bit for inter-band TDD CA with different UL/DL configurations", vol. TSG RAN, no. Busan, South Korea; 20131203 - 20131206, (20131202), 3GPP DRAFT; RP-131748, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN/RAN/Docs/, (20131202), XP050733899 [X] 1-18 * the whole document *
 [A]  - NOKIA SIEMENS NETWORKS ET AL, "Views on inter-band CA with different TDD configurations on different bands", 3GPP DRAFT; R1-113136, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20111004), vol. RAN WG1, no. Zhuhai; 20111010, XP050538271 [A] 1-18 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.