EP2952402 - METHOD AND SYSTEM FOR ADAPTATION OF THE PROPULSION OF A VEHICLE RELATIVE A PRECEDING VEHICLE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.06.2021 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 03.07.2020 | ||
Former | Grant of patent is intended Status updated on 17.03.2020 | ||
Former | Request for examination was made Status updated on 02.06.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Scania CV AB 151 87 Södertälje / SE | [2021/17] |
Former [2015/50] | For all designated states Scania CV AB 151 87 Södertälje / SE | Inventor(s) | 01 /
FELIXSON, Henrik Högalidsgatan 52A 117 30 Stockholm / SE | 02 /
ANDERSSON, Jonny Högloftsvägen 8 151 68 Södertälje / SE | [2015/50] | Representative(s) | Scania CV AB Patents, GP 117kv 151 87 Södertälje / SE | [2015/50] | Application number, filing date | 15168929.6 | 22.05.2015 | [2015/50] | Priority number, date | SE20140050686 | 05.06.2014 Original published format: SE 1450686 | [2015/50] | Filing language | SV | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2952402 | Date: | 09.12.2015 | Language: | EN | [2015/50] | Type: | A3 Search report | No.: | EP2952402 | Date: | 23.11.2016 | Language: | EN | [2016/47] | Type: | B1 Patent specification | No.: | EP2952402 | Date: | 05.08.2020 | Language: | EN | [2020/32] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 24.10.2016 | Classification | IPC: | B60W30/14, B60W40/04 | [2015/50] | CPC: |
B60W40/04 (EP);
G08G1/22 (SE);
B60W30/143 (EP);
B60W30/16 (EP);
G01G19/03 (SE);
G05D1/695 (SE);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/27] |
Former [2015/50] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN UND SYSTEM ZUR ANPASSUNG DES ANTRIEBS EINES FAHRZEUGS RELATIV ZU EINEM VORANFAHRENDEN FAHRZEUG | [2015/50] | English: | METHOD AND SYSTEM FOR ADAPTATION OF THE PROPULSION OF A VEHICLE RELATIVE A PRECEDING VEHICLE | [2015/50] | French: | PROCÉDÉ ET SYSTÈME D'ADAPTATION DE LA PROPULSION D'UN VÉHICULE RELATIF À UN VÉHICULE ANTÉRIEUR. | [2020/15] |
Former [2015/50] | PROCÉDÉ ET SYSTÈME À L'ADAPTATION DE LA PROPULSION D'UN VÉHICULE RELATIF À UN VÉHICULE ANTÉRIEUR. | Examination procedure | 22.05.2015 | Date on which the examining division has become responsible | 16.05.2017 | Amendment by applicant (claims and/or description) | 23.05.2017 | Examination requested [2017/27] | 18.03.2020 | Communication of intention to grant the patent | 22.06.2020 | Fee for grant paid | 22.06.2020 | Fee for publishing/printing paid | 22.06.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 07.05.2021 | No opposition filed within time limit [2021/28] | Fees paid | Renewal fee | 31.05.2017 | Renewal fee patent year 03 | 01.06.2018 | Renewal fee patent year 04 | 31.05.2019 | Renewal fee patent year 05 | 02.06.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.05.2015 | AL | 05.08.2020 | AT | 05.08.2020 | CY | 05.08.2020 | CZ | 05.08.2020 | DK | 05.08.2020 | EE | 05.08.2020 | ES | 05.08.2020 | FI | 05.08.2020 | HR | 05.08.2020 | IT | 05.08.2020 | LT | 05.08.2020 | LV | 05.08.2020 | MC | 05.08.2020 | MK | 05.08.2020 | NL | 05.08.2020 | PL | 05.08.2020 | RO | 05.08.2020 | RS | 05.08.2020 | SE | 05.08.2020 | SI | 05.08.2020 | SK | 05.08.2020 | SM | 05.08.2020 | BG | 05.11.2020 | NO | 05.11.2020 | GR | 06.11.2020 | IS | 05.12.2020 | PT | 07.12.2020 | [2024/22] |
Former [2023/30] | HU | 22.05.2015 | |
AL | 05.08.2020 | ||
AT | 05.08.2020 | ||
CY | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2023/29] | HU | 22.05.2015 | |
AL | 05.08.2020 | ||
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2022/07] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/36] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/34] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/28] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/25] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/23] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/22] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/21] | AT | 05.08.2020 | |
DK | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/12] | AT | 05.08.2020 | |
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/10] | AT | 05.08.2020 | |
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
PL | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/09] | AT | 05.08.2020 | |
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
LT | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
PT | 07.12.2020 | ||
Former [2021/08] | ES | 05.08.2020 | |
FI | 05.08.2020 | ||
LT | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
PT | 07.12.2020 | ||
Former [2021/07] | FI | 05.08.2020 | |
LT | 05.08.2020 | ||
NO | 05.11.2020 | Documents cited: | Search | [XY]JP2004025956 (HINO MOTORS LTD) [X] 1,2,4,5,7-9 * paragraph [0012] - paragraph [0015] * * paragraph [0020] * * figure 2 * [Y] 3,6; | [YA]WO2009072965 (SCANIA CV AB PUB [SE], et al) [Y] 3,6 * figures 3,5,9 * [A] 1,2,4,5,7-9; | [A]DE102008019174 (DAIMLER AG [DE]) [A] 1-9 * the whole document *; | [A]DE102011118135 (BENDIX COMMERCIAL VEHICLE SYS [US]) [A] 1-9* claims 1-20 *; | [A]DE102011121853 (DAIMLER AG [DE]) [A] 1-9 * the whole document * |