EP3101060 - MACHINE DIRECTION ORIENTED FILM WITH BALANCED PROPERTIES AT LOW STRETCH RATIOS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.11.2018 Database last updated on 31.05.2024 | |
Former | The patent has been granted Status updated on 24.11.2017 | ||
Former | Grant of patent is intended Status updated on 23.07.2017 | ||
Former | Request for examination was made Status updated on 28.04.2017 | ||
Former | The application has been published Status updated on 04.11.2016 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Borealis AG Wagramerstrasse 17-19 1220 Vienna / AT | [2016/49] | Inventor(s) | 01 /
Niedersüß, Peter Blindendorf 221 4312 Ried/Riedmark / AT | 02 /
Gensous, Audrey 2 rue Alexandre Dumas 40100 DAX / FR | 03 /
De Wever, Willem Berkenlaan 6 3500 Hasselt / BE | 04 /
Mandard, Barbara 45 rue de Huleu 1460 Ittre / BE | [2016/49] | Representative(s) | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | [N/P] |
Former [2016/49] | Campbell, Neil Boyd Dehns St Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 15170494.7 | 03.06.2015 | [2016/49] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3101060 | Date: | 07.12.2016 | Language: | EN | [2016/49] | Type: | B1 Patent specification | No.: | EP3101060 | Date: | 27.12.2017 | Language: | EN | [2017/52] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 23.11.2015 | Classification | IPC: | C08J5/18, C08L23/06 | [2016/49] | CPC: |
C08L23/06 (EP);
C08J5/18 (EP);
C08J2323/06 (EP);
C08J2423/08 (EP);
C08L2203/16 (EP);
C08L2205/025 (EP);
C08L2207/066 (EP)
(-)
| C-Set: |
C08L23/06, C08L23/06, C08L23/0815 (EP);
C08L23/06, C08L23/0815, C08L23/06 (EP) | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/22] |
Former [2016/49] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | IN MASCHINENRICHTUNG AUSGERICHTETER FILM MIT AUSGEGLICHENEN EIGENSCHAFTEN BEI NIEDRIGEN STRECKVERHÄLTNISSEN | [2016/49] | English: | MACHINE DIRECTION ORIENTED FILM WITH BALANCED PROPERTIES AT LOW STRETCH RATIOS | [2016/49] | French: | FILM ORIENTÉ DANS LE SENS D'UNE MACHINE AVEC DES PROPRIÉTÉS ÉQUILIBRÉES À FAIBLE TAUX D'ÉTIREMENT | [2016/49] | Examination procedure | 03.06.2015 | Date on which the examining division has become responsible | 20.04.2017 | Examination requested [2017/22] | 24.07.2017 | Communication of intention to grant the patent | 15.11.2017 | Fee for grant paid | 15.11.2017 | Fee for publishing/printing paid | 15.11.2017 | Receipt of the translation of the claim(s) | Opposition(s) | 28.09.2018 | No opposition filed within time limit [2018/49] | Fees paid | Renewal fee | 27.06.2017 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.06.2015 | AL | 27.12.2017 | AT | 27.12.2017 | CY | 27.12.2017 | CZ | 27.12.2017 | DK | 27.12.2017 | EE | 27.12.2017 | FI | 27.12.2017 | HR | 27.12.2017 | LT | 27.12.2017 | LV | 27.12.2017 | MC | 27.12.2017 | MK | 27.12.2017 | NL | 27.12.2017 | PL | 27.12.2017 | PT | 27.12.2017 | RO | 27.12.2017 | RS | 27.12.2017 | SE | 27.12.2017 | SI | 27.12.2017 | SK | 27.12.2017 | SM | 27.12.2017 | TR | 27.12.2017 | BG | 27.03.2018 | NO | 27.03.2018 | GR | 28.03.2018 | IS | 27.04.2018 | IE | 03.06.2018 | LU | 03.06.2018 | MT | 03.06.2018 | BE | 30.06.2018 | CH | 30.06.2018 | LI | 30.06.2018 | [2020/34] |
Former [2020/31] | HU | 03.06.2015 | |
AT | 27.12.2017 | ||
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
MK | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
PT | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SE | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
TR | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
IE | 03.06.2018 | ||
LU | 03.06.2018 | ||
MT | 03.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
Former [2020/30] | HU | 03.06.2015 | |
AT | 27.12.2017 | ||
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
PT | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SE | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
TR | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
IE | 03.06.2018 | ||
LU | 03.06.2018 | ||
MT | 03.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
Former [2020/29] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
PT | 27.12.2017 | ||
RS | 27.12.2017 | ||
SE | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
TR | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
IE | 03.06.2018 | ||
LU | 03.06.2018 | ||
MT | 03.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
Former [2020/28] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
PT | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
TR | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
IE | 03.06.2018 | ||
LU | 03.06.2018 | ||
MT | 03.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
Former [2020/16] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
TR | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
IE | 03.06.2018 | ||
LU | 03.06.2018 | ||
MT | 03.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
Former [2020/08] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
IE | 03.06.2018 | ||
LU | 03.06.2018 | ||
MT | 03.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
Former [2019/24] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
IE | 03.06.2018 | ||
LU | 03.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
Former [2019/21] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
IE | 03.06.2018 | ||
LU | 03.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
Former [2019/19] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
IE | 03.06.2018 | ||
LU | 03.06.2018 | ||
Former [2019/17] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
LU | 03.06.2018 | ||
Former [2019/15] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2019/13] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/51] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/38] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/37] | CY | 27.12.2017 | |
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
Former [2018/34] | FI | 27.12.2017 | |
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
NL | 27.12.2017 | ||
RS | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
Former [2018/25] | FI | 27.12.2017 | |
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
RS | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
Former [2018/23] | FI | 27.12.2017 | |
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
RS | 27.12.2017 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
Former [2018/22] | FI | 27.12.2017 | |
LT | 27.12.2017 | ||
NO | 27.03.2018 | Documents cited: | Search | [A]WO2006037603 (BOREALIS TECH OY [FI], et al) [A] 1-11 * film 12;; example 4; table 6 *; | [A]EP1941998 (BOREALIS TECH OY [FI]) [A] 1-11* layer A);; table 3 * | by applicant | WO03066698 | EP1470185 | WO2008034630 | EP1941999 | EP2653392 | - K. K. MCAULEY; J. F. MCGREGOR, "On-line Inference of Polymer Properties in an Industrial Polyethylene Reactor", AICHE JOURNAL, (199106), vol. 37, no. 6, pages 825 - 835 | - Encyclopedia of Polymer Science and Engineering, (1986), vol. 6, pages 383 - 410 |