EP2977877 - SYSTEM, METHOD AND DEVICE-READABLE MEDIUM FOR LAST-VIEWED COMMUNICATION EVENT INTERACTION WITHIN A UNIFIED EVENT VIEW [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.11.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 27.11.2020 | ||
Former | Grant of patent is intended Status updated on 09.09.2020 | ||
Former | Examination is in progress Status updated on 25.02.2020 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states BlackBerry Limited 2200 University Avenue East Waterloo, ON N2K 0A7 / CA | [2016/04] | Inventor(s) | 01 /
BROWN, David, Andrew c/o BlackBerry Limited, 2200 University Avenue East, Ext. 77104 Waterloo, Ontario N2K 0A7 / CA | 02 /
EGBO, Emeli Ezekiel c/o BlackBerry Limited, 2200 University Avenue East, Ext. 72991 Waterloo, Ontario N2K 0A7 / CA | [2016/04] | Representative(s) | MERH-IP Matias Erny Reichl Hoffmann Patentanwälte PartG mbB Paul-Heyse-Strasse 29 80336 München / DE | [2016/04] | Application number, filing date | 15177924.6 | 22.07.2015 | [2016/04] | Priority number, date | US201414340243 | 24.07.2014 Original published format: US201414340243 | [2016/04] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2977877 | Date: | 27.01.2016 | Language: | EN | [2016/04] | Type: | B1 Patent specification | No.: | EP2977877 | Date: | 30.12.2020 | Language: | EN | [2020/53] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 08.01.2016 | Classification | IPC: | G06F3/0484, G06F3/0482, G06Q10/10, H04M1/725 | [2016/04] | CPC: |
G06F3/04842 (EP,US);
G06F3/04817 (US);
G06F3/0482 (EP,US);
G06Q10/107 (EP,US);
H04M1/72436 (EP,US);
H04M2250/22 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/36] |
Former [2016/04] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SYSTEM, VERFAHREN UND VORRICHTUNGSLESBARES MEDIUM FÜR ZULETZT ANGESCHAUTE KOMMUNIKATIONSEREIGNISINTERAKTION IN EINER VEREINHEITLICHTEN EREIGNISANSICHT | [2016/04] | English: | SYSTEM, METHOD AND DEVICE-READABLE MEDIUM FOR LAST-VIEWED COMMUNICATION EVENT INTERACTION WITHIN A UNIFIED EVENT VIEW | [2016/04] | French: | SYSTÈME, PROCÉDÉ ET SUPPORT LISIBLE PAR DISPOSITIF POUR UNE INTERACTION D'ÉVÉNEMENT DE COMMUNICATION VISUALISÉE EN DERNIER DANS UNE VUE D'ÉVÉNEMENT UNIFIÉE | [2016/04] | Examination procedure | 27.07.2016 | Amendment by applicant (claims and/or description) | 27.07.2016 | Examination requested [2016/36] | 28.02.2020 | Despatch of a communication from the examining division (Time limit: M04) | 22.06.2020 | Reply to a communication from the examining division | 10.09.2020 | Communication of intention to grant the patent | 19.11.2020 | Fee for grant paid | 19.11.2020 | Fee for publishing/printing paid | 19.11.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 01.10.2021 | No opposition filed within time limit [2021/49] | Fees paid | Renewal fee | 27.07.2017 | Renewal fee patent year 03 | 27.07.2018 | Renewal fee patent year 04 | 29.07.2019 | Renewal fee patent year 05 | 27.07.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.07.2015 | AL | 30.12.2020 | AT | 30.12.2020 | CY | 30.12.2020 | CZ | 30.12.2020 | DK | 30.12.2020 | EE | 30.12.2020 | ES | 30.12.2020 | FI | 30.12.2020 | HR | 30.12.2020 | IT | 30.12.2020 | LT | 30.12.2020 | LV | 30.12.2020 | MC | 30.12.2020 | MK | 30.12.2020 | MT | 30.12.2020 | NL | 30.12.2020 | PL | 30.12.2020 | RO | 30.12.2020 | RS | 30.12.2020 | SE | 30.12.2020 | SI | 30.12.2020 | SK | 30.12.2020 | SM | 30.12.2020 | BG | 30.03.2021 | NO | 30.03.2021 | GR | 31.03.2021 | IS | 30.04.2021 | PT | 30.04.2021 | IE | 22.07.2021 | LU | 22.07.2021 | BE | 31.07.2021 | CH | 31.07.2021 | LI | 31.07.2021 | [2024/41] |
Former [2024/22] | HU | 22.07.2015 | |
AL | 30.12.2020 | ||
AT | 30.12.2020 | ||
CY | 30.12.2020 | ||
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
MK | 30.12.2020 | ||
NL | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
SK | 30.12.2020 | ||
SM | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
IE | 22.07.2021 | ||
LU | 22.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2023/33] | HU | 22.07.2015 | |
AL | 30.12.2020 | ||
AT | 30.12.2020 | ||
CY | 30.12.2020 | ||
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
NL | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
SK | 30.12.2020 | ||
SM | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
IE | 22.07.2021 | ||
LU | 22.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2023/30] | HU | 22.07.2015 | |
AL | 30.12.2020 | ||
AT | 30.12.2020 | ||
CY | 30.12.2020 | ||
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
NL | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
IE | 22.07.2021 | ||
LU | 22.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2023/28] | HU | 22.07.2015 | |
AL | 30.12.2020 | ||
AT | 30.12.2020 | ||
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
NL | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
IE | 22.07.2021 | ||
LU | 22.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2022/35] | AL | 30.12.2020 | |
AT | 30.12.2020 | ||
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
NL | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
IE | 22.07.2021 | ||
LU | 22.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2022/34] | AL | 30.12.2020 | |
AT | 30.12.2020 | ||
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
NL | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
LU | 22.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2022/23] | AL | 30.12.2020 | |
AT | 30.12.2020 | ||
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
NL | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
LU | 22.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2022/21] | AL | 30.12.2020 | |
AT | 30.12.2020 | ||
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
NL | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2022/18] | AL | 30.12.2020 | |
AT | 30.12.2020 | ||
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
NL | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2022/13] | AL | 30.12.2020 | |
AT | 30.12.2020 | ||
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
NL | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2022/10] | AL | 30.12.2020 | |
AT | 30.12.2020 | ||
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
NL | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2021/51] | AL | 30.12.2020 | |
AT | 30.12.2020 | ||
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
NL | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2021/49] | AL | 30.12.2020 | |
AT | 30.12.2020 | ||
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
NL | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2021/48] | AL | 30.12.2020 | |
AT | 30.12.2020 | ||
CZ | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
NL | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2021/45] | AL | 30.12.2020 | |
AT | 30.12.2020 | ||
CZ | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
NL | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2021/42] | AT | 30.12.2020 | |
CZ | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
NL | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2021/39] | AT | 30.12.2020 | |
CZ | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
NL | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2021/37] | AT | 30.12.2020 | |
CZ | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
NL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2021/36] | CZ | 30.12.2020 | |
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
NL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2021/35] | CZ | 30.12.2020 | |
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
NL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2021/34] | CZ | 30.12.2020 | |
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
NL | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2021/33] | FI | 30.12.2020 | |
HR | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2021/28] | FI | 30.12.2020 | |
HR | 30.12.2020 | ||
LV | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
Former [2021/24] | FI | 30.12.2020 | |
LV | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
Former [2021/23] | FI | 30.12.2020 | |
LV | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
Former [2021/22] | FI | 30.12.2020 | |
RS | 30.12.2020 | ||
NO | 30.03.2021 | ||
Former [2021/20] | FI | 30.12.2020 | Documents cited: | Search | [I]US2013145295 (BOCKING ANDREW DOUGLAS [CA], et al) [I] 1-13 * figures 23-35 * * paragraph [0063] - paragraph [0080] *; | [I]EP2631760 (RESEARCH IN MOTION LTD [CA]) [I] 1-13 * paragraph [0051] * * paragraph [0120] - paragraph [0164] * * figures 4-11 *; | [I]EP2693318 (LG ELECTRONICS INC [KR]) [I] 1-13 * figures 4-15 * * paragraph [0113] - paragraph [0174] *; | [A]US2014053102 (LEE ZOO HYUN [KR], et al) [A] 1-13 * paragraph [0041] - paragraph [0044] * * figures 4-12 ** paragraph [0049] - paragraph [0082] * | by applicant | US7568011 | US8375400 | US2013297604 | - Internet Message Format RFC 5322 and RFC 2822, INTERNET ENGINEERING TASK FORCE | - RFC 2779 and RFC 3921, INTERNET ENGINEERING TASK FORCE |