EP3024132 - SYSTEM AND METHOD FOR UNIFIED COMMON MODE VOLTAGE INJECTION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 20.11.2020 Database last updated on 20.07.2024 | |
Former | The patent has been granted Status updated on 13.12.2019 | ||
Former | Grant of patent is intended Status updated on 04.08.2019 | ||
Former | Examination is in progress Status updated on 12.01.2018 | ||
Former | Request for examination was made Status updated on 03.02.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states GE Energy Power Conversion Technology Limited Boughton Road Rugby Warwickshire CV21 1BU / GB | [2019/34] |
Former [2016/21] | For all designated states GE Energy Power Conversion Technology Ltd Boughton Road Rugby Warwickshire CV21 1BU / GB | Inventor(s) | 01 /
LEI, Qin General Electric Company Global Research One Research Circle K1-3A59 Niskayuna, NY 12309-1027 / US | 02 /
SHEN, Jie General Electric Company Global Research One Research Circle K1-3A59 Niskayuna, NY 12309-1027 / US | 03 /
SCHROEDER, Stefan General Electric Company Global Research One Research Circle Bldg K1-3A59 Niskayuna, NY 12309 / US | [2016/21] | Representative(s) | Serjeants LLP Dock 75 Exploration Drive Leicester, LE4 5NU / GB | [2016/21] | Application number, filing date | 15194443.6 | 13.11.2015 | [2016/21] | Priority number, date | US201414550297 | 21.11.2014 Original published format: US201414550297 | [2016/21] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP3024132 | Date: | 25.05.2016 | Language: | EN | [2016/21] | Type: | A3 Search report | No.: | EP3024132 | Date: | 27.07.2016 | Language: | EN | [2016/30] | Type: | B1 Patent specification | No.: | EP3024132 | Date: | 15.01.2020 | Language: | EN | [2020/03] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 29.06.2016 | Classification | IPC: | H02M7/483, H02M1/12 | [2016/21] | CPC: |
H02M1/12 (EP,BR,CN,US);
H02M7/483 (EP,BR,CN,US);
H02M7/487 (US);
H02M1/123 (EP,CN,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/10] |
Former [2016/21] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SYSTEM UND VERFAHREN FÜR EINE EINHEITLICHE GLEICHTAKTSPANNUNGSINJEKTION | [2016/21] | English: | SYSTEM AND METHOD FOR UNIFIED COMMON MODE VOLTAGE INJECTION | [2016/21] | French: | SYSTÈME ET PROCÉDÉ D'INJECTION DE TENSION DE MODE COMMUN UNIFIÉ | [2016/21] | Examination procedure | 13.11.2015 | Date on which the examining division has become responsible | 20.01.2017 | Examination requested [2017/10] | 26.01.2017 | Amendment by applicant (claims and/or description) | 11.01.2018 | Despatch of a communication from the examining division (Time limit: M06) | 13.07.2018 | Reply to a communication from the examining division | 05.08.2019 | Communication of intention to grant the patent | 03.12.2019 | Receipt of the translation of the claim(s) | 05.12.2019 | Fee for grant paid | 05.12.2019 | Fee for publishing/printing paid | Opposition(s) | 16.10.2020 | No opposition filed within time limit [2020/52] | Fees paid | Renewal fee | 27.11.2017 | Renewal fee patent year 03 | 22.11.2018 | Renewal fee patent year 04 | 20.11.2019 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.11.2015 | AL | 15.01.2020 | AT | 15.01.2020 | CY | 15.01.2020 | CZ | 15.01.2020 | DK | 15.01.2020 | EE | 15.01.2020 | ES | 15.01.2020 | FI | 15.01.2020 | HR | 15.01.2020 | IT | 15.01.2020 | LT | 15.01.2020 | LV | 15.01.2020 | MC | 15.01.2020 | MK | 15.01.2020 | MT | 15.01.2020 | NL | 15.01.2020 | PL | 15.01.2020 | RO | 15.01.2020 | RS | 15.01.2020 | SE | 15.01.2020 | SI | 15.01.2020 | SK | 15.01.2020 | SM | 15.01.2020 | TR | 15.01.2020 | BG | 15.04.2020 | NO | 15.04.2020 | GR | 16.04.2020 | IS | 15.05.2020 | PT | 07.06.2020 | [2022/31] |
Former [2022/30] | HU | 13.11.2015 | |
AL | 15.01.2020 | ||
AT | 15.01.2020 | ||
CY | 15.01.2020 | ||
CZ | 15.01.2020 | ||
DK | 15.01.2020 | ||
EE | 15.01.2020 | ||
ES | 15.01.2020 | ||
FI | 15.01.2020 | ||
HR | 15.01.2020 | ||
IT | 15.01.2020 | ||
LT | 15.01.2020 | ||
LV | 15.01.2020 | ||
MC | 15.01.2020 | ||
MT | 15.01.2020 | ||
NL | 15.01.2020 | ||
PL | 15.01.2020 | ||
RO | 15.01.2020 | ||
RS | 15.01.2020 | ||
SE | 15.01.2020 | ||
SI | 15.01.2020 | ||
SK | 15.01.2020 | ||
SM | 15.01.2020 | ||
TR | 15.01.2020 | ||
BG | 15.04.2020 | ||
NO | 15.04.2020 | ||
GR | 16.04.2020 | ||
IS | 15.05.2020 | ||
PT | 07.06.2020 | ||
Former [2022/27] | HU | 13.11.2015 | |
AT | 15.01.2020 | ||
CY | 15.01.2020 | ||
CZ | 15.01.2020 | ||
DK | 15.01.2020 | ||
EE | 15.01.2020 | ||
ES | 15.01.2020 | ||
FI | 15.01.2020 | ||
HR | 15.01.2020 | ||
IT | 15.01.2020 | ||
LT | 15.01.2020 | ||
LV | 15.01.2020 | ||
MC | 15.01.2020 | ||
MT | 15.01.2020 | ||
NL | 15.01.2020 | ||
PL | 15.01.2020 | ||
RO | 15.01.2020 | ||
RS | 15.01.2020 | ||
SE | 15.01.2020 | ||
SI | 15.01.2020 | ||
SK | 15.01.2020 | ||
SM | 15.01.2020 | ||
TR | 15.01.2020 | ||
BG | 15.04.2020 | ||
NO | 15.04.2020 | ||
GR | 16.04.2020 | ||
IS | 15.05.2020 | ||
PT | 07.06.2020 | ||
Former [2021/31] | AT | 15.01.2020 | |
CZ | 15.01.2020 | ||
DK | 15.01.2020 | ||
EE | 15.01.2020 | ||
ES | 15.01.2020 | ||
FI | 15.01.2020 | ||
HR | 15.01.2020 | ||
IT | 15.01.2020 | ||
LT | 15.01.2020 | ||
LV | 15.01.2020 | ||
MC | 15.01.2020 | ||
NL | 15.01.2020 | ||
PL | 15.01.2020 | ||
RO | 15.01.2020 | ||
RS | 15.01.2020 | ||
SE | 15.01.2020 | ||
SI | 15.01.2020 | ||
SK | 15.01.2020 | ||
SM | 15.01.2020 | ||
BG | 15.04.2020 | ||
NO | 15.04.2020 | ||
GR | 16.04.2020 | ||
IS | 15.05.2020 | ||
PT | 07.06.2020 | ||
Former [2021/10] | AT | 15.01.2020 | |
CZ | 15.01.2020 | ||
DK | 15.01.2020 | ||
EE | 15.01.2020 | ||
ES | 15.01.2020 | ||
FI | 15.01.2020 | ||
HR | 15.01.2020 | ||
IT | 15.01.2020 | ||
LT | 15.01.2020 | ||
LV | 15.01.2020 | ||
NL | 15.01.2020 | ||
PL | 15.01.2020 | ||
RO | 15.01.2020 | ||
RS | 15.01.2020 | ||
SE | 15.01.2020 | ||
SI | 15.01.2020 | ||
SK | 15.01.2020 | ||
SM | 15.01.2020 | ||
BG | 15.04.2020 | ||
NO | 15.04.2020 | ||
GR | 16.04.2020 | ||
IS | 15.05.2020 | ||
PT | 07.06.2020 | ||
Former [2020/50] | CZ | 15.01.2020 | |
DK | 15.01.2020 | ||
EE | 15.01.2020 | ||
ES | 15.01.2020 | ||
FI | 15.01.2020 | ||
HR | 15.01.2020 | ||
LT | 15.01.2020 | ||
LV | 15.01.2020 | ||
NL | 15.01.2020 | ||
RO | 15.01.2020 | ||
RS | 15.01.2020 | ||
SE | 15.01.2020 | ||
SK | 15.01.2020 | ||
SM | 15.01.2020 | ||
BG | 15.04.2020 | ||
NO | 15.04.2020 | ||
GR | 16.04.2020 | ||
IS | 15.05.2020 | ||
PT | 07.06.2020 | ||
Former [2020/49] | CZ | 15.01.2020 | |
DK | 15.01.2020 | ||
ES | 15.01.2020 | ||
FI | 15.01.2020 | ||
HR | 15.01.2020 | ||
LT | 15.01.2020 | ||
LV | 15.01.2020 | ||
NL | 15.01.2020 | ||
RO | 15.01.2020 | ||
RS | 15.01.2020 | ||
SE | 15.01.2020 | ||
SK | 15.01.2020 | ||
SM | 15.01.2020 | ||
BG | 15.04.2020 | ||
NO | 15.04.2020 | ||
GR | 16.04.2020 | ||
IS | 15.05.2020 | ||
PT | 07.06.2020 | ||
Former [2020/48] | DK | 15.01.2020 | |
ES | 15.01.2020 | ||
FI | 15.01.2020 | ||
HR | 15.01.2020 | ||
LT | 15.01.2020 | ||
LV | 15.01.2020 | ||
NL | 15.01.2020 | ||
RO | 15.01.2020 | ||
RS | 15.01.2020 | ||
SE | 15.01.2020 | ||
SM | 15.01.2020 | ||
BG | 15.04.2020 | ||
NO | 15.04.2020 | ||
GR | 16.04.2020 | ||
IS | 15.05.2020 | ||
PT | 07.06.2020 | ||
Former [2020/47] | DK | 15.01.2020 | |
ES | 15.01.2020 | ||
FI | 15.01.2020 | ||
HR | 15.01.2020 | ||
LT | 15.01.2020 | ||
LV | 15.01.2020 | ||
NL | 15.01.2020 | ||
RS | 15.01.2020 | ||
SE | 15.01.2020 | ||
BG | 15.04.2020 | ||
NO | 15.04.2020 | ||
GR | 16.04.2020 | ||
IS | 15.05.2020 | ||
PT | 07.06.2020 | ||
Former [2020/40] | FI | 15.01.2020 | |
HR | 15.01.2020 | ||
LV | 15.01.2020 | ||
NL | 15.01.2020 | ||
RS | 15.01.2020 | ||
SE | 15.01.2020 | ||
BG | 15.04.2020 | ||
NO | 15.04.2020 | ||
GR | 16.04.2020 | ||
IS | 15.05.2020 | ||
PT | 07.06.2020 | ||
Former [2020/39] | FI | 15.01.2020 | |
HR | 15.01.2020 | ||
LV | 15.01.2020 | ||
NL | 15.01.2020 | ||
RS | 15.01.2020 | ||
SE | 15.01.2020 | ||
BG | 15.04.2020 | ||
NO | 15.04.2020 | ||
GR | 16.04.2020 | ||
PT | 07.06.2020 | ||
Former [2020/38] | FI | 15.01.2020 | |
HR | 15.01.2020 | ||
LV | 15.01.2020 | ||
NL | 15.01.2020 | ||
RS | 15.01.2020 | ||
SE | 15.01.2020 | ||
NO | 15.04.2020 | ||
GR | 16.04.2020 | ||
PT | 07.06.2020 | ||
Former [2020/37] | FI | 15.01.2020 | |
HR | 15.01.2020 | ||
LV | 15.01.2020 | ||
NL | 15.01.2020 | ||
RS | 15.01.2020 | ||
SE | 15.01.2020 | ||
NO | 15.04.2020 | ||
PT | 07.06.2020 | ||
Former [2020/36] | FI | 15.01.2020 | |
NL | 15.01.2020 | ||
RS | 15.01.2020 | ||
NO | 15.04.2020 | ||
PT | 07.06.2020 | ||
Former [2020/35] | FI | 15.01.2020 | |
NL | 15.01.2020 | ||
NO | 15.04.2020 | ||
Former [2020/33] | NL | 15.01.2020 | Documents cited: | Search | [A]US2011141786 (SHEN JIE [DE], et al) [A] 1-15* paragraph [0027] - paragraph [0034]; figures 5,6 *; | [XI]EP2709261 (HUAWEI TECH CO LTD [CN]) [X] 1,15 * paragraph [0009] - paragraph [0016]; figures 1-5 * [I] 2-14; | [XDP]EP2827490 (GEN ELECTRIC [US]) [XDP] 1-15 * the whole document *; | [A] - TALLAM R M ET AL, "A carrier-based PWM scheme for neutral-point voltage balancing in three-level inverters", 2004 IEEE APPLIED POWER ELECTRONICS CONFERENCE AND EXPOSITION, APEC 04, IEEE, ANAHEIM, CA, USA, (20040222), vol. 3, doi:10.1109/APEC.2004.1296090, ISBN 978-0-7803-8269-5, pages 1675 - 1681, XP010704792 [A] 1-15 * the whole document * DOI: http://dx.doi.org/10.1109/APEC.2004.1296090 |