blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3091365

EP3091365 - METHOD FOR ANALYZING THE RF PERFORMANCE OF A PROBE CARD, DETECTOR ASSEMBLY AND SYSTEM FOR ANALYZING THE RF PERFORMANCE OF A PROBE CARD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.02.2021
Database last updated on 24.08.2024
FormerThe patent has been granted
Status updated on  21.02.2020
FormerGrant of patent is intended
Status updated on  16.10.2019
FormerExamination is in progress
Status updated on  27.07.2018
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Aps Solutions GmbH
Gutenbergstr. 1
82178 Puchheim / DE
For all designated states
BE Precision Technology
Industrieweg 47
8071 SC Nunspeet / NL
[2016/45]
Inventor(s)01 / O'Neil, Paul
25 Bridgemere Road
Eastbourne
East Essex BN22 8UB / GB
02 / Ochsenkuehn, Hanns-Georg
Regensburger Str. 9
92318 Neumarkt in der Oberpfalz / DE
03 / Beijert, Oscar
Bosrand 105
8075 Bl Elspeet / NL
 [2020/13]
Former [2016/45]01 / O'Neil, Paul
25 Bridgemere Road
Eastbourne
Est Essex BN22 8UB / GB
02 / Ochsenkuehn, Hanns-Georg
Regensburger Str. 9
92318 Neumarkt in der Oberpfalz / DE
03 / Beijert, Oscar
Bosrand 105
8075 Bl Elspeet / NL
Representative(s)Müller Hoffmann & Partner
Patentanwälte mbB
St.-Martin-Straße 58
81541 München / DE
[N/P]
Former [2016/45]Müller Hoffmann & Partner
Patentanwälte mbB
St.-Martin-Strasse 58
81541 München / DE
Application number, filing date15166908.208.05.2015
[2016/45]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3091365
Date:09.11.2016
Language:EN
[2016/45]
Type: B1 Patent specification 
No.:EP3091365
Date:25.03.2020
Language:EN
[2020/13]
Search report(s)(Supplementary) European search report - dispatched on:EP28.10.2015
ClassificationIPC:G01R35/00, G01R31/28, G01R27/28
[2016/45]
CPC:
G01R35/00 (EP); G01R31/2822 (EP); G01R27/28 (EP);
G01R31/2889 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/45]
TitleGerman:VERFAHREN ZUR ANALYSE DER HF-LEISTUNG EINER TESTKARTE, DETEKTORANORDNUNG UND SYSTEM ZUR ANALYSE DER HF-LEISTUNG EINER TESTKARTE[2016/45]
English:METHOD FOR ANALYZING THE RF PERFORMANCE OF A PROBE CARD, DETECTOR ASSEMBLY AND SYSTEM FOR ANALYZING THE RF PERFORMANCE OF A PROBE CARD[2016/45]
French:PROCÉDÉ PERMETTANT D'ANALYSER LA PERFORMANCE RF D'UNE CARTE DE SONDE, ENSEMBLE DÉTECTEUR ET SYSTÈME PERMETTANT D'ANALYSER LA PERFORMANCE RF D'UNE CARTE DE SONDE[2016/45]
Examination procedure08.05.2015Examination requested  [2016/45]
25.11.2015Despatch of a communication from the examining division (Time limit: M04)
01.04.2016Reply to a communication from the examining division
18.07.2018Despatch of a communication from the examining division (Time limit: M04)
16.11.2018Reply to a communication from the examining division
17.10.2019Communication of intention to grant the patent
17.02.2020Fee for grant paid
17.02.2020Fee for publishing/printing paid
17.02.2020Receipt of the translation of the claim(s)
Opposition(s)12.01.2021No opposition filed within time limit [2021/11]
Fees paidRenewal fee
22.05.2017Renewal fee patent year 03
28.05.2018Renewal fee patent year 04
27.05.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU08.05.2015
AL25.03.2020
AT25.03.2020
CY25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
MK25.03.2020
MT25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
TR25.03.2020
IE08.05.2020
LU08.05.2020
FR25.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG25.06.2020
GB25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
[2022/31]
Former [2022/30]HU08.05.2015
AL25.03.2020
AT25.03.2020
CY25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
MT25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
TR25.03.2020
IE08.05.2020
LU08.05.2020
FR25.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG25.06.2020
GB25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2022/27]HU08.05.2015
AT25.03.2020
CY25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
MT25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
TR25.03.2020
IE08.05.2020
LU08.05.2020
FR25.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG25.06.2020
GB25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/23]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
IE08.05.2020
LU08.05.2020
FR25.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG25.06.2020
GB25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/22]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
IE08.05.2020
LU08.05.2020
CH31.05.2020
LI31.05.2020
BG25.06.2020
GB25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/20]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
IE08.05.2020
LU08.05.2020
CH31.05.2020
LI31.05.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/15]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
LU08.05.2020
CH31.05.2020
LI31.05.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/10]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
CH31.05.2020
LI31.05.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/09]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
CH31.05.2020
LI31.05.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/08]CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
CH31.05.2020
LI31.05.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/07]CZ25.03.2020
DK25.03.2020
EE25.03.2020
FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
CH31.05.2020
LI31.05.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2020/50]CZ25.03.2020
EE25.03.2020
FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2020/49]CZ25.03.2020
FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2020/48]FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2020/47]FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RS25.03.2020
SE25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
Former [2020/46]FI25.03.2020
HR25.03.2020
LV25.03.2020
NL25.03.2020
RS25.03.2020
SE25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
Former [2020/45]FI25.03.2020
HR25.03.2020
LV25.03.2020
NL25.03.2020
RS25.03.2020
SE25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
Former [2020/39]FI25.03.2020
HR25.03.2020
LV25.03.2020
RS25.03.2020
SE25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
Former [2020/38]FI25.03.2020
HR25.03.2020
LV25.03.2020
RS25.03.2020
SE25.03.2020
NO25.06.2020
GR26.06.2020
Former [2020/37]FI25.03.2020
HR25.03.2020
LV25.03.2020
RS25.03.2020
SE25.03.2020
NO25.06.2020
Former [2020/35]FI25.03.2020
NO25.06.2020
Documents cited:Search[I]US2007182424  (BENEDIKT JOHANNES [GB], et al) [I] 1-8,10-15 * paragraph [0096] - paragraph [0111] *;
 [A]US2010213960  (MOK SAMMY [US], et al) [A] 1-15 * paragraph [0047] - paragraph [0060] *;
 [A]US2012169359  (KIM BRUCE C [US], et al) [A] 1-15 * paragraph [0021] - paragraph [0027] *;
 [A]US2012169367  (KUO YUNG-HSIN [TW], et al) [A] 1-15* paragraph [0012] - paragraph [0035] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.