EP3130802 - REINFORCED MAIN BEARING OF A WIND TURBINE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 31.07.2020 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 23.08.2019 | ||
Former | Grant of patent is intended Status updated on 07.04.2019 | ||
Former | Request for examination was made Status updated on 18.08.2017 | ||
Former | The application has been published Status updated on 13.01.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Siemens Gamesa Renewable Energy A/S Borupvej 16 7330 Brande / DK | [2019/20] |
Former [2017/35] | For all designated states Siemens Aktiengesellschaft Werner-von-Siemens-Straße 1 80333 München / DE | ||
Former [2017/07] | For all designated states Siemens Aktiengesellschaft Wittelsbacherplatz 2 80333 München / DE | Inventor(s) | 01 /
Laursen, Christian Hvedelunden 21 8722 Hedensted / DK | [2017/07] | Representative(s) | Aspacher, Karl-Georg, et al Siemens Aktiengesellschaft Postfach 22 16 34 80506 München / DE | [2019/39] | Application number, filing date | 15180483.8 | 11.08.2015 | [2017/07] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3130802 | Date: | 15.02.2017 | Language: | EN | [2017/07] | Type: | B1 Patent specification | No.: | EP3130802 | Date: | 25.09.2019 | Language: | EN | [2019/39] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 20.01.2016 | Classification | IPC: | F16C35/067, F16C35/04, F03D80/70 | [2019/18] | CPC: |
F03D80/70 (EP,US);
F03D1/06 (US);
F16C33/586 (EP,US);
F16C35/042 (EP,US);
F16C35/067 (EP,US);
F16C39/02 (US);
F03D15/20 (EP,US);
F05B2240/50 (EP,US);
F16C19/386 (EP,US);
|
Former IPC [2017/07] | F03D80/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/38] |
Former [2017/07] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERSTÄRKTE HAUPTLAGERUNG EINER WINDTURBINE | [2017/07] | English: | REINFORCED MAIN BEARING OF A WIND TURBINE | [2017/07] | French: | PALIER PRINCIPAL RENFORCÉ POUR UNE ÉOLIENNE | [2017/07] | Examination procedure | 11.08.2015 | Date on which the examining division has become responsible | 10.08.2017 | Amendment by applicant (claims and/or description) | 14.08.2017 | Examination requested [2017/38] | 08.04.2019 | Communication of intention to grant the patent | 18.07.2019 | Receipt of the translation of the claim(s) | 19.07.2019 | Fee for grant paid | 19.07.2019 | Fee for publishing/printing paid | Opposition(s) | 26.06.2020 | No opposition filed within time limit [2020/36] | Fees paid | Renewal fee | 21.08.2017 | Renewal fee patent year 03 | 20.08.2018 | Renewal fee patent year 04 | 19.08.2019 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.08.2015 | AL | 25.09.2019 | AT | 25.09.2019 | CY | 25.09.2019 | CZ | 25.09.2019 | EE | 25.09.2019 | ES | 25.09.2019 | FI | 25.09.2019 | HR | 25.09.2019 | IT | 25.09.2019 | LT | 25.09.2019 | LV | 25.09.2019 | MC | 25.09.2019 | MK | 25.09.2019 | MT | 25.09.2019 | NL | 25.09.2019 | PL | 25.09.2019 | RO | 25.09.2019 | RS | 25.09.2019 | SE | 25.09.2019 | SI | 25.09.2019 | SK | 25.09.2019 | SM | 25.09.2019 | TR | 25.09.2019 | BG | 25.12.2019 | NO | 25.12.2019 | GR | 26.12.2019 | IS | 26.01.2020 | PT | 27.01.2020 | [2022/32] |
Former [2022/27] | HU | 11.08.2015 | |
AL | 25.09.2019 | ||
AT | 25.09.2019 | ||
CY | 25.09.2019 | ||
CZ | 25.09.2019 | ||
EE | 25.09.2019 | ||
ES | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
IT | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
MC | 25.09.2019 | ||
MT | 25.09.2019 | ||
NL | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
SI | 25.09.2019 | ||
SK | 25.09.2019 | ||
SM | 25.09.2019 | ||
TR | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
IS | 26.01.2020 | ||
PT | 27.01.2020 | ||
Former [2021/18] | AL | 25.09.2019 | |
AT | 25.09.2019 | ||
CZ | 25.09.2019 | ||
EE | 25.09.2019 | ||
ES | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
IT | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
MC | 25.09.2019 | ||
NL | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
SI | 25.09.2019 | ||
SK | 25.09.2019 | ||
SM | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
IS | 26.01.2020 | ||
PT | 27.01.2020 | ||
Former [2020/51] | AL | 25.09.2019 | |
AT | 25.09.2019 | ||
CZ | 25.09.2019 | ||
EE | 25.09.2019 | ||
ES | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
IT | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
NL | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
SI | 25.09.2019 | ||
SK | 25.09.2019 | ||
SM | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
IS | 26.01.2020 | ||
PT | 27.01.2020 | ||
Former [2020/36] | AL | 25.09.2019 | |
AT | 25.09.2019 | ||
CZ | 25.09.2019 | ||
EE | 25.09.2019 | ||
ES | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
IT | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
NL | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
SK | 25.09.2019 | ||
SM | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
IS | 26.01.2020 | ||
PT | 27.01.2020 | ||
Former [2020/27] | AL | 25.09.2019 | |
AT | 25.09.2019 | ||
CZ | 25.09.2019 | ||
EE | 25.09.2019 | ||
ES | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
IT | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
NL | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
SK | 25.09.2019 | ||
SM | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
PT | 27.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AL | 25.09.2019 | |
AT | 25.09.2019 | ||
CZ | 25.09.2019 | ||
EE | 25.09.2019 | ||
ES | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
IT | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
NL | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
SK | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
PT | 27.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AL | 25.09.2019 | |
AT | 25.09.2019 | ||
EE | 25.09.2019 | ||
ES | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
IT | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
NL | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
PT | 27.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 25.09.2019 | |
AT | 25.09.2019 | ||
EE | 25.09.2019 | ||
ES | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
IT | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
NL | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
PT | 27.01.2020 | ||
Former [2020/22] | AL | 25.09.2019 | |
EE | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
NL | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
PT | 27.01.2020 | ||
Former [2020/20] | FI | 25.09.2019 | |
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
NL | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
Former [2020/11] | FI | 25.09.2019 | |
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
Former [2020/10] | FI | 25.09.2019 | |
LT | 25.09.2019 | ||
SE | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
Former [2020/09] | FI | 25.09.2019 | |
LT | 25.09.2019 | ||
NO | 25.12.2019 | ||
Former [2020/08] | LT | 25.09.2019 | |
NO | 25.12.2019 | Documents cited: | Search | [A]US2004108733 (WOBBEN ALOYS [DE]) [A] 1,4 * figure 2 *; | [XAY]DE10351524 (WEITKAMP ROLAND [DE]) [X] 1-6,8,11 * paragraph [0028]; figure 2b; claim 1 * [A] 9,10 [Y] 7; | [Y]WO2007095953 (VESTAS WIND SYS AS [DK], et al) [Y] 7 * figure 3 *; | [A]EP1925820 (HARAKOSAN CO LTD [JP]) [A] 1-11* the whole document *; | [X]EP2014917 (SIEMENS AG [DE]) [X] 1,4 * paragraph [0003] * * paragraph [0009] * * paragraph [0024] - paragraph [0025]; figure 2 * |