EP3156517 - USE OF WATER SOLUBLE AND AIR STABLE PHOSPHAADAMANTANES AS STABILIZER IN ELECTROLYTES FOR ELECTROLESS METAL DEPOSITION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.10.2019 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 03.12.2018 | ||
Former | Grant of patent is intended Status updated on 18.07.2018 | ||
Former | Examination is in progress Status updated on 19.05.2017 | ||
Former | Request for examination was made Status updated on 20.03.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states MacDermid Enthone Inc. 245 Freight Street Waterbury, CT 06702 / US | [2017/39] |
Former [2017/16] | For all designated states Enthone, Inc. 350 Frontage Road West Haven, CT 06516 / US | Inventor(s) | 01 /
SCHÄFER, Stefan Margaretenstrasse 37g 42651 Solingen / DE | 02 /
SÖNTGERATH, Katrin Schlicker Weg 17 42651 Solingen / DE | 03 /
KLEINFELD, Marlies Monhofsfeld 142 42369 Wuppertal / DE | [2018/49] |
Former [2017/16] | 01 /
SCHÄFER, Stefan Margaretenstrasse 37g 42651 Solingen / DE | ||
02 /
SOENTGERAT, Katrin Schlicker Weg 17 42651 Solingen / DE | |||
03 /
KLEINFELD, Marlies Monhofsfeld 142 42369 Wuppertal / DE | Representative(s) | Michalski Hüttermann & Partner Patentanwälte mbB Kaistraße 16A 40221 Düsseldorf / DE | [N/P] |
Former [2017/16] | Michalski Hüttermann & Partner Patentanwälte mbB Speditionstraße 21 40221 Düsseldorf / DE | Application number, filing date | 15189465.6 | 13.10.2015 | [2017/16] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3156517 | Date: | 19.04.2017 | Language: | EN | [2017/16] | Type: | A8 Corrected patent application | No.: | EP3156517 | Date: | 07.06.2017 | [2017/23] | Type: | B1 Patent specification | No.: | EP3156517 | Date: | 05.12.2018 | Language: | EN | [2018/49] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 12.09.2016 | Classification | IPC: | C23C18/36, C23C18/40, C23C18/44, // C23C18/50 | [2017/16] | CPC: |
C23C18/36 (EP,KR,US);
C23C18/40 (EP,KR,US);
C23C18/405 (KR);
C23C18/44 (EP,KR,US);
C23C18/50 (EP,KR,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/16] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | VERWENDUNG VON WASSERLÖSLICHEN UND LUFTSTABILEN PHOSPHAADAMANTANEN ALS STABILISATOR IN ELEKTROLYTEN FÜR STROMLOSE METALLABSCHEIDUNG | [2017/16] | English: | USE OF WATER SOLUBLE AND AIR STABLE PHOSPHAADAMANTANES AS STABILIZER IN ELECTROLYTES FOR ELECTROLESS METAL DEPOSITION | [2017/16] | French: | UTILISATION DE PHOSPHAADAMANTANES SOLUBLES DANS L'EAU ET STABLES DANS L'AIR EN TANT QU'AGENTS DE STABILISATION DANS DES ÉLECTROLYTES POUR DÉPÔT DE MÉTAL AUTO-CATALYTIQUE | [2017/16] | Examination procedure | 13.10.2015 | Date on which the examining division has become responsible | 30.11.2016 | Amendment by applicant (claims and/or description) | 30.11.2016 | Examination requested [2017/16] | 18.05.2017 | Despatch of a communication from the examining division (Time limit: M04) | 29.08.2017 | Reply to a communication from the examining division | 20.09.2017 | Despatch of a communication from the examining division (Time limit: M02) | 23.11.2017 | Reply to a communication from the examining division | 26.03.2018 | Despatch of a communication from the examining division (Time limit: M02) | 22.05.2018 | Reply to a communication from the examining division | 19.07.2018 | Communication of intention to grant the patent | 02.10.2018 | Fee for grant paid | 02.10.2018 | Fee for publishing/printing paid | 02.10.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 06.09.2019 | No opposition filed within time limit [2019/46] | Fees paid | Renewal fee | 27.10.2017 | Renewal fee patent year 03 | 29.10.2018 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.10.2015 | AL | 05.12.2018 | AT | 05.12.2018 | CY | 05.12.2018 | CZ | 05.12.2018 | DK | 05.12.2018 | EE | 05.12.2018 | FI | 05.12.2018 | HR | 05.12.2018 | LT | 05.12.2018 | LV | 05.12.2018 | MC | 05.12.2018 | MK | 05.12.2018 | MT | 05.12.2018 | NL | 05.12.2018 | PL | 05.12.2018 | RO | 05.12.2018 | RS | 05.12.2018 | SE | 05.12.2018 | SI | 05.12.2018 | SK | 05.12.2018 | SM | 05.12.2018 | BG | 05.03.2019 | NO | 05.03.2019 | GR | 06.03.2019 | IS | 05.04.2019 | PT | 05.04.2019 | [2022/31] |
Former [2021/34] | HU | 13.10.2015 | |
AL | 05.12.2018 | ||
AT | 05.12.2018 | ||
CY | 05.12.2018 | ||
CZ | 05.12.2018 | ||
DK | 05.12.2018 | ||
EE | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
MC | 05.12.2018 | ||
MT | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SI | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
Former [2021/33] | HU | 13.10.2015 | |
AL | 05.12.2018 | ||
AT | 05.12.2018 | ||
CY | 05.12.2018 | ||
CZ | 05.12.2018 | ||
DK | 05.12.2018 | ||
EE | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
MC | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SI | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
Former [2021/26] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CY | 05.12.2018 | ||
CZ | 05.12.2018 | ||
DK | 05.12.2018 | ||
EE | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
MC | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SI | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
Former [2020/29] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
DK | 05.12.2018 | ||
EE | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
MC | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SI | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
Former [2019/50] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
DK | 05.12.2018 | ||
EE | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SI | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
Former [2019/48] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
DK | 05.12.2018 | ||
EE | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
Former [2019/39] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
EE | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
Former [2019/37] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
EE | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SM | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
PT | 05.04.2019 | ||
Former [2019/35] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
PT | 05.04.2019 | ||
Former [2019/33] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
NL | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
PT | 05.04.2019 | ||
Former [2019/30] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
NL | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
Former [2019/26] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
Former [2019/25] | AT | 05.12.2018 | |
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
Former [2019/24] | AT | 05.12.2018 | |
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
SE | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
Former [2019/23] | AT | 05.12.2018 | |
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
Former [2019/22] | FI | 05.12.2018 | |
LT | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
Former [2019/21] | FI | 05.12.2018 | |
LT | 05.12.2018 | ||
NO | 05.03.2019 | ||
Former [2019/20] | LT | 05.12.2018 | |
NO | 05.03.2019 | Documents cited: | Search | [A]US6183545 (OKUHAMA YOSHIAKI [JP], et al) [A] 1,12 * abstract ** compound 1 *; | [XI]EP1138803 (INFINEON TECHNOLOGIES AG [DE]) [X] 1,3,5,6,9,12-15 * examples 1, 5 * * paragraphs [0022] - [0025] * [I] 2,10; | [AD]JP2005290415 (OKUNO CHEM IND CO) [AD] 1,12 * abstract * * example 1 * * compound 1 * | by applicant | US6146702 | EP1413646 | JP2005290415 | CN101348927 | JP2009149965 |