blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3133255

EP3133255 - COMBINED CYCLE POWER PLANT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  01.03.2024
Database last updated on 28.05.2024
FormerThe patent has been granted
Status updated on  24.03.2023
FormerGrant of patent is intended
Status updated on  16.02.2023
FormerExamination is in progress
Status updated on  18.02.2021
FormerRequest for examination was made
Status updated on  25.08.2017
FormerThe application has been published
Status updated on  20.01.2017
Most recent event   Tooltip10.05.2024Lapse of the patent in a contracting state
New state(s): CH, SI
published on 12.06.2024 [2024/24]
Applicant(s)For all designated states
General Electric Technology GmbH
Brown Boveri Strasse 8
5400 Baden / CH
[2023/17]
Former [2021/18]For all designated states
General Electric Technology GmbH
Brown Boveri Strasse 8
5400 Baden / CH
Former [2017/08]For all designated states
General Electric Technology GmbH
Brown Boveri Strasse 7
5400 Baden / CH
Inventor(s)01 / Trippold, Siegfried
Am Dorfbach 33
79713 Bad Saeckingen / DE
02 / Koenig, Andre
Krenkingen 72
79761 Waldshut-Tiengen / DE
03 / Roy Choudhury, Atish Dipankar
Schulstrasse 24
5415 Nussbaumen / CH
04 / Cantin, Patrice Richard
Les Maréchets 158
1541 Bussy / CH
05 / Agrawal, Prashant
Brown Bovari Strasse 7
5401 Baden / CH
06 / Alikhani, Reza
Brown Bovari Strasse 7
5401 Baden / CH
 [2017/15]
Former [2017/08]01 / Trippold, Siegfried
Am Dorfbach 33
79713 Bad Saeckingen / DE
02 / Koenig, Andre
Krenkingen 72
79761 Waldshut-Tiengen / DE
03 / Roy Choudhury, Atish Dipankar
Schulstrasse 24
5415 Nussbaumen / CH
04 / Cantin, Patrice Richard
Les Maréchets 158
1541 Bussy / CH
Representative(s)Novagraaf Group
Chemin de l'Echo 3
1213 Onex / Geneva / CH
[2023/17]
Former [2017/08]General Electric Technology GmbH
GE Corporate Intellectual Property
Brown Boveri Strasse 7
5400 Baden / CH
Application number, filing date15181820.020.08.2015
[2017/08]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3133255
Date:22.02.2017
Language:EN
[2017/08]
Type: B1 Patent specification 
No.:EP3133255
Date:26.04.2023
Language:EN
[2023/17]
Search report(s)(Supplementary) European search report - dispatched on:EP03.02.2016
ClassificationIPC:F01K23/10, F01K23/16
[2017/08]
CPC:
F01K23/10 (EP,US); F01K23/02 (KR); F01K23/106 (EP,US);
F01K23/16 (EP,KR,US); F02C6/00 (US); H02K7/1823 (US);
Y02E20/16 (EP,KR,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/39]
Former [2017/08]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:KOMBIKRAFTWERK[2017/08]
English:COMBINED CYCLE POWER PLANT[2017/08]
French:CENTRALE ELECTRIQUE A CYCLE COMBINE[2017/08]
Examination procedure20.08.2015Date on which the examining division has become responsible
21.08.2017Amendment by applicant (claims and/or description)
22.08.2017Examination requested  [2017/39]
17.02.2021Despatch of a communication from the examining division (Time limit: M06)
31.07.2021Reply to a communication from the examining division
17.02.2023Communication of intention to grant the patent
08.03.2023Fee for grant paid
08.03.2023Fee for publishing/printing paid
08.03.2023Receipt of the translation of the claim(s)
Opposition(s)29.01.2024No opposition filed within time limit [2024/14]
Fees paidRenewal fee
31.08.2017Renewal fee patent year 03
31.08.2018Renewal fee patent year 04
20.08.2019Renewal fee patent year 05
19.08.2020Renewal fee patent year 06
18.08.2021Renewal fee patent year 07
19.08.2022Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT26.04.2023
CZ26.04.2023
DK26.04.2023
EE26.04.2023
ES26.04.2023
FI26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
MC26.04.2023
NL26.04.2023
PL26.04.2023
RO26.04.2023
RS26.04.2023
SE26.04.2023
SI26.04.2023
SK26.04.2023
SM26.04.2023
NO26.07.2023
GR27.07.2023
LU20.08.2023
IS26.08.2023
PT28.08.2023
CH31.08.2023
[2024/24]
Former [2024/21]AT26.04.2023
CZ26.04.2023
DK26.04.2023
EE26.04.2023
ES26.04.2023
FI26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
MC26.04.2023
NL26.04.2023
PL26.04.2023
RO26.04.2023
RS26.04.2023
SE26.04.2023
SK26.04.2023
SM26.04.2023
NO26.07.2023
GR27.07.2023
LU20.08.2023
IS26.08.2023
PT28.08.2023
Former [2024/16]AT26.04.2023
CZ26.04.2023
DK26.04.2023
EE26.04.2023
ES26.04.2023
FI26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
MC26.04.2023
NL26.04.2023
PL26.04.2023
RO26.04.2023
RS26.04.2023
SE26.04.2023
SK26.04.2023
SM26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2024/10]AT26.04.2023
CZ26.04.2023
DK26.04.2023
EE26.04.2023
ES26.04.2023
FI26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
NL26.04.2023
PL26.04.2023
RO26.04.2023
RS26.04.2023
SE26.04.2023
SK26.04.2023
SM26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2024/08]AT26.04.2023
ES26.04.2023
FI26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
NL26.04.2023
PL26.04.2023
RS26.04.2023
SE26.04.2023
SK26.04.2023
SM26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2024/03]AT26.04.2023
ES26.04.2023
FI26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
NL26.04.2023
PL26.04.2023
RS26.04.2023
SE26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2024/01]AT26.04.2023
ES26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
NL26.04.2023
PL26.04.2023
RS26.04.2023
SE26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2023/51]AT26.04.2023
ES26.04.2023
HR26.04.2023
NL26.04.2023
PL26.04.2023
RS26.04.2023
SE26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2023/50]AT26.04.2023
ES26.04.2023
NL26.04.2023
PL26.04.2023
SE26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2023/48]AT26.04.2023
ES26.04.2023
NL26.04.2023
SE26.04.2023
NO26.07.2023
PT28.08.2023
Former [2023/46]ES26.04.2023
NL26.04.2023
PT28.08.2023
Former [2023/43]NL26.04.2023
Documents cited:Search[X]US6178734  (SHIBUYA SACHIO [JP], et al) [X] 1-9 * column 6, line 20 - column 13, line 42; figure -; claim - * * abstract *;
 [X]US2010263376  (SMITH GORDON RAYMOND [US]) [X] 1-9 * paragraph [0013] - paragraph [0023]; figure -; claim - * * abstract *;
 [X]US2010281844  (SHOLES JR JOHN EDWARD [US], et al) [X] 1-9 * paragraph [0008] - paragraph [0023]; figure -; claim - * * abstract *;
 [X]WO2012045689  (ALSTOM TECHNOLOGY LTD [CH], et al) [X] 1-9 * page 9, line 30 - page 13, line 26; figure -; claim - ** abstract *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.