blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2923991

EP2923991 - Train with a crane and a force transmission arm [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  05.01.2018
Database last updated on 22.08.2024
FormerThe patent has been granted
Status updated on  27.01.2017
FormerGrant of patent is intended
Status updated on  20.01.2017
Most recent event   Tooltip17.07.2020Lapse of the patent in a contracting state
New state(s): AL
published on 19.08.2020  [2020/34]
Applicant(s)For all designated states
KIROW ARDELT GmbH
Spinnereistrasse 13
04179 Leipzig / DE
[2015/40]
Inventor(s)01 / Enderlein, Thomas
c/o KIROW ARDELT GmbH
Spinnereistr. 13
04179 Leipzig / DE
02 / Köllner, Walter
c/o KIROW ARDELT GmbH
Spinnereistr. 13
04179 Leipzig / DE
03 / Koehne, Ludwig
c/o KIROW ARDELT GmbHSpinnereistr. 13
04179 Leipzig / DE
 [2015/40]
Representative(s)Witte, Weller & Partner Patentanwälte mbB
Postfach 10 54 62
70047 Stuttgart / DE
[2015/40]
Application number, filing date15159841.419.03.2015
[2015/40]
Priority number, dateDE20141010403324.03.2014         Original published format: DE102014104033
[2015/40]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP2923991
Date:30.09.2015
Language:DE
[2015/40]
Type: B1 Patent specification 
No.:EP2923991
Date:01.03.2017
Language:DE
[2017/09]
Search report(s)(Supplementary) European search report - dispatched on:EP21.07.2015
ClassificationIPC:B66C23/50, B66C23/74
[2015/40]
CPC:
B66C23/50 (EP,CN); B66C23/72 (CN); B66C23/74 (EP);
B66C2700/03 (CN)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/19]
Former [2015/40]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Schienenfahrzeug-Zug mit einem Kranaufbau und einem Kraftaufnahmearm[2015/40]
English:Train with a crane and a force transmission arm[2015/40]
French:Train comportant une grue et un bras de transmission de force[2015/40]
Examination procedure30.03.2016Amendment by applicant (claims and/or description)
30.03.2016Examination requested  [2016/19]
04.10.2016Communication of intention to grant the patent
19.01.2017Fee for grant paid
19.01.2017Fee for publishing/printing paid
19.01.2017Receipt of the translation of the claim(s)
Opposition(s)04.12.2017No opposition filed within time limit [2018/06]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL01.03.2017
CY01.03.2017
CZ01.03.2017
DK01.03.2017
EE01.03.2017
ES01.03.2017
FI01.03.2017
HR01.03.2017
LT01.03.2017
LV01.03.2017
MC01.03.2017
MK01.03.2017
MT01.03.2017
RO01.03.2017
RS01.03.2017
SI01.03.2017
SK01.03.2017
SM01.03.2017
IE19.03.2017
LU19.03.2017
BG01.06.2017
GR02.06.2017
IS01.07.2017
PT03.07.2017
[2020/34]
Former [2019/52]CY01.03.2017
CZ01.03.2017
DK01.03.2017
EE01.03.2017
ES01.03.2017
FI01.03.2017
HR01.03.2017
LT01.03.2017
LV01.03.2017
MC01.03.2017
MK01.03.2017
MT01.03.2017
RO01.03.2017
RS01.03.2017
SI01.03.2017
SK01.03.2017
SM01.03.2017
IE19.03.2017
LU19.03.2017
BG01.06.2017
GR02.06.2017
IS01.07.2017
PT03.07.2017
Former [2019/47]CY01.03.2017
CZ01.03.2017
DK01.03.2017
EE01.03.2017
ES01.03.2017
FI01.03.2017
HR01.03.2017
LT01.03.2017
LV01.03.2017
MC01.03.2017
MT01.03.2017
RO01.03.2017
RS01.03.2017
SI01.03.2017
SK01.03.2017
SM01.03.2017
IE19.03.2017
LU19.03.2017
BG01.06.2017
GR02.06.2017
IS01.07.2017
PT03.07.2017
Former [2018/43]CZ01.03.2017
DK01.03.2017
EE01.03.2017
ES01.03.2017
FI01.03.2017
HR01.03.2017
LT01.03.2017
LV01.03.2017
MC01.03.2017
MT01.03.2017
RO01.03.2017
RS01.03.2017
SI01.03.2017
SK01.03.2017
SM01.03.2017
IE19.03.2017
LU19.03.2017
BG01.06.2017
GR02.06.2017
IS01.07.2017
PT03.07.2017
Former [2018/13]CZ01.03.2017
DK01.03.2017
EE01.03.2017
ES01.03.2017
FI01.03.2017
HR01.03.2017
LT01.03.2017
LV01.03.2017
MC01.03.2017
RO01.03.2017
RS01.03.2017
SI01.03.2017
SK01.03.2017
SM01.03.2017
IE19.03.2017
LU19.03.2017
BG01.06.2017
GR02.06.2017
IS01.07.2017
PT03.07.2017
Former [2018/10]CZ01.03.2017
DK01.03.2017
EE01.03.2017
ES01.03.2017
FI01.03.2017
HR01.03.2017
LT01.03.2017
LV01.03.2017
MC01.03.2017
RO01.03.2017
RS01.03.2017
SK01.03.2017
SM01.03.2017
LU19.03.2017
BG01.06.2017
GR02.06.2017
IS01.07.2017
PT03.07.2017
Former [2018/09]CZ01.03.2017
DK01.03.2017
EE01.03.2017
ES01.03.2017
FI01.03.2017
HR01.03.2017
LT01.03.2017
LV01.03.2017
MC01.03.2017
RO01.03.2017
RS01.03.2017
SK01.03.2017
SM01.03.2017
BG01.06.2017
GR02.06.2017
IS01.07.2017
PT03.07.2017
Former [2018/06]CZ01.03.2017
EE01.03.2017
ES01.03.2017
FI01.03.2017
HR01.03.2017
LT01.03.2017
LV01.03.2017
MC01.03.2017
RO01.03.2017
RS01.03.2017
SK01.03.2017
SM01.03.2017
BG01.06.2017
GR02.06.2017
IS01.07.2017
PT03.07.2017
Former [2017/51]CZ01.03.2017
EE01.03.2017
ES01.03.2017
FI01.03.2017
HR01.03.2017
LT01.03.2017
LV01.03.2017
RO01.03.2017
RS01.03.2017
SK01.03.2017
SM01.03.2017
BG01.06.2017
GR02.06.2017
IS01.07.2017
PT03.07.2017
Former [2017/49]CZ01.03.2017
EE01.03.2017
ES01.03.2017
FI01.03.2017
HR01.03.2017
LT01.03.2017
LV01.03.2017
RO01.03.2017
RS01.03.2017
SK01.03.2017
BG01.06.2017
GR02.06.2017
IS01.07.2017
Former [2017/48]CZ01.03.2017
ES01.03.2017
FI01.03.2017
HR01.03.2017
LT01.03.2017
LV01.03.2017
RS01.03.2017
BG01.06.2017
GR02.06.2017
Former [2017/41]ES01.03.2017
FI01.03.2017
HR01.03.2017
LT01.03.2017
LV01.03.2017
RS01.03.2017
BG01.06.2017
GR02.06.2017
Documents cited:Search[X]CH686433  (SADLER WILFRIED [CH]) [X] 1,2,4-9,13,14 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.