blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2913684

EP2913684 - Dynamic compensation circuit [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  23.07.2021
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  14.08.2020
FormerGrant of patent is intended
Status updated on  02.04.2020
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024  [2024/41]
Applicant(s)For all designated states
Tektronix, Inc.
14150 SW Karl Braun Drive P.O. Box 500, M/S 50-LAW
Beaverton, Oregon 97077-0001 / US
[2015/36]
Inventor(s)01 / Mende, Michael
14775 NW Jewell Lane
Portland, OR 97229 / US
02 / Booman, Richard
1911 Kilkenny Road
Lake Oswego, OR 97034 / US
 [2020/35]
Former [2016/30]01 / Mende, Michael
14150 SW Karl Braun Drive
P.O. Box 500
M/S 50-LAW
Beaverton, OR 97077-0001 / US
02 / Booman, Richard
14150 SW Karl Braun Drive
P.O. Box 500
M/S 50-LAW
Beaverton, OR 97077-0001 / US
Former [2015/36]01 / Mende, Michael
14150 SW Karl Braun Drive
P.O. Box 500, M/S 50-LAW
Beaverton, OR Oregon 97077-0001 / US
02 / Booman, Richard
14150 SW Karl Braun Drive
P.O. Box 500, M/S 50-LAW
Beaverton, OR Oregon 97077-0001 / US
Representative(s)HGF
HGF Limited
1 City Walk
Leeds LS11 9DX / GB
[N/P]
Former [2020/38]HGF
1 City Walk
Leeds LS11 9DX / GB
Former [2015/36]Clarke, Jeffrey David
HGF Limited
Fountain Precinct
Balm Green
Sheffield S1 2JA / GB
Application number, filing date15156242.824.02.2015
[2015/36]
Priority number, dateUS20141418829924.02.2014         Original published format: US201414188299
[2015/36]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2913684
Date:02.09.2015
Language:EN
[2015/36]
Type: B1 Patent specification 
No.:EP2913684
Date:16.09.2020
Language:EN
[2020/38]
Search report(s)(Supplementary) European search report - dispatched on:EP30.07.2015
ClassificationIPC:G01R1/067, G01R35/00
[2015/36]
CPC:
G01R35/00 (EP,US); G01R1/06766 (EP,US); G01R15/24 (US);
G01R31/00 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/30]
Former [2015/36]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Dynamische Kompensationsschaltung[2015/36]
English:Dynamic compensation circuit[2015/36]
French:Circuit de compensation dynamique[2015/36]
Examination procedure08.04.2016Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time
17.06.2016Amendment by applicant (claims and/or description)
17.06.2016Examination requested  [2016/30]
03.04.2020Communication of intention to grant the patent
11.08.2020Fee for grant paid
11.08.2020Fee for publishing/printing paid
11.08.2020Receipt of the translation of the claim(s)
Opposition(s)17.06.2021No opposition filed within time limit [2021/34]
Request for further processing for:The application is deemed to be withdrawn due to non-payment of the examination fee
17.06.2016Request for further processing filed
17.06.2016Full payment received (date of receipt of payment)
Request granted
29.06.2016Decision despatched
The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report
17.06.2016Request for further processing filed
17.06.2016Full payment received (date of receipt of payment)
Request granted
29.06.2016Decision despatched
The application is deemed to be withdrawn due to non-payment of designation fees
TR, SM, SK, SI, SE, RS, RO, PT, PL, NO, NL, MT, MK, MC, LV, LU, LT, IT, IS, IE, HU, HR, GR, GB, FR, FI, ES, EE, DK, DE, CZ, CY, CH, BG, BE, AT, AL
17.06.2016Request for further processing filed
17.06.2016Full payment received (date of receipt of payment)
Request granted
29.06.2016Decision despatched
Fees paidRenewal fee
27.02.2017Renewal fee patent year 03
27.02.2018Renewal fee patent year 04
27.02.2019Renewal fee patent year 05
27.02.2020Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU24.02.2015
AL16.09.2020
AT16.09.2020
CY16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
MK16.09.2020
MT16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
TR16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
GB24.02.2021
IE24.02.2021
LU24.02.2021
BE28.02.2021
CH28.02.2021
FR28.02.2021
LI28.02.2021
[2024/41]
Former [2024/29]HU24.02.2015
AL16.09.2020
AT16.09.2020
CY16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
MK16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
TR16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
GB24.02.2021
IE24.02.2021
LU24.02.2021
BE28.02.2021
CH28.02.2021
FR28.02.2021
LI28.02.2021
Former [2024/22]HU24.02.2015
AL16.09.2020
AT16.09.2020
CY16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
MK16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
GB24.02.2021
IE24.02.2021
LU24.02.2021
BE28.02.2021
CH28.02.2021
FR28.02.2021
LI28.02.2021
Former [2023/30]HU24.02.2015
AL16.09.2020
AT16.09.2020
CY16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
GB24.02.2021
IE24.02.2021
LU24.02.2021
BE28.02.2021
CH28.02.2021
FR28.02.2021
LI28.02.2021
Former [2023/27]HU24.02.2015
AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
GB24.02.2021
IE24.02.2021
LU24.02.2021
BE28.02.2021
CH28.02.2021
FR28.02.2021
LI28.02.2021
Former [2022/34]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
GB24.02.2021
IE24.02.2021
LU24.02.2021
BE28.02.2021
CH28.02.2021
FR28.02.2021
LI28.02.2021
Former [2022/08]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
GB24.02.2021
IE24.02.2021
LU24.02.2021
CH28.02.2021
FR28.02.2021
LI28.02.2021
Former [2022/07]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
IE24.02.2021
LU24.02.2021
CH28.02.2021
FR28.02.2021
LI28.02.2021
Former [2021/48]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
LU24.02.2021
CH28.02.2021
LI28.02.2021
Former [2021/47]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
LU24.02.2021
CH28.02.2021
LI28.02.2021
Former [2021/41]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/37]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/36]AL16.09.2020
AT16.09.2020
CZ16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/28]AL16.09.2020
AT16.09.2020
CZ16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/25]AL16.09.2020
AT16.09.2020
CZ16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/23]AT16.09.2020
CZ16.09.2020
EE16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
PT18.01.2021
Former [2021/22]CZ16.09.2020
EE16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
PT18.01.2021
Former [2021/21]FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
RS16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
PT18.01.2021
Former [2021/20]FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
RS16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
Former [2021/18]FI16.09.2020
HR16.09.2020
LV16.09.2020
NL16.09.2020
RS16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
Former [2021/10]FI16.09.2020
HR16.09.2020
LV16.09.2020
RS16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
Former [2021/09]FI16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
Former [2021/08]FI16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
Former [2021/07]FI16.09.2020
NO16.12.2020
Documents cited:Search[XI]US4803423  (BOUTIGNY PIERRE-HENRI [FR]) [X] 1-4,6-13 * column 2, line 27 - column 4, line 21; figure 2 * [I] 5;
 [XI]WO2008019740  (ROHDE & SCHWARZ [DE], et al) [X] 1-4,6-13 * page 3, line 22 - line 29; figures 6-8 * * page 6, line 5 - line 28 * [I] 5;
 [A]US6870359  (SEKEL STEPHEN MARK [US]) [A] 1-13 * column 4, line 42 - column 11, line 38 *;
 [A]US2001028251  (OKAYASU TOSHIYUKI [JP]) [A] 1-13 * column 2, line 43 - column 4, line 58 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.