EP2988222 - METHOD AND APPARATUS FOR EFFICIENTLY DESTAGING SEQUENTIAL I/O STREAMS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 16.10.2020 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 08.11.2019 | ||
Former | Grant of patent is intended Status updated on 08.07.2019 | ||
Former | Examination is in progress Status updated on 18.01.2019 | ||
Former | Grant of patent is intended Status updated on 16.05.2018 | ||
Former | Examination is in progress Status updated on 08.12.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Dot Hill Systems Corporation 1351 South Sunset Street Longmont CO 80501 / US | [2016/08] | Inventor(s) | 01 /
TRAUT, Zachary David 4983 Raleigh Street Denver, CO 80212 / US | 02 /
BARRELL, Michael David 2855 Rock Creek Circle, No. 300 Superior, CO 80027 / US | [2016/08] | Representative(s) | Beck Greener LLP Fulwood House 12 Fulwood Place London WC1V 6HR / GB | [2019/50] |
Former [2016/08] | O'Connell, David Christopher Haseltine Lake LLP Redcliff Quay 120 Redcliff Street Bristol BS1 6HU / GB | Application number, filing date | 15171476.3 | 10.06.2015 | [2016/08] | Priority number, date | US201414465291 | 21.08.2014 Original published format: US201414465291 | [2016/08] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2988222 | Date: | 24.02.2016 | Language: | EN | [2016/08] | Type: | B1 Patent specification | No.: | EP2988222 | Date: | 11.12.2019 | Language: | EN | [2019/50] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 01.12.2015 | Classification | IPC: | G06F12/0804, G06F12/0871, G06F12/0868, G06F12/08, G06F3/06, G06F11/10 | [2018/22] | CPC: |
G06F12/0868 (EP);
G06F12/0804 (EP);
G06F3/061 (EP);
G06F3/0656 (EP);
G06F3/0689 (EP);
G06F11/1076 (EP);
G06F12/0871 (EP);
G06F2211/1009 (EP);
G06F2211/1059 (EP);
G06F2212/1016 (EP);
G06F2212/1044 (EP);
G06F2212/262 (EP);
G06F2212/312 (EP)
(-)
|
Former IPC [2016/08] | G06F12/08, G06F3/06, G06F11/10 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/39] |
Former [2016/08] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN UND VORRICHTUNG FÜR EFFIZIENTES DESTAGING SEQUENZIELLER E/A-STRÖME | [2016/08] | English: | METHOD AND APPARATUS FOR EFFICIENTLY DESTAGING SEQUENTIAL I/O STREAMS | [2016/08] | French: | PROCEDE ET APPAREIL POUR DESACTIVER EFFICACEMENT DES FLUX D'E/S SEQUENTIELS | [2016/08] | Examination procedure | 22.08.2016 | Examination requested [2016/39] | 14.12.2016 | Amendment by applicant (claims and/or description) | 06.12.2017 | Despatch of a communication from the examining division (Time limit: M04) | 11.04.2018 | Reply to a communication from the examining division | 17.05.2018 | Communication of intention to grant the patent | 09.11.2018 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time | 15.01.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 08.02.2019 | Despatch of a communication from the examining division (Time limit: M04) | 12.06.2019 | Reply to a communication from the examining division | 09.07.2019 | Communication of intention to grant the patent | 29.10.2019 | Fee for grant paid | 29.10.2019 | Fee for publishing/printing paid | 29.10.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 14.09.2020 | No opposition filed within time limit [2020/47] | Request for further processing for: | The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent | 15.01.2019 | Request for further processing filed | 15.01.2019 | Full payment received (date of receipt of payment) Request granted | 30.01.2019 | Decision despatched | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 14.12.2016 | Request for further processing filed | 14.12.2016 | Full payment received (date of receipt of payment) Request granted | 02.01.2017 | Decision despatched | Fees paid | Renewal fee | 26.06.2017 | Renewal fee patent year 03 | 05.06.2018 | Renewal fee patent year 04 | 04.06.2019 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.06.2015 | AL | 11.12.2019 | AT | 11.12.2019 | CY | 11.12.2019 | CZ | 11.12.2019 | DK | 11.12.2019 | EE | 11.12.2019 | ES | 11.12.2019 | FI | 11.12.2019 | HR | 11.12.2019 | IT | 11.12.2019 | LT | 11.12.2019 | LV | 11.12.2019 | MC | 11.12.2019 | MK | 11.12.2019 | MT | 11.12.2019 | NL | 11.12.2019 | PL | 11.12.2019 | RO | 11.12.2019 | RS | 11.12.2019 | SE | 11.12.2019 | SI | 11.12.2019 | SK | 11.12.2019 | SM | 11.12.2019 | TR | 11.12.2019 | BG | 11.03.2020 | NO | 11.03.2020 | GR | 12.03.2020 | IS | 11.04.2020 | PT | 06.05.2020 | IE | 10.06.2020 | LU | 10.06.2020 | BE | 30.06.2020 | CH | 30.06.2020 | LI | 30.06.2020 | [2022/32] |
Former [2022/27] | HU | 10.06.2015 | |
AL | 11.12.2019 | ||
AT | 11.12.2019 | ||
CY | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
MT | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
TR | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
IE | 10.06.2020 | ||
LU | 10.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
Former [2021/24] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
IE | 10.06.2020 | ||
LU | 10.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
Former [2021/20] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
IE | 10.06.2020 | ||
LU | 10.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
Former [2021/15] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
LU | 10.06.2020 | ||
Former [2021/10] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/51] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/47] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/40] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/37] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
PT | 06.05.2020 | ||
Former [2020/36] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
PT | 06.05.2020 | ||
Former [2020/35] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/34] | AL | 11.12.2019 | |
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/32] | AL | 11.12.2019 | |
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/25] | FI | 11.12.2019 | |
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/23] | FI | 11.12.2019 | |
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/22] | FI | 11.12.2019 | |
LT | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
Former [2020/21] | NO | 11.03.2020 | Documents cited: | Search | [Y]US2006294301 (ZOHAR OFIR [IL], et al) [Y] 1,2,4,10,11 * abstract * * paragraph [0004] - paragraph [0006] * * paragraph [0056] - paragraph [0058] ** figures 4-5 *; | [YA]US2013326149 (BARRELL MICHAEL DAVID [US], et al) [Y] 1,2,4,10,11 * abstract * * paragraph [0029] - paragraph [0037] * * paragraph [0064] * * paragraph [0100] - paragraph [0112] * * figures 1a-1c, 2, 9, 10 * * claim 19 * [A] 3,5-9 |