blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2949375

EP2949375 - IMPACT MOISTURE SEPARATOR [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  15.03.2024
Database last updated on 19.10.2024
FormerExamination is in progress
Status updated on  13.12.2019
Most recent event   Tooltip15.03.2024Application deemed to be withdrawnpublished on 17.04.2024  [2024/16]
Applicant(s)For all designated states
Ingersoll-Rand Industrial U.S., Inc.
800-E Beaty Street
Davidson, NC 28036 / US
[2020/18]
Former [2015/49]For all designated states
Ingersoll-Rand Company
800-E Beaty Street
Davidson, NC 28036 / US
Inventor(s)01 / LUCAS, Michael J.
108 Lockerbie Lane
Mooresville
Mooresville, NC North Carolina 28115 / US
02 / VALENTINE, Willie Dwayne
117 Boiling Brook Drive
Statesville, NC North Carolina 28615 / US
03 / BERGH, Charles John
117 Bartholomew Rd
Berwyn, PA Pennsylvania 19312 / US
 [2015/49]
Representative(s)Murgitroyd & Company
165-169 Scotland Street
Glasgow G5 8PL / GB
[N/P]
Former [2015/49]Schicker, Silvia, et al
Wuesthoff & Wuesthoff
Patentanwälte PartG mbB
Schweigerstraße 2
81541 München / DE
Application number, filing date15169561.628.05.2015
[2015/49]
Priority number, dateUS20141428945628.05.2014         Original published format: US201414289456
[2015/49]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2949375
Date:02.12.2015
Language:EN
[2015/49]
Type: A3 Search report 
No.:EP2949375
Date:09.03.2016
Language:EN
[2016/10]
Search report(s)(Supplementary) European search report - dispatched on:EP09.02.2016
ClassificationIPC:B01D45/06, B01D45/08
[2015/49]
CPC:
B01D45/06 (EP,US); B01D45/08 (EP,US); B01D45/16 (US);
B01D50/20 (US); F01M13/04 (US); F01M2013/0433 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/49]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:PRALLABSCHEIDER FUR FEUCHTIGKEIT[2015/49]
English:IMPACT MOISTURE SEPARATOR[2015/49]
French:SÉPARATEUR A CHOC D'HUMIDITÉ[2015/49]
Examination procedure28.05.2015Examination requested  [2015/49]
25.08.2016Amendment by applicant (claims and/or description)
17.12.2019Despatch of a communication from the examining division (Time limit: M06)
22.06.2020Reply to a communication from the examining division
03.12.2020Despatch of a communication from the examining division (Time limit: M04)
01.04.2021Reply to a communication from the examining division
01.12.2023Application deemed to be withdrawn, date of legal effect  [2024/16]
21.12.2023Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2024/16]
Fees paidRenewal fee
24.05.2017Renewal fee patent year 03
25.05.2018Renewal fee patent year 04
21.05.2019Renewal fee patent year 05
20.05.2020Renewal fee patent year 06
19.05.2021Renewal fee patent year 07
27.05.2022Renewal fee patent year 08
Penalty fee
Additional fee for renewal fee
31.05.202309   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]US846034  (KIELEY TIMOTHY J [US], et al) [X] 1-7 * figure 1 *;
 [X]US5041146  (SIMMERLEIN-ERLBACHER EWALD-WIL [DE]) [X] 1-7 * figures 2,6,8 *;
 [A]DE102011111451  (GM GLOBAL TECH OPERATIONS INC [US]) [A] 1-7* figure 1 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.