EP2913684 - Dynamic compensation circuit [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 23.07.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 14.08.2020 | ||
Former | Grant of patent is intended Status updated on 02.04.2020 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Tektronix, Inc. 14150 SW Karl Braun Drive P.O. Box 500, M/S 50-LAW Beaverton, Oregon 97077-0001 / US | [2015/36] | Inventor(s) | 01 /
Mende, Michael 14775 NW Jewell Lane Portland, OR 97229 / US | 02 /
Booman, Richard 1911 Kilkenny Road Lake Oswego, OR 97034 / US | [2020/35] |
Former [2016/30] | 01 /
Mende, Michael 14150 SW Karl Braun Drive P.O. Box 500 M/S 50-LAW Beaverton, OR 97077-0001 / US | ||
02 /
Booman, Richard 14150 SW Karl Braun Drive P.O. Box 500 M/S 50-LAW Beaverton, OR 97077-0001 / US | |||
Former [2015/36] | 01 /
Mende, Michael 14150 SW Karl Braun Drive P.O. Box 500, M/S 50-LAW Beaverton, OR Oregon 97077-0001 / US | ||
02 /
Booman, Richard 14150 SW Karl Braun Drive P.O. Box 500, M/S 50-LAW Beaverton, OR Oregon 97077-0001 / US | Representative(s) | HGF HGF Limited 1 City Walk Leeds LS11 9DX / GB | [N/P] |
Former [2020/38] | HGF 1 City Walk Leeds LS11 9DX / GB | ||
Former [2015/36] | Clarke, Jeffrey David HGF Limited Fountain Precinct Balm Green Sheffield S1 2JA / GB | Application number, filing date | 15156242.8 | 24.02.2015 | [2015/36] | Priority number, date | US201414188299 | 24.02.2014 Original published format: US201414188299 | [2015/36] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2913684 | Date: | 02.09.2015 | Language: | EN | [2015/36] | Type: | B1 Patent specification | No.: | EP2913684 | Date: | 16.09.2020 | Language: | EN | [2020/38] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 30.07.2015 | Classification | IPC: | G01R1/067, G01R35/00 | [2015/36] | CPC: |
G01R35/00 (EP,US);
G01R1/06766 (EP,US);
G01R15/24 (US);
G01R31/00 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/30] |
Former [2015/36] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Dynamische Kompensationsschaltung | [2015/36] | English: | Dynamic compensation circuit | [2015/36] | French: | Circuit de compensation dynamique | [2015/36] | Examination procedure | 08.04.2016 | Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time | 17.06.2016 | Amendment by applicant (claims and/or description) | 17.06.2016 | Examination requested [2016/30] | 03.04.2020 | Communication of intention to grant the patent | 11.08.2020 | Fee for grant paid | 11.08.2020 | Fee for publishing/printing paid | 11.08.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 17.06.2021 | No opposition filed within time limit [2021/34] | Request for further processing for: | The application is deemed to be withdrawn due to non-payment of the examination fee | 17.06.2016 | Request for further processing filed | 17.06.2016 | Full payment received (date of receipt of payment) Request granted | 29.06.2016 | Decision despatched | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 17.06.2016 | Request for further processing filed | 17.06.2016 | Full payment received (date of receipt of payment) Request granted | 29.06.2016 | Decision despatched | The application is deemed to be withdrawn due to non-payment of designation fees TR, SM, SK, SI, SE, RS, RO, PT, PL, NO, NL, MT, MK, MC, LV, LU, LT, IT, IS, IE, HU, HR, GR, GB, FR, FI, ES, EE, DK, DE, CZ, CY, CH, BG, BE, AT, AL | 17.06.2016 | Request for further processing filed | 17.06.2016 | Full payment received (date of receipt of payment) Request granted | 29.06.2016 | Decision despatched | Fees paid | Renewal fee | 27.02.2017 | Renewal fee patent year 03 | 27.02.2018 | Renewal fee patent year 04 | 27.02.2019 | Renewal fee patent year 05 | 27.02.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.02.2015 | AL | 16.09.2020 | AT | 16.09.2020 | CY | 16.09.2020 | CZ | 16.09.2020 | DK | 16.09.2020 | EE | 16.09.2020 | ES | 16.09.2020 | FI | 16.09.2020 | HR | 16.09.2020 | IT | 16.09.2020 | LT | 16.09.2020 | LV | 16.09.2020 | MC | 16.09.2020 | MK | 16.09.2020 | MT | 16.09.2020 | NL | 16.09.2020 | PL | 16.09.2020 | RO | 16.09.2020 | RS | 16.09.2020 | SE | 16.09.2020 | SI | 16.09.2020 | SK | 16.09.2020 | SM | 16.09.2020 | TR | 16.09.2020 | BG | 16.12.2020 | NO | 16.12.2020 | GR | 17.12.2020 | IS | 16.01.2021 | PT | 18.01.2021 | GB | 24.02.2021 | IE | 24.02.2021 | LU | 24.02.2021 | BE | 28.02.2021 | CH | 28.02.2021 | FR | 28.02.2021 | LI | 28.02.2021 | [2024/41] |
Former [2024/29] | HU | 24.02.2015 | |
AL | 16.09.2020 | ||
AT | 16.09.2020 | ||
CY | 16.09.2020 | ||
CZ | 16.09.2020 | ||
DK | 16.09.2020 | ||
EE | 16.09.2020 | ||
ES | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
IT | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
MC | 16.09.2020 | ||
MK | 16.09.2020 | ||
NL | 16.09.2020 | ||
PL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SI | 16.09.2020 | ||
SK | 16.09.2020 | ||
SM | 16.09.2020 | ||
TR | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
IS | 16.01.2021 | ||
PT | 18.01.2021 | ||
GB | 24.02.2021 | ||
IE | 24.02.2021 | ||
LU | 24.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2024/22] | HU | 24.02.2015 | |
AL | 16.09.2020 | ||
AT | 16.09.2020 | ||
CY | 16.09.2020 | ||
CZ | 16.09.2020 | ||
DK | 16.09.2020 | ||
EE | 16.09.2020 | ||
ES | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
IT | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
MC | 16.09.2020 | ||
MK | 16.09.2020 | ||
NL | 16.09.2020 | ||
PL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SI | 16.09.2020 | ||
SK | 16.09.2020 | ||
SM | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
IS | 16.01.2021 | ||
PT | 18.01.2021 | ||
GB | 24.02.2021 | ||
IE | 24.02.2021 | ||
LU | 24.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2023/30] | HU | 24.02.2015 | |
AL | 16.09.2020 | ||
AT | 16.09.2020 | ||
CY | 16.09.2020 | ||
CZ | 16.09.2020 | ||
DK | 16.09.2020 | ||
EE | 16.09.2020 | ||
ES | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
IT | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
MC | 16.09.2020 | ||
NL | 16.09.2020 | ||
PL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SI | 16.09.2020 | ||
SK | 16.09.2020 | ||
SM | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
IS | 16.01.2021 | ||
PT | 18.01.2021 | ||
GB | 24.02.2021 | ||
IE | 24.02.2021 | ||
LU | 24.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2023/27] | HU | 24.02.2015 | |
AL | 16.09.2020 | ||
AT | 16.09.2020 | ||
CZ | 16.09.2020 | ||
DK | 16.09.2020 | ||
EE | 16.09.2020 | ||
ES | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
IT | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
MC | 16.09.2020 | ||
NL | 16.09.2020 | ||
PL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SI | 16.09.2020 | ||
SK | 16.09.2020 | ||
SM | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
IS | 16.01.2021 | ||
PT | 18.01.2021 | ||
GB | 24.02.2021 | ||
IE | 24.02.2021 | ||
LU | 24.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2022/34] | AL | 16.09.2020 | |
AT | 16.09.2020 | ||
CZ | 16.09.2020 | ||
DK | 16.09.2020 | ||
EE | 16.09.2020 | ||
ES | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
IT | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
MC | 16.09.2020 | ||
NL | 16.09.2020 | ||
PL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SI | 16.09.2020 | ||
SK | 16.09.2020 | ||
SM | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
IS | 16.01.2021 | ||
PT | 18.01.2021 | ||
GB | 24.02.2021 | ||
IE | 24.02.2021 | ||
LU | 24.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2022/08] | AL | 16.09.2020 | |
AT | 16.09.2020 | ||
CZ | 16.09.2020 | ||
DK | 16.09.2020 | ||
EE | 16.09.2020 | ||
ES | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
IT | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
MC | 16.09.2020 | ||
NL | 16.09.2020 | ||
PL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SI | 16.09.2020 | ||
SK | 16.09.2020 | ||
SM | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
IS | 16.01.2021 | ||
PT | 18.01.2021 | ||
GB | 24.02.2021 | ||
IE | 24.02.2021 | ||
LU | 24.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2022/07] | AL | 16.09.2020 | |
AT | 16.09.2020 | ||
CZ | 16.09.2020 | ||
DK | 16.09.2020 | ||
EE | 16.09.2020 | ||
ES | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
IT | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
MC | 16.09.2020 | ||
NL | 16.09.2020 | ||
PL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SI | 16.09.2020 | ||
SK | 16.09.2020 | ||
SM | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
IS | 16.01.2021 | ||
PT | 18.01.2021 | ||
IE | 24.02.2021 | ||
LU | 24.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2021/48] | AL | 16.09.2020 | |
AT | 16.09.2020 | ||
CZ | 16.09.2020 | ||
DK | 16.09.2020 | ||
EE | 16.09.2020 | ||
ES | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
IT | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
MC | 16.09.2020 | ||
NL | 16.09.2020 | ||
PL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SI | 16.09.2020 | ||
SK | 16.09.2020 | ||
SM | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
IS | 16.01.2021 | ||
PT | 18.01.2021 | ||
LU | 24.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2021/47] | AL | 16.09.2020 | |
AT | 16.09.2020 | ||
CZ | 16.09.2020 | ||
DK | 16.09.2020 | ||
EE | 16.09.2020 | ||
ES | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
MC | 16.09.2020 | ||
NL | 16.09.2020 | ||
PL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SI | 16.09.2020 | ||
SK | 16.09.2020 | ||
SM | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
IS | 16.01.2021 | ||
PT | 18.01.2021 | ||
LU | 24.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2021/41] | AL | 16.09.2020 | |
AT | 16.09.2020 | ||
CZ | 16.09.2020 | ||
DK | 16.09.2020 | ||
EE | 16.09.2020 | ||
ES | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
MC | 16.09.2020 | ||
NL | 16.09.2020 | ||
PL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SI | 16.09.2020 | ||
SK | 16.09.2020 | ||
SM | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
IS | 16.01.2021 | ||
PT | 18.01.2021 | ||
Former [2021/37] | AL | 16.09.2020 | |
AT | 16.09.2020 | ||
CZ | 16.09.2020 | ||
DK | 16.09.2020 | ||
EE | 16.09.2020 | ||
ES | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
NL | 16.09.2020 | ||
PL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SI | 16.09.2020 | ||
SK | 16.09.2020 | ||
SM | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
IS | 16.01.2021 | ||
PT | 18.01.2021 | ||
Former [2021/36] | AL | 16.09.2020 | |
AT | 16.09.2020 | ||
CZ | 16.09.2020 | ||
EE | 16.09.2020 | ||
ES | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
NL | 16.09.2020 | ||
PL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SI | 16.09.2020 | ||
SK | 16.09.2020 | ||
SM | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
IS | 16.01.2021 | ||
PT | 18.01.2021 | ||
Former [2021/28] | AL | 16.09.2020 | |
AT | 16.09.2020 | ||
CZ | 16.09.2020 | ||
EE | 16.09.2020 | ||
ES | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
NL | 16.09.2020 | ||
PL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SK | 16.09.2020 | ||
SM | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
IS | 16.01.2021 | ||
PT | 18.01.2021 | ||
Former [2021/25] | AL | 16.09.2020 | |
AT | 16.09.2020 | ||
CZ | 16.09.2020 | ||
EE | 16.09.2020 | ||
ES | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
NL | 16.09.2020 | ||
PL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SM | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
IS | 16.01.2021 | ||
PT | 18.01.2021 | ||
Former [2021/23] | AT | 16.09.2020 | |
CZ | 16.09.2020 | ||
EE | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
NL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SM | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
PT | 18.01.2021 | ||
Former [2021/22] | CZ | 16.09.2020 | |
EE | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
NL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
PT | 18.01.2021 | ||
Former [2021/21] | FI | 16.09.2020 | |
HR | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
NL | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
PT | 18.01.2021 | ||
Former [2021/20] | FI | 16.09.2020 | |
HR | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
NL | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
Former [2021/18] | FI | 16.09.2020 | |
HR | 16.09.2020 | ||
LV | 16.09.2020 | ||
NL | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
Former [2021/10] | FI | 16.09.2020 | |
HR | 16.09.2020 | ||
LV | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
Former [2021/09] | FI | 16.09.2020 | |
SE | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
Former [2021/08] | FI | 16.09.2020 | |
SE | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
Former [2021/07] | FI | 16.09.2020 | |
NO | 16.12.2020 | Documents cited: | Search | [XI]US4803423 (BOUTIGNY PIERRE-HENRI [FR]) [X] 1-4,6-13 * column 2, line 27 - column 4, line 21; figure 2 * [I] 5; | [XI]WO2008019740 (ROHDE & SCHWARZ [DE], et al) [X] 1-4,6-13 * page 3, line 22 - line 29; figures 6-8 * * page 6, line 5 - line 28 * [I] 5; | [A]US6870359 (SEKEL STEPHEN MARK [US]) [A] 1-13 * column 4, line 42 - column 11, line 38 *; | [A]US2001028251 (OKAYASU TOSHIYUKI [JP]) [A] 1-13 * column 2, line 43 - column 4, line 58 * |