blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2965885

EP2965885 - TILE OR MASONRY SAW ASSEMBLY WITH DOUBLE MOVEMENT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  25.12.2020
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  17.01.2020
FormerGrant of patent is intended
Status updated on  10.09.2019
FormerRequest for examination was made
Status updated on  07.08.2019
FormerGrant of patent is intended
Status updated on  09.04.2019
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
HUSQVARNA AB
Drottninggatan 2
561 82 Huskvarna / SE
[2016/02]
Inventor(s)01 / Elmestrand, Karl
Valkyriavägen 14
433 62 Sävedalen / SE
02 / Nordvall, Petter
Kantyxegatan 18
421 47 Västra Frölunda / SE
 [2016/02]
Application number, filing date15172550.417.06.2015
[2016/02]
Priority number, dateSE2014005076819.06.2014         Original published format: SE 1450768
[2016/02]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2965885
Date:13.01.2016
Language:EN
[2016/02]
Type: A3 Search report 
No.:EP2965885
Date:06.04.2016
Language:EN
[2016/14]
Type: B1 Patent specification 
No.:EP2965885
Date:19.02.2020
Language:EN
[2020/08]
Search report(s)(Supplementary) European search report - dispatched on:EP07.03.2016
ClassificationIPC:B28D1/04
[2016/02]
CPC:
B28D1/047 (EP,US); B28D1/044 (US); B23D47/045 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/46]
Former [2016/02]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:FLIESE ODER STEINSÄGE MIT DOPPELBEWEGUNG[2016/02]
English:TILE OR MASONRY SAW ASSEMBLY WITH DOUBLE MOVEMENT[2016/02]
French:ENSEMBLE SCIE DE MAÇONNERIE OU DE CARREAUX AVEC DOUBLE MOUVEMENT[2016/02]
Examination procedure06.10.2016Amendment by applicant (claims and/or description)
06.10.2016Examination requested  [2016/46]
10.04.2019Communication of intention to grant the patent
05.08.2019Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
11.09.2019Communication of intention to grant the patent
09.01.2020Fee for grant paid
09.01.2020Fee for publishing/printing paid
09.01.2020Receipt of the translation of the claim(s)
Opposition(s)20.11.2020No opposition filed within time limit [2021/04]
Fees paidRenewal fee
26.06.2017Renewal fee patent year 03
05.06.2018Renewal fee patent year 04
04.06.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU17.06.2015
AL19.02.2020
AT19.02.2020
CY19.02.2020
CZ19.02.2020
DK19.02.2020
EE19.02.2020
ES19.02.2020
FI19.02.2020
HR19.02.2020
IT19.02.2020
LT19.02.2020
LV19.02.2020
MC19.02.2020
MK19.02.2020
MT19.02.2020
NL19.02.2020
PL19.02.2020
RO19.02.2020
RS19.02.2020
SE19.02.2020
SI19.02.2020
SK19.02.2020
SM19.02.2020
TR19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
IE17.06.2020
LU17.06.2020
IS19.06.2020
BE30.06.2020
CH30.06.2020
LI30.06.2020
PT12.07.2020
[2022/31]
Former [2022/30]HU17.06.2015
AL19.02.2020
AT19.02.2020
CY19.02.2020
CZ19.02.2020
DK19.02.2020
EE19.02.2020
ES19.02.2020
FI19.02.2020
HR19.02.2020
IT19.02.2020
LT19.02.2020
LV19.02.2020
MC19.02.2020
MT19.02.2020
NL19.02.2020
PL19.02.2020
RO19.02.2020
RS19.02.2020
SE19.02.2020
SI19.02.2020
SK19.02.2020
SM19.02.2020
TR19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
IE17.06.2020
LU17.06.2020
IS19.06.2020
BE30.06.2020
CH30.06.2020
LI30.06.2020
PT12.07.2020
Former [2022/27]HU17.06.2015
AT19.02.2020
CY19.02.2020
CZ19.02.2020
DK19.02.2020
EE19.02.2020
ES19.02.2020
FI19.02.2020
HR19.02.2020
IT19.02.2020
LT19.02.2020
LV19.02.2020
MC19.02.2020
MT19.02.2020
NL19.02.2020
PL19.02.2020
RO19.02.2020
RS19.02.2020
SE19.02.2020
SI19.02.2020
SK19.02.2020
SM19.02.2020
TR19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
IE17.06.2020
LU17.06.2020
IS19.06.2020
BE30.06.2020
CH30.06.2020
LI30.06.2020
PT12.07.2020
Former [2021/24]AT19.02.2020
CZ19.02.2020
DK19.02.2020
EE19.02.2020
ES19.02.2020
FI19.02.2020
HR19.02.2020
IT19.02.2020
LT19.02.2020
LV19.02.2020
MC19.02.2020
NL19.02.2020
PL19.02.2020
RO19.02.2020
RS19.02.2020
SE19.02.2020
SI19.02.2020
SK19.02.2020
SM19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
IE17.06.2020
LU17.06.2020
IS19.06.2020
BE30.06.2020
CH30.06.2020
LI30.06.2020
PT12.07.2020
Former [2021/20]AT19.02.2020
CZ19.02.2020
DK19.02.2020
EE19.02.2020
ES19.02.2020
FI19.02.2020
HR19.02.2020
IT19.02.2020
LT19.02.2020
LV19.02.2020
MC19.02.2020
NL19.02.2020
PL19.02.2020
RO19.02.2020
RS19.02.2020
SE19.02.2020
SI19.02.2020
SK19.02.2020
SM19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
IE17.06.2020
LU17.06.2020
IS19.06.2020
CH30.06.2020
LI30.06.2020
PT12.07.2020
Former [2021/15]AT19.02.2020
CZ19.02.2020
DK19.02.2020
EE19.02.2020
ES19.02.2020
FI19.02.2020
HR19.02.2020
IT19.02.2020
LT19.02.2020
LV19.02.2020
MC19.02.2020
NL19.02.2020
PL19.02.2020
RO19.02.2020
RS19.02.2020
SE19.02.2020
SI19.02.2020
SK19.02.2020
SM19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
LU17.06.2020
IS19.06.2020
PT12.07.2020
Former [2021/10]AT19.02.2020
CZ19.02.2020
DK19.02.2020
EE19.02.2020
ES19.02.2020
FI19.02.2020
HR19.02.2020
IT19.02.2020
LT19.02.2020
LV19.02.2020
MC19.02.2020
NL19.02.2020
PL19.02.2020
RO19.02.2020
RS19.02.2020
SE19.02.2020
SI19.02.2020
SK19.02.2020
SM19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
IS19.06.2020
PT12.07.2020
Former [2020/50]CZ19.02.2020
DK19.02.2020
EE19.02.2020
ES19.02.2020
FI19.02.2020
HR19.02.2020
LT19.02.2020
LV19.02.2020
NL19.02.2020
RO19.02.2020
RS19.02.2020
SE19.02.2020
SK19.02.2020
SM19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
IS19.06.2020
PT12.07.2020
Former [2020/49]CZ19.02.2020
DK19.02.2020
ES19.02.2020
FI19.02.2020
HR19.02.2020
LT19.02.2020
LV19.02.2020
NL19.02.2020
RO19.02.2020
RS19.02.2020
SE19.02.2020
SK19.02.2020
SM19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
IS19.06.2020
PT12.07.2020
Former [2020/48]DK19.02.2020
ES19.02.2020
FI19.02.2020
HR19.02.2020
LT19.02.2020
LV19.02.2020
NL19.02.2020
RO19.02.2020
RS19.02.2020
SE19.02.2020
SM19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
IS19.06.2020
PT12.07.2020
Former [2020/47]DK19.02.2020
ES19.02.2020
FI19.02.2020
HR19.02.2020
LT19.02.2020
LV19.02.2020
NL19.02.2020
RS19.02.2020
SE19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
IS19.06.2020
Former [2020/45]FI19.02.2020
HR19.02.2020
LV19.02.2020
NL19.02.2020
RS19.02.2020
SE19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
IS19.06.2020
Former [2020/40]FI19.02.2020
HR19.02.2020
LV19.02.2020
RS19.02.2020
SE19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
IS19.06.2020
Former [2020/39]FI19.02.2020
HR19.02.2020
LV19.02.2020
RS19.02.2020
SE19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
Former [2020/38]FI19.02.2020
HR19.02.2020
LV19.02.2020
RS19.02.2020
SE19.02.2020
NO19.05.2020
GR20.05.2020
Former [2020/37]FI19.02.2020
HR19.02.2020
LV19.02.2020
RS19.02.2020
SE19.02.2020
NO19.05.2020
Former [2020/35]FI19.02.2020
NO19.05.2020
Documents cited:Search[A]US2006213341  (HOGAN MICHAEL E [US]) [A] 1-17 * paragraphs [0019] , [0020]; figures 4a, 4b *;
 [IA]US2009211419  (WISE ROBERT [US]) [I] 1,2 * paragraphs [0012] , [0031]; figure - * [A] 3-17;
 [A]US2009277315  (IPATENCO ALEK [US], et al) [A] 1-17* figure - *
ExaminationUS6119676
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.