blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3095819

EP3095819 - LOW DENSITY CARBON FIBERS FILLED MATERIALS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  11.10.2019
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  03.12.2018
FormerGrant of patent is intended
Status updated on  15.07.2018
FormerRequest for examination was made
Status updated on  25.11.2016
Most recent event   Tooltip01.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 03.08.2022  [2022/31]
Applicant(s)For all designated states
Borealis AG
IZD Tower
Wagramerstraße 17-19
1220 Vienna / AT
[N/P]
Former [2016/47]For all designated states
Borealis AG
IZD Tower Wagramerstraße 17-19
1220 Vienna / AT
Inventor(s)01 / Boragno, Luca
Dachsweg 38b
4030 Pichling / AT
02 / Stockreiter, Wolfgang
Hohe Straße 183
4048 Puchenau / AT
03 / Jerabek, Michael
Gartenweg 36
4060 Leonding / AT
 [2017/27]
Former [2016/47]01 / Boragno, Luca
Leonfeldnerstrasse 157/12
4040 Linz / AT
02 / Stockreiter, Wolfgang
Hohe Straße 183
4048 Puchenau / AT
03 / Jerabek, Michael
Gartenweg 36
4060 Leonding / AT
Representative(s)Maiwald GmbH
Elisenhof
Elisenstraße 3
80335 München / DE
[N/P]
Former [2018/49]Maiwald Patent- und Rechtsanwaltsgesellschaft mbH
Elisenhof
Elisenstraße 3
80335 München / DE
Former [2016/47]Maiwald Patentanwalts GmbH
Elisenhof
Elisenstrasse 3
80335 München / DE
Application number, filing date15168962.722.05.2015
[2016/47]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3095819
Date:23.11.2016
Language:EN
[2016/47]
Type: B1 Patent specification 
No.:EP3095819
Date:05.12.2018
Language:EN
[2018/49]
Search report(s)(Supplementary) European search report - dispatched on:EP05.11.2015
ClassificationIPC:C08L23/12, C08K7/06, C08L23/14, C08L23/16, C08L23/26, C08L51/06
[2018/29]
CPC:
C08L23/12 (EP,US); C08L23/10 (RU); C08J5/042 (US);
C08K7/06 (EP,RU,US); C08L23/16 (EP,US); C08L51/06 (EP,RU,US);
C08J2323/12 (US); C08J2423/30 (US); C08L2203/14 (EP,US);
C08L2205/025 (US); C08L2205/03 (US); C08L2205/08 (EP,US);
C08L2205/16 (EP,US); C08L2207/02 (EP,US) (-)
C-Set:
C08L23/12, C08K7/06, C08L23/26 (US,EP);
C08L23/12, C08K7/06, C08L51/06 (US,EP);
C08L23/12, C08L23/14, C08K7/06, C08L51/06 (EP,US);
C08L23/12, C08L23/16, C08K7/06, C08L51/06 (EP,US);
C08L23/12, C08L23/16, C08L51/06, C08K7/06 (US,EP);
C08L23/12, C08L51/06, C08K7/06 (EP,US)
(-)
Former IPC [2016/47]C08L23/12
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/52]
Former [2016/47]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:MIT KOHLENSTOFFFASERN GEFÜLLTE MATERIALIEN MIT GERINGER DICHTE[2016/47]
English:LOW DENSITY CARBON FIBERS FILLED MATERIALS[2016/47]
French:MATÉRIAUX REMPLIS DE FIBRES DE CARBONE BASSE DENSITÉ[2016/47]
Examination procedure22.05.2015Date on which the examining division has become responsible
18.11.2016Examination requested  [2016/52]
18.05.2017Amendment by applicant (claims and/or description)
16.07.2018Communication of intention to grant the patent
22.10.2018Fee for grant paid
22.10.2018Fee for publishing/printing paid
22.10.2018Receipt of the translation of the claim(s)
Opposition(s)06.09.2019No opposition filed within time limit [2019/46]
Fees paidRenewal fee
23.05.2017Renewal fee patent year 03
25.05.2018Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU22.05.2015
AL05.12.2018
AT05.12.2018
CY05.12.2018
DK05.12.2018
EE05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
MC05.12.2018
MK05.12.2018
MT05.12.2018
RS05.12.2018
SI05.12.2018
SM05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
IE22.05.2019
LU22.05.2019
CH31.05.2019
LI31.05.2019
[2022/31]
Former [2021/34]HU22.05.2015
AL05.12.2018
AT05.12.2018
CY05.12.2018
DK05.12.2018
EE05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
MC05.12.2018
MT05.12.2018
RS05.12.2018
SI05.12.2018
SM05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
IE22.05.2019
LU22.05.2019
CH31.05.2019
LI31.05.2019
Former [2021/32]HU22.05.2015
AL05.12.2018
AT05.12.2018
CY05.12.2018
DK05.12.2018
EE05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
MC05.12.2018
RS05.12.2018
SI05.12.2018
SM05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
IE22.05.2019
LU22.05.2019
CH31.05.2019
LI31.05.2019
Former [2021/26]AL05.12.2018
AT05.12.2018
CY05.12.2018
DK05.12.2018
EE05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
MC05.12.2018
RS05.12.2018
SI05.12.2018
SM05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
IE22.05.2019
LU22.05.2019
CH31.05.2019
LI31.05.2019
Former [2020/21]AL05.12.2018
AT05.12.2018
DK05.12.2018
EE05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
MC05.12.2018
RS05.12.2018
SI05.12.2018
SM05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
IE22.05.2019
LU22.05.2019
CH31.05.2019
LI31.05.2019
Former [2020/11]AL05.12.2018
AT05.12.2018
DK05.12.2018
EE05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
MC05.12.2018
RS05.12.2018
SI05.12.2018
SM05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
LU22.05.2019
CH31.05.2019
LI31.05.2019
Former [2020/07]AL05.12.2018
AT05.12.2018
DK05.12.2018
EE05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
MC05.12.2018
RS05.12.2018
SI05.12.2018
SM05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
Former [2019/50]AL05.12.2018
AT05.12.2018
DK05.12.2018
EE05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
RS05.12.2018
SI05.12.2018
SM05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
Former [2019/48]AL05.12.2018
AT05.12.2018
DK05.12.2018
EE05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
RS05.12.2018
SM05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
Former [2019/39]AL05.12.2018
AT05.12.2018
EE05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
RS05.12.2018
SM05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
Former [2019/37]AL05.12.2018
AT05.12.2018
EE05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
RS05.12.2018
SM05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
PT05.04.2019
Former [2019/33]AL05.12.2018
AT05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
RS05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
PT05.04.2019
Former [2019/26]AL05.12.2018
AT05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
RS05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
Former [2019/25]AT05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
RS05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
Former [2019/24]AT05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
Former [2019/23]AT05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
BG05.03.2019
NO05.03.2019
Former [2019/22]FI05.12.2018
LT05.12.2018
BG05.03.2019
NO05.03.2019
Former [2019/21]FI05.12.2018
LT05.12.2018
NO05.03.2019
Former [2019/20]LT05.12.2018
NO05.03.2019
Documents cited:Search[X]JP2005213478  (IDEMITSU KOSAN CO);
 [X]EP2371897  (TORAY INDUSTRIES [JP], et al);
 [A]WO2014064013  (BOREALIS AG [AT]);
 [X]EP2754691  (JAPAN POLYPROPYLENE CORP [JP])
by applicantWO9924478
 WO9924479
 WO0068315
 EP2251375
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.