blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2983301

EP2983301 - SPLIT DIVERSITY DATA COMBINING [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  18.09.2020
Database last updated on 07.10.2024
FormerThe patent has been granted
Status updated on  11.10.2019
FormerGrant of patent is intended
Status updated on  13.06.2019
FormerExamination is in progress
Status updated on  13.01.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
NXP B.V.
High Tech Campus 60
5656 AG Eindhoven / NL
[2016/06]
Inventor(s)01 / LI, Hong
c/o NXP Semiconductors, Intellectual Property &
Licensing
Red Central
60 High Street
Redhill, RH1 1SH / GB
 [2016/06]
Representative(s)Lee, Candice Jane
NXP SEMICONDUCTORS
Intellectual Property Group
Abbey House
25 Clarendon Road
Redhill, Surrey RH1 1QZ / GB
[2019/46]
Former [2016/06]Terblanche, Candice Jane
NXP Semiconductors
Intellectual Property and Licensing
Red Central
60 High Street
Redhill, Surrey RH1 1SH / GB
Application number, filing date15179261.131.07.2015
[2016/06]
Priority number, dateUS20141445330906.08.2014         Original published format: US201414453309
[2016/06]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2983301
Date:10.02.2016
Language:EN
[2016/06]
Type: B1 Patent specification 
No.:EP2983301
Date:13.11.2019
Language:EN
[2019/46]
Search report(s)(Supplementary) European search report - dispatched on:EP10.11.2015
ClassificationIPC:H04B7/02, H04B7/08
[2016/06]
CPC:
H04B7/0837 (EP,US); H04B7/0413 (US); H04B1/7115 (US);
H04B7/022 (US); H04L27/2647 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/38]
Former [2016/06]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:KOMBINATION VON DATEN MIT GETEILTER DIVERSITÄT[2016/06]
English:SPLIT DIVERSITY DATA COMBINING[2016/06]
French:COMBINAISON DE DONNÉES DE DIVERSITÉ FENDUE[2016/06]
Examination procedure28.07.2016Amendment by applicant (claims and/or description)
10.08.2016Examination requested  [2016/38]
16.01.2017Despatch of a communication from the examining division (Time limit: M06)
20.07.2017Reply to a communication from the examining division
02.11.2017Despatch of a communication from the examining division (Time limit: M06)
08.05.2018Reply to a communication from the examining division
13.05.2019Cancellation of oral proceeding that was planned for 15.05.2019
15.05.2019Date of oral proceedings (cancelled)
14.06.2019Communication of intention to grant the patent
01.10.2019Fee for grant paid
01.10.2019Fee for publishing/printing paid
01.10.2019Receipt of the translation of the claim(s)
Opposition(s)14.08.2020No opposition filed within time limit [2020/43]
Fees paidRenewal fee
31.07.2017Renewal fee patent year 03
31.07.2018Renewal fee patent year 04
31.07.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU31.07.2015
AL13.11.2019
AT13.11.2019
CY13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
IT13.11.2019
LT13.11.2019
LV13.11.2019
MC13.11.2019
MK13.11.2019
MT13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
TR13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
BE31.07.2020
CH31.07.2020
GB31.07.2020
IE31.07.2020
LI31.07.2020
LU31.07.2020
[2022/32]
Former [2022/27]HU31.07.2015
AL13.11.2019
AT13.11.2019
CY13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
IT13.11.2019
LT13.11.2019
LV13.11.2019
MC13.11.2019
MT13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
TR13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
BE31.07.2020
CH31.07.2020
GB31.07.2020
IE31.07.2020
LI31.07.2020
LU31.07.2020
Former [2021/37]AL13.11.2019
AT13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
IT13.11.2019
LT13.11.2019
LV13.11.2019
MC13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
BE31.07.2020
CH31.07.2020
GB31.07.2020
IE31.07.2020
LI31.07.2020
LU31.07.2020
Former [2021/24]AL13.11.2019
AT13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
IT13.11.2019
LT13.11.2019
LV13.11.2019
MC13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
BE31.07.2020
CH31.07.2020
GB31.07.2020
LI31.07.2020
LU31.07.2020
Former [2021/22]AL13.11.2019
AT13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
IT13.11.2019
LT13.11.2019
LV13.11.2019
MC13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
CH31.07.2020
GB31.07.2020
LI31.07.2020
LU31.07.2020
Former [2021/20]AL13.11.2019
AT13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
IT13.11.2019
LT13.11.2019
LV13.11.2019
MC13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
CH31.07.2020
LI31.07.2020
LU31.07.2020
Former [2021/15]AL13.11.2019
AT13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
IT13.11.2019
LT13.11.2019
LV13.11.2019
MC13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2021/10]AL13.11.2019
AT13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
IT13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/51]AL13.11.2019
AT13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/37]AL13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SK13.11.2019
SM13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/36]AL13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/35]AL13.11.2019
CZ13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/34]AL13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RS13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/32]AL13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RS13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/25]FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RS13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/24]FI13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/23]FI13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
PT13.03.2020
Former [2020/22]FI13.11.2019
LT13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
PT13.03.2020
Former [2020/21]NO13.02.2020
Documents cited:Search[A]US2005243756  (CLEVELAND JOSEPH R [US], et al) [A] 1-15 * paragraph [0010] - paragraph [0047] *;
 [A]US2008285533  (BENGTSSON HENRIK [SE], et al) [A] 1-15 * paragraph [0048] - paragraph [0069] *;
 [XYI]US2009170455  (BOWEN TOBY JOHN [US], et al) [X] 1,11,14 * paragraph [0005] * * paragraph [0028] - paragraph [0034]; figure 1 * * paragraph [0040] - paragraph [0045]; figures 3-6 * [Y] 2-4,6,9,10,12,13,15 [I] 5,7,8;
 [A]US2010062802  (AMRAM NOAM [IL]) [A] 1-15 * paragraph [0187] - paragraph [0191] *;
 [Y]US2012231739  (CHEN YU [CN], et al) [Y] 2-4,6,9,10,12,13,15 * paragraph [0008] - paragraph [0011] * * paragraph [0017] * * paragraph [0041] - paragraph [0051]; figure 3 *;
 [A]US2014148093  (NGUYEN NAM [US], et al) [A] 1-15* the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.