blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3090888

EP3090888 - A TOWING HITCH ASSEMBLY AND A TOWING SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  16.10.2020
Database last updated on 28.09.2024
FormerThe patent has been granted
Status updated on  08.11.2019
FormerGrant of patent is intended
Status updated on  25.06.2019
FormerRequest for examination was made
Status updated on  12.05.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Toyota Material Handling Manufacturing Sweden AB
595 81 Mjölby / SE
[2017/25]
Former [2016/45]For all designated states
BT Products AB
595 81 Mjölby / SE
Inventor(s)01 / Arvidsson Klint, Jakob
Sankt Persgatan 20
595 51 Mjölby / SE
 [2016/45]
Representative(s)Zacco Sweden AB
P.O. Box 5581
Löjtnantsgatan 21
114 85 Stockholm / SE
[N/P]
Former [2016/45]Zacco Sweden AB
P.O. Box 5581
114 85 Stockholm / SE
Application number, filing date15166263.204.05.2015
[2016/45]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3090888
Date:09.11.2016
Language:EN
[2016/45]
Type: B1 Patent specification 
No.:EP3090888
Date:11.12.2019
Language:EN
[2019/50]
Search report(s)(Supplementary) European search report - dispatched on:EP30.10.2015
ClassificationIPC:B60D1/36, B60D1/48, B60D3/00, B60D1/00
[2016/45]
CPC:
B60D1/36 (EP); B60D1/01 (CN); B60D1/243 (CN);
B60D1/34 (CN); B60D1/485 (EP); B60D3/00 (EP);
B60D2001/005 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/24]
Former [2016/45]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ANHÄNGEKUPPLUNGSANORDNUNG UND ANHÄNGESYSTEM[2016/45]
English:A TOWING HITCH ASSEMBLY AND A TOWING SYSTEM[2016/45]
French:ENSEMBLE D'ATTELAGE DE REMORQUAGE ET SYSTÈME DE REMORQUAGE[2016/45]
Examination procedure04.05.2015Date on which the examining division has become responsible
03.05.2017Amendment by applicant (claims and/or description)
03.05.2017Examination requested  [2017/24]
26.06.2019Communication of intention to grant the patent
22.10.2019Fee for grant paid
22.10.2019Fee for publishing/printing paid
22.10.2019Receipt of the translation of the claim(s)
Opposition(s)14.09.2020No opposition filed within time limit [2020/47]
Fees paidRenewal fee
10.05.2017Renewal fee patent year 03
30.05.2018Renewal fee patent year 04
29.05.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU04.05.2015
AL11.12.2019
AT11.12.2019
CY11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
IT11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
MK11.12.2019
MT11.12.2019
NL11.12.2019
PL11.12.2019
RO11.12.2019
RS11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
TR11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IS11.04.2020
IE04.05.2020
LU04.05.2020
PT06.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
[2022/32]
Former [2022/27]HU04.05.2015
AL11.12.2019
AT11.12.2019
CY11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
IT11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
MT11.12.2019
NL11.12.2019
PL11.12.2019
RO11.12.2019
RS11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
TR11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IS11.04.2020
IE04.05.2020
LU04.05.2020
PT06.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
Former [2021/24]AL11.12.2019
AT11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
IT11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
NL11.12.2019
PL11.12.2019
RO11.12.2019
RS11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IS11.04.2020
IE04.05.2020
LU04.05.2020
PT06.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
Former [2021/20]AL11.12.2019
AT11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
IT11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
NL11.12.2019
PL11.12.2019
RO11.12.2019
RS11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IS11.04.2020
IE04.05.2020
LU04.05.2020
PT06.05.2020
CH31.05.2020
LI31.05.2020
Former [2021/15]AL11.12.2019
AT11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
IT11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
NL11.12.2019
PL11.12.2019
RO11.12.2019
RS11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IS11.04.2020
LU04.05.2020
PT06.05.2020
CH31.05.2020
LI31.05.2020
Former [2021/10]AL11.12.2019
AT11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
IT11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
NL11.12.2019
PL11.12.2019
RO11.12.2019
RS11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
CH31.05.2020
LI31.05.2020
Former [2021/07]AL11.12.2019
AT11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
NL11.12.2019
RO11.12.2019
RS11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
CH31.05.2020
LI31.05.2020
Former [2020/51]AL11.12.2019
AT11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
NL11.12.2019
RO11.12.2019
RS11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
Former [2020/47]AL11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
NL11.12.2019
RO11.12.2019
RS11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
Former [2020/40]AL11.12.2019
CZ11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
NL11.12.2019
RO11.12.2019
RS11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
Former [2020/37]AL11.12.2019
CZ11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
NL11.12.2019
RO11.12.2019
RS11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
PT06.05.2020
Former [2020/36]AL11.12.2019
CZ11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
NL11.12.2019
RO11.12.2019
RS11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
PT06.05.2020
Former [2020/35]AL11.12.2019
CZ11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
NL11.12.2019
RO11.12.2019
RS11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
Former [2020/34]AL11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
NL11.12.2019
RS11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
Former [2020/32]AL11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
NL11.12.2019
RS11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
Former [2020/25]FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
RS11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
Former [2020/23]FI11.12.2019
LT11.12.2019
LV11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
Former [2020/22]FI11.12.2019
LT11.12.2019
BG11.03.2020
NO11.03.2020
Former [2020/21]NO11.03.2020
Documents cited:Search[X]US2467816  (CUTSINGER RUSSELL M, et al) [X] 1,2,4-7,9-12,15-17 * column 1, line 1 - line 11 * * column 1, line 45 - column 2, line 42 * * figures 1,2,3 *;
 [I]US6394481  (PINLAM WATCHARIN [TH], et al) [I] 1,2,4-7,9-12,15-17 * column 1, line 1 - line 10 * * column 2, line 28 - column 4, line 32 ** figures 1,2,3,4,6 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.