EP3162538 - ELECTROFUSION FITTING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.07.2020 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 28.06.2019 | ||
Former | Grant of patent is intended Status updated on 24.02.2019 | ||
Former | Request for examination was made Status updated on 27.10.2017 | ||
Former | The application has been published Status updated on 31.03.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Georg Fischer Rohrleitungssysteme AG Ebnatstrasse 111 8201 Schaffhausen / CH | [2017/18] | Inventor(s) | 01 /
Wermelinger, Jörg Lahnstrasse 11 8200 Schaffhausen / CH | 02 /
Hein, Oliver Im Guet 2 8246 Langwiesen / CH | [2017/18] | Representative(s) | Fenner, Seraina Georg Fischer AG Amsler-Laffon-Strasse 9 8201 Schaffhausen / CH | [2017/18] | Application number, filing date | 15191594.9 | 27.10.2015 | [2017/18] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3162538 | Date: | 03.05.2017 | Language: | EN | [2017/18] | Type: | B1 Patent specification | No.: | EP3162538 | Date: | 31.07.2019 | Language: | EN | [2019/31] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 19.05.2016 | Classification | IPC: | B29C65/34, F16L47/03, // B29L23/00 | [2017/18] | CPC: |
B29C65/3468 (EP,US);
B29C65/221 (US);
B29C66/1122 (EP,US);
B29C66/342 (EP,US);
B29C66/3472 (EP,US);
B29C66/5221 (EP,US);
B29C66/52295 (EP,US);
B29C66/52298 (EP,US);
B29C66/71 (US);
B29C66/73921 (EP,US);
B29C66/8262 (EP,US);
B29C66/8266 (EP,US);
F16L13/0227 (US);
F16L13/0236 (US);
F16L47/03 (EP,US);
B29C65/3428 (EP,US);
B29C65/3432 (EP,US);
B29C65/3488 (EP,US);
B29K2101/12 (EP,US);
B29K2105/06 (EP,US);
B29K2705/00 (EP,US);
B29L2023/22 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/48] |
Former [2017/18] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ELEKTROSCHWEISSMUFFE | [2017/18] | English: | ELECTROFUSION FITTING | [2017/18] | French: | MANCHON D'ÉLECTROSOUDAGE | [2017/18] | Examination procedure | 27.10.2015 | Date on which the examining division has become responsible | 24.10.2017 | Amendment by applicant (claims and/or description) | 24.10.2017 | Examination requested [2017/48] | 25.02.2019 | Communication of intention to grant the patent | 18.06.2019 | Fee for grant paid | 18.06.2019 | Fee for publishing/printing paid | 18.06.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/32] | Fees paid | Renewal fee | 25.10.2017 | Renewal fee patent year 03 | 24.10.2018 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.10.2015 | AL | 31.07.2019 | AT | 31.07.2019 | CY | 31.07.2019 | CZ | 31.07.2019 | DK | 31.07.2019 | EE | 31.07.2019 | ES | 31.07.2019 | FI | 31.07.2019 | HR | 31.07.2019 | LT | 31.07.2019 | LV | 31.07.2019 | MC | 31.07.2019 | MK | 31.07.2019 | MT | 31.07.2019 | NL | 31.07.2019 | PL | 31.07.2019 | RO | 31.07.2019 | RS | 31.07.2019 | SE | 31.07.2019 | SI | 31.07.2019 | SK | 31.07.2019 | SM | 31.07.2019 | IE | 27.10.2019 | LU | 27.10.2019 | IS | 30.10.2019 | BE | 31.10.2019 | BG | 31.10.2019 | FR | 31.10.2019 | NO | 31.10.2019 | GR | 01.11.2019 | PT | 02.12.2019 | [2022/31] |
Former [2021/34] | HU | 27.10.2015 | |
AL | 31.07.2019 | ||
AT | 31.07.2019 | ||
CY | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
MT | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
IE | 27.10.2019 | ||
LU | 27.10.2019 | ||
IS | 30.10.2019 | ||
BE | 31.10.2019 | ||
BG | 31.10.2019 | ||
FR | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
Former [2021/32] | HU | 27.10.2015 | |
AL | 31.07.2019 | ||
AT | 31.07.2019 | ||
CY | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
IE | 27.10.2019 | ||
LU | 27.10.2019 | ||
IS | 30.10.2019 | ||
BE | 31.10.2019 | ||
BG | 31.10.2019 | ||
FR | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
Former [2021/26] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CY | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
IE | 27.10.2019 | ||
LU | 27.10.2019 | ||
IS | 30.10.2019 | ||
BE | 31.10.2019 | ||
BG | 31.10.2019 | ||
FR | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/49] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
IE | 27.10.2019 | ||
LU | 27.10.2019 | ||
IS | 30.10.2019 | ||
BE | 31.10.2019 | ||
BG | 31.10.2019 | ||
FR | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/46] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
IE | 27.10.2019 | ||
LU | 27.10.2019 | ||
IS | 30.10.2019 | ||
BE | 31.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/37] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
LU | 27.10.2019 | ||
IS | 30.10.2019 | ||
BE | 31.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/36] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
LU | 27.10.2019 | ||
IS | 30.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/35] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
LU | 27.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/27] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SK | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
IS | 30.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/22] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
IS | 30.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/15] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
IS | 30.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/12] | AT | 31.07.2019 | |
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
IS | 30.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/11] | AT | 31.07.2019 | |
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/10] | AT | 31.07.2019 | |
FI | 31.07.2019 | ||
LT | 31.07.2019 | ||
NL | 31.07.2019 | ||
SE | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
PT | 02.12.2019 | ||
Former [2020/09] | FI | 31.07.2019 | |
LT | 31.07.2019 | ||
NL | 31.07.2019 | ||
NO | 31.10.2019 | ||
Former [2020/08] | LT | 31.07.2019 | |
NO | 31.10.2019 | Documents cited: | Search | [A]US4090899 (REICH FRITZ) [A] 5* figures 1,2 *; | [A]DE3808229 (VDP VERSUCHSANSTALT FUER DATEN [DE]) [A] 1 * abstract * * column 2, lines 19-25,37-67 *; | [A]BE1005527 (DRAKA POLVA BV) [A] 1 * figures 1,2 *; | [AD]WO2010064832 (POLYTEC INC [KR], et al) [AD] 1 * figure 3 *; | [A]KR20100098189 (POLYTEC CO LTD [KR]) [A] 1 * paragraph [0021]; figures 4,5; claim 1 * | by applicant | WO2010064832 |