EP2930009 - PROCESS FOR THE PRINTING OF A MULTICOMPONENT-SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.11.2019 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 14.12.2018 | ||
Former | Grant of patent is intended Status updated on 26.08.2018 | ||
Former | Examination is in progress Status updated on 02.06.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Covestro Deutschland AG Kaiser-Wilhelm-Allee 60 51373 Leverkusen / DE | [2015/44] | Inventor(s) | 01 /
TILLACK, Jörg Dr. Friedenstrasse 21 42699 Solingen / DE | 02 /
ACHTEN, Dirk Dr. Salamanderweg 43 51375 Leverkusen / DE | 03 /
BÜSGEN, Thomas Dr. Düsseldorfer Str. 165 51063 Köln / DE | 04 /
GERTZMANN, Rolf Dr. Karl-Jaspers-Str. 57 51377 Leverkusen / DE | 05 /
WAGNER, Roland Weißdornweg 18 51375 Leverkusen / DE | 06 /
SCHUSTER, Fabian Eupener Strasse 13 70374 Stuttgart / DE | 07 /
EIDEN, Stefanie Dr. Heinrich-Böll-Str. 42 51371 Leverkusen / DE | 08 /
STEFFENS, Ingo Frischenberg 41 51379 Leverkusen / DE | [2015/48] |
Former [2015/42] | 01 /
TILLACK, Jörg Dr. Friedenstrasse 21 42699 Solingen / DE | ||
02 /
ACHTEN, Dirk Dr. Salamanderweg 43 51375 Leverkusen / DE | |||
03 /
BÜSGEN, Thomas Dr. Düsseldorfer Str. 165 51063 Köln / DE | |||
04 /
GERTZMANN, Rolf Dr. Karl-Jaspers-Str. 57 51377 Leverkusen / DE | |||
05 /
WAGNER, Roland Weißdornweg 18 51375 Leverkusen / DE | |||
06 /
SCHUSTER, Fabian Großglocknerstraße 16 70327 Stuttgart / DE | |||
07 /
EIDEN, Stefanie Dr. Heinrich-Böll-Str. 42 51371 Leverkusen / DE | |||
08 /
STEFFENS, Ingo Frischenberg 41 51379 Leverkusen / DE | Representative(s) | Levpat c/o Covestro AG Gebäude 4825 51365 Leverkusen / DE | [2019/03] |
Former [2015/42] | Levpat c/o Covestro AG Alfred-Nobel-Straße 10 40789 Monheim am Rhein / DE | Application number, filing date | 15162611.6 | 07.04.2015 | [2015/42] | Priority number, date | EP20140163670 | 07.04.2014 Original published format: EP 14163670 | [2015/42] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | EP2930009 | Date: | 14.10.2015 | Language: | DE | [2015/42] | Type: | A3 Search report | No.: | EP2930009 | Date: | 09.12.2015 | Language: | DE | [2015/50] | Type: | B1 Patent specification | No.: | EP2930009 | Date: | 16.01.2019 | Language: | DE | [2019/03] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 05.11.2015 | Classification | IPC: | B29C64/112, B41M1/26, B41M3/16, C08G18/32, C08G18/38, C08G18/42, C08G18/79, C09D175/02, B41M5/00, C09D11/102, C09D11/322, B33Y70/00, // B29K75/00 | [2018/38] | CPC: |
C08G18/3821 (EP,US);
B29C64/112 (EP);
B33Y70/00 (EP,US);
B41M3/16 (EP);
B41M5/0023 (EP);
C08G18/3206 (EP);
C08G18/325 (EP);
C08G18/42 (EP);
C08G18/792 (EP);
C08G18/798 (EP);
C09D11/102 (EP);
C09D11/322 (EP);
|
Former IPC [2015/50] | B29C67/00, B29C67/24, B41M1/26, B41M3/16, C08G18/32, C08G18/38, C08G18/42, C08G18/79, C09D175/02 | ||
Former IPC [2015/42] | B29C67/00, B41M1/26, B41M3/16, C08G18/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/29] |
Former [2015/42] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUM VERDRUCKEN EINES MEHRKOMPONENTENSYSTEMS | [2015/42] | English: | PROCESS FOR THE PRINTING OF A MULTICOMPONENT-SYSTEM | [2015/42] | French: | PROCÉDÉ D'IMPRESSION D'UN SYSTÈME À PLUSIEURS COMPOSANTS | [2015/42] | Examination procedure | 03.06.2016 | Amendment by applicant (claims and/or description) | 09.06.2016 | Examination requested [2016/29] | 02.06.2017 | Despatch of a communication from the examining division (Time limit: M06) | 10.11.2017 | Reply to a communication from the examining division | 11.04.2018 | Despatch of a communication from the examining division (Time limit: M04) | 31.07.2018 | Reply to a communication from the examining division | 27.08.2018 | Communication of intention to grant the patent | 06.12.2018 | Fee for grant paid | 06.12.2018 | Fee for publishing/printing paid | 06.12.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 17.10.2019 | No opposition filed within time limit [2019/52] | Fees paid | Renewal fee | 10.04.2017 | Renewal fee patent year 03 | 11.04.2018 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.04.2015 | AL | 16.01.2019 | CY | 16.01.2019 | CZ | 16.01.2019 | DK | 16.01.2019 | EE | 16.01.2019 | ES | 16.01.2019 | FI | 16.01.2019 | HR | 16.01.2019 | LT | 16.01.2019 | LV | 16.01.2019 | MC | 16.01.2019 | MK | 16.01.2019 | MT | 16.01.2019 | NL | 16.01.2019 | PL | 16.01.2019 | RO | 16.01.2019 | RS | 16.01.2019 | SE | 16.01.2019 | SI | 16.01.2019 | SK | 16.01.2019 | SM | 16.01.2019 | TR | 16.01.2019 | IE | 07.04.2019 | LU | 07.04.2019 | BG | 16.04.2019 | NO | 16.04.2019 | GR | 17.04.2019 | BE | 30.04.2019 | CH | 30.04.2019 | LI | 30.04.2019 | IS | 16.05.2019 | PT | 16.05.2019 | [2022/31] |
Former [2021/34] | HU | 07.04.2015 | |
AL | 16.01.2019 | ||
CY | 16.01.2019 | ||
CZ | 16.01.2019 | ||
DK | 16.01.2019 | ||
EE | 16.01.2019 | ||
ES | 16.01.2019 | ||
FI | 16.01.2019 | ||
HR | 16.01.2019 | ||
LT | 16.01.2019 | ||
LV | 16.01.2019 | ||
MC | 16.01.2019 | ||
MT | 16.01.2019 | ||
NL | 16.01.2019 | ||
PL | 16.01.2019 | ||
RO | 16.01.2019 | ||
RS | 16.01.2019 | ||
SE | 16.01.2019 | ||
SI | 16.01.2019 | ||
SK | 16.01.2019 | ||
SM | 16.01.2019 | ||
TR | 16.01.2019 | ||
IE | 07.04.2019 | ||
LU | 07.04.2019 | ||
BG | 16.04.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
BE | 30.04.2019 | ||
CH | 30.04.2019 | ||
LI | 30.04.2019 | ||
IS | 16.05.2019 | ||
PT | 16.05.2019 | ||
Former [2021/32] | HU | 07.04.2015 | |
AL | 16.01.2019 | ||
CY | 16.01.2019 | ||
CZ | 16.01.2019 | ||
DK | 16.01.2019 | ||
EE | 16.01.2019 | ||
ES | 16.01.2019 | ||
FI | 16.01.2019 | ||
HR | 16.01.2019 | ||
LT | 16.01.2019 | ||
LV | 16.01.2019 | ||
MC | 16.01.2019 | ||
NL | 16.01.2019 | ||
PL | 16.01.2019 | ||
RO | 16.01.2019 | ||
RS | 16.01.2019 | ||
SE | 16.01.2019 | ||
SI | 16.01.2019 | ||
SK | 16.01.2019 | ||
SM | 16.01.2019 | ||
TR | 16.01.2019 | ||
IE | 07.04.2019 | ||
LU | 07.04.2019 | ||
BG | 16.04.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
BE | 30.04.2019 | ||
CH | 30.04.2019 | ||
LI | 30.04.2019 | ||
IS | 16.05.2019 | ||
PT | 16.05.2019 | ||
Former [2021/26] | AL | 16.01.2019 | |
CY | 16.01.2019 | ||
CZ | 16.01.2019 | ||
DK | 16.01.2019 | ||
EE | 16.01.2019 | ||
ES | 16.01.2019 | ||
FI | 16.01.2019 | ||
HR | 16.01.2019 | ||
LT | 16.01.2019 | ||
LV | 16.01.2019 | ||
MC | 16.01.2019 | ||
NL | 16.01.2019 | ||
PL | 16.01.2019 | ||
RO | 16.01.2019 | ||
RS | 16.01.2019 | ||
SE | 16.01.2019 | ||
SI | 16.01.2019 | ||
SK | 16.01.2019 | ||
SM | 16.01.2019 | ||
TR | 16.01.2019 | ||
IE | 07.04.2019 | ||
LU | 07.04.2019 | ||
BG | 16.04.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
BE | 30.04.2019 | ||
CH | 30.04.2019 | ||
LI | 30.04.2019 | ||
IS | 16.05.2019 | ||
PT | 16.05.2019 | ||
Former [2020/21] | AL | 16.01.2019 | |
CZ | 16.01.2019 | ||
DK | 16.01.2019 | ||
EE | 16.01.2019 | ||
ES | 16.01.2019 | ||
FI | 16.01.2019 | ||
HR | 16.01.2019 | ||
LT | 16.01.2019 | ||
LV | 16.01.2019 | ||
MC | 16.01.2019 | ||
NL | 16.01.2019 | ||
PL | 16.01.2019 | ||
RO | 16.01.2019 | ||
RS | 16.01.2019 | ||
SE | 16.01.2019 | ||
SI | 16.01.2019 | ||
SK | 16.01.2019 | ||
SM | 16.01.2019 | ||
TR | 16.01.2019 | ||
IE | 07.04.2019 | ||
LU | 07.04.2019 | ||
BG | 16.04.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
BE | 30.04.2019 | ||
CH | 30.04.2019 | ||
LI | 30.04.2019 | ||
IS | 16.05.2019 | ||
PT | 16.05.2019 | ||
Former [2020/17] | AL | 16.01.2019 | |
CZ | 16.01.2019 | ||
DK | 16.01.2019 | ||
EE | 16.01.2019 | ||
ES | 16.01.2019 | ||
FI | 16.01.2019 | ||
HR | 16.01.2019 | ||
LT | 16.01.2019 | ||
LV | 16.01.2019 | ||
MC | 16.01.2019 | ||
NL | 16.01.2019 | ||
PL | 16.01.2019 | ||
RO | 16.01.2019 | ||
RS | 16.01.2019 | ||
SE | 16.01.2019 | ||
SI | 16.01.2019 | ||
SK | 16.01.2019 | ||
SM | 16.01.2019 | ||
TR | 16.01.2019 | ||
LU | 07.04.2019 | ||
BG | 16.04.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
BE | 30.04.2019 | ||
CH | 30.04.2019 | ||
LI | 30.04.2019 | ||
IS | 16.05.2019 | ||
PT | 16.05.2019 | ||
Former [2020/11] | AL | 16.01.2019 | |
CZ | 16.01.2019 | ||
DK | 16.01.2019 | ||
EE | 16.01.2019 | ||
ES | 16.01.2019 | ||
FI | 16.01.2019 | ||
HR | 16.01.2019 | ||
LT | 16.01.2019 | ||
LV | 16.01.2019 | ||
MC | 16.01.2019 | ||
NL | 16.01.2019 | ||
PL | 16.01.2019 | ||
RO | 16.01.2019 | ||
RS | 16.01.2019 | ||
SE | 16.01.2019 | ||
SI | 16.01.2019 | ||
SK | 16.01.2019 | ||
SM | 16.01.2019 | ||
LU | 07.04.2019 | ||
BG | 16.04.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
BE | 30.04.2019 | ||
CH | 30.04.2019 | ||
LI | 30.04.2019 | ||
IS | 16.05.2019 | ||
PT | 16.05.2019 | ||
Former [2020/04] | AL | 16.01.2019 | |
CZ | 16.01.2019 | ||
DK | 16.01.2019 | ||
EE | 16.01.2019 | ||
ES | 16.01.2019 | ||
FI | 16.01.2019 | ||
HR | 16.01.2019 | ||
LT | 16.01.2019 | ||
LV | 16.01.2019 | ||
MC | 16.01.2019 | ||
NL | 16.01.2019 | ||
PL | 16.01.2019 | ||
RO | 16.01.2019 | ||
RS | 16.01.2019 | ||
SE | 16.01.2019 | ||
SK | 16.01.2019 | ||
SM | 16.01.2019 | ||
LU | 07.04.2019 | ||
BG | 16.04.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
IS | 16.05.2019 | ||
PT | 16.05.2019 | ||
Former [2020/02] | AL | 16.01.2019 | |
CZ | 16.01.2019 | ||
DK | 16.01.2019 | ||
EE | 16.01.2019 | ||
ES | 16.01.2019 | ||
FI | 16.01.2019 | ||
HR | 16.01.2019 | ||
LT | 16.01.2019 | ||
LV | 16.01.2019 | ||
MC | 16.01.2019 | ||
NL | 16.01.2019 | ||
PL | 16.01.2019 | ||
RO | 16.01.2019 | ||
RS | 16.01.2019 | ||
SE | 16.01.2019 | ||
SK | 16.01.2019 | ||
SM | 16.01.2019 | ||
BG | 16.04.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
IS | 16.05.2019 | ||
PT | 16.05.2019 | ||
Former [2019/51] | AL | 16.01.2019 | |
CZ | 16.01.2019 | ||
DK | 16.01.2019 | ||
EE | 16.01.2019 | ||
ES | 16.01.2019 | ||
FI | 16.01.2019 | ||
HR | 16.01.2019 | ||
LT | 16.01.2019 | ||
LV | 16.01.2019 | ||
NL | 16.01.2019 | ||
PL | 16.01.2019 | ||
RO | 16.01.2019 | ||
RS | 16.01.2019 | ||
SE | 16.01.2019 | ||
SK | 16.01.2019 | ||
SM | 16.01.2019 | ||
BG | 16.04.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
IS | 16.05.2019 | ||
PT | 16.05.2019 | ||
Former [2019/49] | AL | 16.01.2019 | |
CZ | 16.01.2019 | ||
DK | 16.01.2019 | ||
EE | 16.01.2019 | ||
ES | 16.01.2019 | ||
FI | 16.01.2019 | ||
HR | 16.01.2019 | ||
LT | 16.01.2019 | ||
LV | 16.01.2019 | ||
NL | 16.01.2019 | ||
PL | 16.01.2019 | ||
RO | 16.01.2019 | ||
RS | 16.01.2019 | ||
SE | 16.01.2019 | ||
SK | 16.01.2019 | ||
BG | 16.04.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
IS | 16.05.2019 | ||
PT | 16.05.2019 | ||
Former [2019/48] | DK | 16.01.2019 | |
ES | 16.01.2019 | ||
FI | 16.01.2019 | ||
HR | 16.01.2019 | ||
LT | 16.01.2019 | ||
LV | 16.01.2019 | ||
NL | 16.01.2019 | ||
PL | 16.01.2019 | ||
RS | 16.01.2019 | ||
SE | 16.01.2019 | ||
BG | 16.04.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
IS | 16.05.2019 | ||
PT | 16.05.2019 | ||
Former [2019/39] | ES | 16.01.2019 | |
FI | 16.01.2019 | ||
HR | 16.01.2019 | ||
LT | 16.01.2019 | ||
LV | 16.01.2019 | ||
NL | 16.01.2019 | ||
PL | 16.01.2019 | ||
RS | 16.01.2019 | ||
SE | 16.01.2019 | ||
BG | 16.04.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
IS | 16.05.2019 | ||
PT | 16.05.2019 | ||
Former [2019/38] | ES | 16.01.2019 | |
FI | 16.01.2019 | ||
LT | 16.01.2019 | ||
NL | 16.01.2019 | ||
PL | 16.01.2019 | ||
SE | 16.01.2019 | ||
BG | 16.04.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
PT | 16.05.2019 | ||
Former [2019/37] | ES | 16.01.2019 | |
FI | 16.01.2019 | ||
LT | 16.01.2019 | ||
NL | 16.01.2019 | ||
PL | 16.01.2019 | ||
SE | 16.01.2019 | ||
NO | 16.04.2019 | ||
GR | 17.04.2019 | ||
PT | 16.05.2019 | ||
Former [2019/35] | ES | 16.01.2019 | |
FI | 16.01.2019 | ||
LT | 16.01.2019 | ||
NL | 16.01.2019 | ||
PL | 16.01.2019 | ||
SE | 16.01.2019 | ||
NO | 16.04.2019 | ||
PT | 16.05.2019 | ||
Former [2019/34] | FI | 16.01.2019 | |
LT | 16.01.2019 | ||
NL | 16.01.2019 | ||
SE | 16.01.2019 | ||
NO | 16.04.2019 | ||
PT | 16.05.2019 | ||
Former [2019/33] | FI | 16.01.2019 | |
LT | 16.01.2019 | ||
NL | 16.01.2019 | ||
NO | 16.04.2019 | ||
PT | 16.05.2019 | ||
Former [2019/30] | NL | 16.01.2019 | Documents cited: | Search | [X]EP0403921 (BAYER AG [DE]) [X] 1-17 * page 1, line 1 - page 2, line 48 * * page 5, lines 12-35 * * page 6, lines 11-25,35-57 * * page 7, line 54 - page 8, line 30 * * abstract *; | [XD]DE19937770 (BAYER AG [DE]) [XD] 1-17* the whole document *; | [X]US2003118739 (LI ZHICHENG [US], et al) [X] 1-17 * paragraphs [0001] , [0007] - [0014] - [0016] - [0019] - [0022] , [0026] , [0031] , [0047] - [0049] * * abstract *; | [X]US2005075477 (ROESLER RICHARD R [US], et al) [X] 1-17 * paragraphs [0001] , [0002] , [0010] - [0020] - [0036] , [0046] - [0056] - [0062] - [0064] * * abstract *; | [XD]WO2005113219 (UNIV BERLIN TECH [DE], et al) [XD] 1-17 * the whole document *; | [X]DE102008024352 (BAYER MATERIALSCIENCE AG [DE]) [X] 1-17 * paragraphs [0002] , [0003] , [0015] , [0048] - [0060] - [0065] - [0068] *; | [X]WO2013165946 (DU PONT [US]) [X] 1-17 * page 1, lines 8-27 * * page 14, line 27 - page 18, line 24 * * examples 2-11; tables 1,2 * | by applicant | DE1670666 | EP0403921 | EP0649866 | JPH07118263 | EP0798299 | DE19937770 | WO2005113219 | EP1640394 | - J. PRAKT. CHEM., (1994), vol. 336, pages 185 - 200 | - Römpp Chemie Lexikon, GEORG THIEME VERLAG |