Extract from the Register of European Patents

EP About this file: EP3089552

EP3089552 - DC LOW VOLTAGE POWER DISTRIBUTION UNIT AND SYSTEM FOR A POWER GRID [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  04.02.2022
Database last updated on 11.04.2026
FormerThe patent has been granted
Status updated on  26.02.2021
FormerGrant of patent is intended
Status updated on  09.11.2020
FormerExamination is in progress
Status updated on  11.07.2019
FormerRequest for examination was made
Status updated on  12.05.2017
Most recent event   Tooltip19.12.2025Lapse of the patent in a contracting state
New state(s): TR
published on 21.01.2026  [2026/04]
Applicant(s)For all designated states
TE Connectivity Nederland B.V.
Rietveldenweg 32
5222 AR 's Hertogenbosch / NL
[2016/44]
Inventor(s)01 / Dendas, Freddy
Turfstraat 152
3600 Genk / BE
02 / Vermeulen, Mark
Schouts Wernertslaan 19
5673 RL Nuenen / NL
 [2016/44]
Representative(s)Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstraße 4
80802 München / DE
[2016/44]
Application number, filing date15165574.329.04.2015
[2016/44]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3089552
Date:02.11.2016
Language:EN
[2016/44]
Type: B1 Patent specification 
No.:EP3089552
Date:31.03.2021
Language:EN
[2021/13]
Search report(s)(Supplementary) European search report - dispatched on:EP18.11.2015
ClassificationIPC:H05B45/37
[2020/48]
CPC:
H05B45/3725 (EP,US); H05B45/37 (US); H05B47/20 (EP);
H05B45/50 (EP,US)
Former IPC [2016/44]H05B33/08
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/24]
Former [2016/44]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERTEILUNGSEINHEIT UND -SYSTEM VON GLEICHSTROM-NIEDERSPANNUNGS-STROM UND SYSTEM FÜR STROMNETZ[2016/44]
English:DC LOW VOLTAGE POWER DISTRIBUTION UNIT AND SYSTEM FOR A POWER GRID[2016/44]
French:DISTRIBUTION DE PUISSANCE BASSE TENSION À COURANT CONTINU ET SYSTÈME POUR UN RÉSEAU ÉLECTRIQUE[2016/44]
Examination procedure29.04.2015Date on which the examining division has become responsible
02.05.2017Amendment by applicant (claims and/or description)
02.05.2017Examination requested  [2017/24]
15.07.2019Despatch of a communication from the examining division (Time limit: M06)
09.01.2020Reply to a communication from the examining division
20.10.2020Cancellation of oral proceeding that was planned for 24.11.2020
10.11.2020Communication of intention to grant the patent
24.11.2020Date of oral proceedings (cancelled)
18.02.2021Fee for grant paid
18.02.2021Fee for publishing/printing paid
18.02.2021Receipt of the translation of the claim(s)
Opposition(s)04.01.2022No opposition filed within time limit [2022/10]
Fees paidRenewal fee
27.04.2017Renewal fee patent year 03
11.04.2018Renewal fee patent year 04
15.04.2019Renewal fee patent year 05
31.03.2020Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU29.04.2015
AL31.03.2021
AT31.03.2021
CY31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
GR31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
MK31.03.2021
MT31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
TR31.03.2021
IE29.04.2021
LU29.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
[2026/04]
Former [2024/41]HU29.04.2015
AL31.03.2021
AT31.03.2021
CY31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
GR31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
MK31.03.2021
MT31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
IE29.04.2021
LU29.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2024/22]HU29.04.2015
AL31.03.2021
AT31.03.2021
CY31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
GR31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
MK31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
IE29.04.2021
LU29.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2023/36]HU29.04.2015
AL31.03.2021
AT31.03.2021
CY31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
GR31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
IE29.04.2021
LU29.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2023/30]HU29.04.2015
AL31.03.2021
AT31.03.2021
CY31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
IE29.04.2021
LU29.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2023/29]HU29.04.2015
AL31.03.2021
AT31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
IE29.04.2021
LU29.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/36]AL31.03.2021
AT31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
IE29.04.2021
LU29.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/34]AL31.03.2021
AT31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
IE29.04.2021
LU29.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/29]AL31.03.2021
AT31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
IE29.04.2021
LU29.04.2021
CH30.04.2021
LI30.04.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/23]AL31.03.2021
AT31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SK31.03.2021
SM31.03.2021
IE29.04.2021
LU29.04.2021
CH30.04.2021
LI30.04.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/21]AL31.03.2021
AT31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SK31.03.2021
SM31.03.2021
IE29.04.2021
LU29.04.2021
CH30.04.2021
LI30.04.2021
BG30.06.2021
NO30.06.2021
PT02.08.2021
IS24.12.2021
Former [2022/10]AL31.03.2021
AT31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SK31.03.2021
SM31.03.2021
LU29.04.2021
CH30.04.2021
LI30.04.2021
BG30.06.2021
NO30.06.2021
PT02.08.2021
IS24.12.2021
Former [2022/08]AL31.03.2021
AT31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SK31.03.2021
SM31.03.2021
LU29.04.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/07]AL31.03.2021
AT31.03.2021
CZ31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SK31.03.2021
SM31.03.2021
LU29.04.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/04]AT31.03.2021
CZ31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SK31.03.2021
SM31.03.2021
LU29.04.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2021/52]AT31.03.2021
CZ31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2021/51]AT31.03.2021
CZ31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2021/50]AT31.03.2021
CZ31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
PT02.08.2021
Former [2021/48]AT31.03.2021
CZ31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
RS31.03.2021
SE31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/47]AT31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
RS31.03.2021
SE31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/46]AT31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
RS31.03.2021
SE31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/38]FI31.03.2021
HR31.03.2021
LV31.03.2021
RS31.03.2021
SE31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/37]FI31.03.2021
HR31.03.2021
LV31.03.2021
RS31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/36]FI31.03.2021
HR31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/35]FI31.03.2021
HR31.03.2021
NO30.06.2021
Former [2021/33]FI31.03.2021
NO30.06.2021
Documents cited:Search[XYI] US2010244736  (BAXTER COLIN et al.)
 [XYI] US2011018464  (LO HONHUNG et al.)
 [XY] US2010280676  (PABON GUS CHARLES et al.)
 [XYI] CN202941009  (SALICRU ENERGY TECHNOLOGY JIANGSU CO LTD et al.)
 [XYI] CN2086003  (LIU XIAOLU et al.) [X] 1-4,8-12 * abstract * * page 1, paragraphs 1, 6-18 * * page 1, paragraph 25 - page 3, paragraph 42 * * page 4, paragraphs 45-51 *[Y] 5-7,14 [I] 13,15
 [XYI] EP2846611  (TRIDONIC GMBH & CO KG et al.) [X] 1-3 * the whole document *[Y] 5-7,14 [I] 4,8-13,15
ExaminationAU2013204215
by applicant  "UL 1310", 26 August 2011
   "UL1012", 9 November 2010, article "Underwriter Laboratories (UL) Standard Power Units Other Than Class 2"
   "UL1310", 26 August 2011, article "Underwriter Laboratories (UL) Standard for Class 2 Power Units"
   "UL1310", 26 August 2011
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.