EP2921436 - TUBE BODY TRANSFER SYSTEM, TUBE BODY PRODUCTION DEVICE AND TUBE BODY TRANSFER METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.01.2018 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 27.01.2017 | ||
Former | Grant of patent is intended Status updated on 17.01.2017 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states PackSys Global AG Joweid Zentrum 1 8630 Rüti ZH / CH | [2015/39] | Inventor(s) | 01 /
Guidarelli, Sandro Honeggrainstrasse 3a 8630 Rüti / CH | 02 /
Meyer, Lukas Fabrikstrasse 39 8005 Zürich / CH | [2015/39] | Representative(s) | Patent- und Rechtsanwälte Behrmann Wagner PartG mbB Hegau-Tower Maggistraße 5 (11. OG) 78224 Singen / DE | [N/P] |
Former [2015/39] | Wagner, Kilian Behrmann Wagner Partnerschaftsgesellschaft mbB Patentanwälte Hegau-Tower Maggistrasse 5 (10. OG) 78224 Singen / DE | Application number, filing date | 15159574.1 | 18.03.2015 | [2015/39] | Priority number, date | DE201410103904 | 21.03.2014 Original published format: DE102014103904 | [2015/39] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP2921436 | Date: | 23.09.2015 | Language: | DE | [2015/39] | Type: | B1 Patent specification | No.: | EP2921436 | Date: | 01.03.2017 | Language: | DE | [2017/09] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 29.07.2015 | Classification | IPC: | B65G43/08, B29C31/00, B65G47/244, B65G47/84 | [2015/39] | CPC: |
B29C31/002 (EP);
B65G43/08 (EP);
B65G47/244 (EP);
B65G47/843 (EP);
B65G2201/0276 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/13] |
Former [2015/39] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | TUBENROHR-TRANSFERSYSTEM, TUBENROHRHERSTELLUNGSVORRICHTUNG SOWIE TUBENROHRTRANSFERVERFAHREN | [2016/41] | English: | TUBE BODY TRANSFER SYSTEM, TUBE BODY PRODUCTION DEVICE AND TUBE BODY TRANSFER METHOD | [2015/39] | French: | SYSTÈME DE TRANSFERT DE CORPS TUBULAIRE, DISPOSITIF DE FABRICATION DE CORPS TUBULAIRE ET PROCÉDÉ DE TRANSFERT DE CORPS TUBULAIRE | [2015/39] |
Former [2015/39] | Tubenrohr-Transfersystem, Tubenrohrherstellungsvorrichtung sowie Tubenrohrtransferverfahren | Examination procedure | 16.02.2016 | Amendment by applicant (claims and/or description) | 16.02.2016 | Examination requested [2016/13] | 15.09.2016 | Communication of intention to grant the patent | 12.01.2017 | Fee for grant paid | 12.01.2017 | Fee for publishing/printing paid | 12.01.2017 | Receipt of the translation of the claim(s) | Opposition(s) | 04.12.2017 | No opposition filed within time limit [2018/06] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 18.03.2015 | AL | 01.03.2017 | CY | 01.03.2017 | CZ | 01.03.2017 | DK | 01.03.2017 | EE | 01.03.2017 | ES | 01.03.2017 | FI | 01.03.2017 | HR | 01.03.2017 | IT | 01.03.2017 | LT | 01.03.2017 | LV | 01.03.2017 | MC | 01.03.2017 | MK | 01.03.2017 | MT | 01.03.2017 | NL | 01.03.2017 | PL | 01.03.2017 | RO | 01.03.2017 | RS | 01.03.2017 | SE | 01.03.2017 | SI | 01.03.2017 | SK | 01.03.2017 | SM | 01.03.2017 | TR | 01.03.2017 | IE | 18.03.2017 | LU | 18.03.2017 | BE | 31.03.2017 | NO | 01.06.2017 | GR | 02.06.2017 | IS | 01.07.2017 | PT | 03.07.2017 | [2020/34] |
Former [2020/15] | HU | 18.03.2015 | |
CY | 01.03.2017 | ||
CZ | 01.03.2017 | ||
DK | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
MK | 01.03.2017 | ||
MT | 01.03.2017 | ||
NL | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SI | 01.03.2017 | ||
SK | 01.03.2017 | ||
SM | 01.03.2017 | ||
TR | 01.03.2017 | ||
IE | 18.03.2017 | ||
LU | 18.03.2017 | ||
BE | 31.03.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
Former [2019/52] | HU | 18.03.2015 | |
CY | 01.03.2017 | ||
CZ | 01.03.2017 | ||
DK | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
MK | 01.03.2017 | ||
MT | 01.03.2017 | ||
NL | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SI | 01.03.2017 | ||
SK | 01.03.2017 | ||
SM | 01.03.2017 | ||
IE | 18.03.2017 | ||
LU | 18.03.2017 | ||
BE | 31.03.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
Former [2019/47] | HU | 18.03.2015 | |
CY | 01.03.2017 | ||
CZ | 01.03.2017 | ||
DK | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
MT | 01.03.2017 | ||
NL | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SI | 01.03.2017 | ||
SK | 01.03.2017 | ||
SM | 01.03.2017 | ||
IE | 18.03.2017 | ||
LU | 18.03.2017 | ||
BE | 31.03.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
Former [2019/31] | HU | 18.03.2015 | |
CZ | 01.03.2017 | ||
DK | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
MT | 01.03.2017 | ||
NL | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SI | 01.03.2017 | ||
SK | 01.03.2017 | ||
SM | 01.03.2017 | ||
IE | 18.03.2017 | ||
LU | 18.03.2017 | ||
BE | 31.03.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
Former [2018/43] | CZ | 01.03.2017 | |
DK | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
MT | 01.03.2017 | ||
NL | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SI | 01.03.2017 | ||
SK | 01.03.2017 | ||
SM | 01.03.2017 | ||
IE | 18.03.2017 | ||
LU | 18.03.2017 | ||
BE | 31.03.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
Former [2018/24] | CZ | 01.03.2017 | |
DK | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
NL | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SI | 01.03.2017 | ||
SK | 01.03.2017 | ||
SM | 01.03.2017 | ||
IE | 18.03.2017 | ||
LU | 18.03.2017 | ||
BE | 31.03.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
Former [2018/13] | CZ | 01.03.2017 | |
DK | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
NL | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SI | 01.03.2017 | ||
SK | 01.03.2017 | ||
SM | 01.03.2017 | ||
IE | 18.03.2017 | ||
LU | 18.03.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
Former [2018/10] | CZ | 01.03.2017 | |
DK | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
NL | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SK | 01.03.2017 | ||
SM | 01.03.2017 | ||
LU | 18.03.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
Former [2018/09] | CZ | 01.03.2017 | |
DK | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
NL | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SK | 01.03.2017 | ||
SM | 01.03.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
Former [2018/06] | CZ | 01.03.2017 | |
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
NL | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SK | 01.03.2017 | ||
SM | 01.03.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
Former [2017/51] | CZ | 01.03.2017 | |
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
NL | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SK | 01.03.2017 | ||
SM | 01.03.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
Former [2017/50] | CZ | 01.03.2017 | |
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
NL | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SK | 01.03.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
Former [2017/49] | CZ | 01.03.2017 | |
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
NL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SK | 01.03.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
Former [2017/48] | CZ | 01.03.2017 | |
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
NL | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
Former [2017/41] | ES | 01.03.2017 | |
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
NL | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | Documents cited: | Search | [IY]EP1739036 (SEIDEL HELMUT [DE]) [I] 1-11 * paragraph [0035] * * figures 1-3 * [Y] 14; | [YDA]EP1472062 (AISAPACK HOLDING SA [CH]) [YD] 14 * figures 1-5 * [A] 15,16; | [AD]US5871079 (NANNINI LUCIANO [IT], et al) [AD] 1 * figures 1-8 *; | [A]EP2108604 (OPM S P A [IT]) [A] 1 * the whole document *; | [A]WO2010108750 (BOSCH GMBH ROBERT [DE], et al) [A] 1 * the whole document *; | [AD]DE102008056797 (MAEGERLE KARL LIZENZ [MU]) [AD] 15,16 * the whole document * | by applicant | EP1472062 | US5871079 | EP0711719 | DE102008056797 |